roofy

Violations at 1864 Wallace Avenue

Bronx, NY 10462 · BBL 2-04053-0032 · Back to the property

HPD housing violations

The newest 50 of 150 HPD violations. The city keeps the complete history.

  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 18, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective electrical outlet at west wall in the 4th room from east located at apt 2c, 3rd story, 1st apartment from east at south

    Jan 3, 2025 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east at south located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st door frame from south at west wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 2nd closet from south at west wall door, 2nd closet from south at west wall door frame, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of cold water for the fixtures at wash basin, bathtub, water closet and sink in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall, 1st door from south at west wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling, west wall, south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Provide adequate supply of hot water for the fixtures at wash basin, bathtub and sink in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Closed — Violation closed
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • BHazardous

    Repair or replace the smoke detector missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south

    Dec 14, 2024 · Apt 2C

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Closed — Violation dismissed
  • CImmediately hazardous

    Properly repair the broken or defective door lock at lobby, 1st story

    Mar 8, 2022

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 8, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Mar 8, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 8, 2022

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 8, 2022

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of free standing radiator at at public hall, 3rd story

    Mar 8, 2022

    Closed — Violation closed
  • BHazardous

    Remove all encumbrances consisting of ladders, paint buckets, plaster, bikes, sheetrock, cars, shoes and other house hold articles up to roof landing at public hall stairs, 3rd story

    Mar 8, 2022

    Open — Nov sent out
  • BHazardous

    Properly repair the broken or defective door lock bulkhead to roof

    Mar 8, 2022

    Open — Nov sent out
  • CImmediately hazardous

    Code: replace or repair the self-closing the doors that is missing or defective .. at public hall

    Mar 8, 2022

    Closed — Violation closed
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials consisting of plaster at ceiling at roof bulkhead

    Dec 1, 2021

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at ceiling at roof bulkhead

    Dec 1, 2021

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the broken or defective heavy duty lock assembly at street entrance door to building leading to vestibule , 1st story

    Dec 1, 2021

    Open — Nov sent out
  • CImmediately hazardous

    Code: arrange and make self-closing the doors at vestibule leading to public hall , 1st story

    Dec 1, 2021

    Closed — Violation closed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Dec 1, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Dec 1, 2021

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 1, 2021

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 5, 2021

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Open — Nov sent out
  • IInformation / order

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation dismissed
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jul 23, 2019

    Open — Nov sent out

DOB building violations

15 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Construction other optional

    Engineers report requested. at time of inspection observed at interior left side bedroom of apartment 2c separation of approx.1 inch at corner of interior walls and sloping floor along interior walls. also observed eroded/damaged bricks, missing mortar joints and cracks at exp.2 (left side of building) and exp.3 (rear of building).

    Dec 13, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active

ECB violations

10 ECB violations, newest first.

  • Class - 1

    At time of inspection observed at interior left side bedroom of apartment 2c separation of approx.1 inch at corner of interior walls and sloping floor along interior walls. also observed eroded/damaged bricks,

    Dec 13, 2024 · Penalty $6,250

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner; use of prohibited door hardware per bc1008.1.8 and 27-371(j) noted: bldg is multiple dwelling 3 story structure with fire escape at rear. exit passage to stre

    Apr 20, 2010 · Penalty $5,000

    Active
  • Class - 3

    Work w/o a permit. work noted: removed garage doors and replaced w/ walls w/ door and window openings. remedy: obtain a permit if feasible or restore garages to prior legal condition.

    Aug 24, 2009 · Penalty $500

    Active
  • Class - 1

    Work w/o permit. work noted: at rear of premises, the garage doors have been removed a standard size door and window was installed. the dooris approx 30" x 78" and the window is approx 3' x 5'. remedy: obtain

    Jun 12, 2009 · Penalty $1,600

    Active
  • Class - 2

    Residence has been altered for occupancy for more than the legally approved number of families. h.p.d. registration records indicate residence is legally approved for seven families, residence has been altered

    May 5, 2009 · Penalty $1,200

    Active
  • Hazardous

    Exit passageway:total obstruction heavy rope supporting basket ball loop is attached to fire escape & crosses over landing & dropladder preventing & or hindering access to dropladder also large folding table

    Sep 22, 2006 · Penalty $2,500

    Active
  • Hazardous

    Failure to maintain exterior building wall at rear of 1864 wallace avebrick garage one story 20 ft long by approx 12' deep header is saging approx 8' course of brick & stone parapit are saging motoe joint missi

    Jun 27, 2005 · Penalty $800

    Active
  • Hazardous

    No dot permit posted container in street upon inspection no dot permitposted for container in street front of 1864 wallace ave container loaded with debris from alteration material from apt 2a at same address

    Jun 27, 2005 · Penalty $400

    Active
  • Non-hazardous

    4b. 4b) test valve not working on low water cut off.

    May 5, 2005 · Penalty $350

    Active
  • Non-hazardous

    Occupancy contrary to that allowed by the c of o. c of o #275-1927 -- cellar storage--now arranged & occupied as apt at cellar. remedy: discontinue illegal use/or if feasible, file plan & obtain a new c of o.

    Sep 11, 1997

    Resolve