Violations at 1864 Wallace Avenue
Bronx, NY 10462 · BBL 2-04053-0032 · Back to the property
HPD housing violations
The newest 50 of 150 HPD violations. The city keeps the complete history.
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 4th room from east located at apt 2c, 3rd story, 1st apartment from east at south
Jan 3, 2025 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from east at south wall in the 1st room from east at south located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st door frame from south at west wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 2nd closet from south at west wall door, 2nd closet from south at west wall door frame, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at wash basin, bathtub, water closet and sink in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, 1st door from south at west wall in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, west wall, south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at wash basin, bathtub and sink in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2c, 3rd story, 1st apartment from east at south
Dec 14, 2024 · Apt 2C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective door lock at lobby, 1st story
Mar 8, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Mar 8, 2022
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 8, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 8, 2022
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 8, 2022
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at at public hall, 3rd story
Mar 8, 2022
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of ladders, paint buckets, plaster, bikes, sheetrock, cars, shoes and other house hold articles up to roof landing at public hall stairs, 3rd story
Mar 8, 2022
Open — Nov sent out - BHazardous
Properly repair the broken or defective door lock bulkhead to roof
Mar 8, 2022
Open — Nov sent out - CImmediately hazardous
Code: replace or repair the self-closing the doors that is missing or defective .. at public hall
Mar 8, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 18, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials consisting of plaster at ceiling at roof bulkhead
Dec 1, 2021
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at roof bulkhead
Dec 1, 2021
Open — Nov sent out - CImmediately hazardous
Properly repair the broken or defective heavy duty lock assembly at street entrance door to building leading to vestibule , 1st story
Dec 1, 2021
Open — Nov sent out - CImmediately hazardous
Code: arrange and make self-closing the doors at vestibule leading to public hall , 1st story
Dec 1, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 1, 2021
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 1, 2021
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 1, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 5, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 23, 2019
Open — Nov sent out
DOB building violations
15 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Engineers report requested. at time of inspection observed at interior left side bedroom of apartment 2c separation of approx.1 inch at corner of interior walls and sloping floor along interior walls. also observed eroded/damaged bricks, missing mortar joints and cracks at exp.2 (left side of building) and exp.3 (rear of building).
Dec 13, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active
ECB violations
10 ECB violations, newest first.
- Class - 1
At time of inspection observed at interior left side bedroom of apartment 2c separation of approx.1 inch at corner of interior walls and sloping floor along interior walls. also observed eroded/damaged bricks,
Dec 13, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain bldg in code compliant manner; use of prohibited door hardware per bc1008.1.8 and 27-371(j) noted: bldg is multiple dwelling 3 story structure with fire escape at rear. exit passage to stre
Apr 20, 2010 · Penalty $5,000
Active - Class - 3
Work w/o a permit. work noted: removed garage doors and replaced w/ walls w/ door and window openings. remedy: obtain a permit if feasible or restore garages to prior legal condition.
Aug 24, 2009 · Penalty $500
Active - Class - 1
Work w/o permit. work noted: at rear of premises, the garage doors have been removed a standard size door and window was installed. the dooris approx 30" x 78" and the window is approx 3' x 5'. remedy: obtain
Jun 12, 2009 · Penalty $1,600
Active - Class - 2
Residence has been altered for occupancy for more than the legally approved number of families. h.p.d. registration records indicate residence is legally approved for seven families, residence has been altered
May 5, 2009 · Penalty $1,200
Active - Hazardous
Exit passageway:total obstruction heavy rope supporting basket ball loop is attached to fire escape & crosses over landing & dropladder preventing & or hindering access to dropladder also large folding table
Sep 22, 2006 · Penalty $2,500
Active - Hazardous
Failure to maintain exterior building wall at rear of 1864 wallace avebrick garage one story 20 ft long by approx 12' deep header is saging approx 8' course of brick & stone parapit are saging motoe joint missi
Jun 27, 2005 · Penalty $800
Active - Hazardous
No dot permit posted container in street upon inspection no dot permitposted for container in street front of 1864 wallace ave container loaded with debris from alteration material from apt 2a at same address
Jun 27, 2005 · Penalty $400
Active - Non-hazardous
4b. 4b) test valve not working on low water cut off.
May 5, 2005 · Penalty $350
Active - Non-hazardous
Occupancy contrary to that allowed by the c of o. c of o #275-1927 -- cellar storage--now arranged & occupied as apt at cellar. remedy: discontinue illegal use/or if feasible, file plan & obtain a new c of o.
Sep 11, 1997
Resolve