roofy

1456 Leland Avenue

Bronx, NY 10460BBL 2-03902-0024Map

Owner of record: Tad Realty Group NY LLC

1456 Leland Avenue is a walk-up apartment building built in 1924 in Bronx, 10460. It has 4 residential units across 2 floors. The owner of record is Tad Realty Group NY LLC. HPD has recorded 172 housing violations here, most recently on August 5, 2026. 21 of the 50 most recent violations are still open.

HPD violations
172
DOB violations
5
ECB violations
0
HPD complaints
199

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 172

  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at north wall, east wall, south wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, west wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at south wall and at ceiling in the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall west wall and ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south

    Aug 5, 2026 · Apt 1F

    Open — Nov sent out
Show 40 more ↓
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Notice of issuance sent to tenant
  • A

    Refit door in the entrance located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective porcelain enamal glaze at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at shower body in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • C

    Remove all obstructions and repair all defects in at washbasin in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in bathtub drain in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • A

    Properly repair the broken or defective wood door in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 26, 2022 · Apt 2F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counter-balance springs at the 2nd north window in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain glaze at the bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approximately 5 square feet at the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east at center, the 2nd room from east at south, the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... approximately 5 square feet at the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south original violation 14535733 issued 02-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective lower glass pane at the 1st north window in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south

    Sep 2, 2021 · Apt 2F

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). (defective) located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector (defective) located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling & walls in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... at wall around the window frame (approx. 3 sq. ft.) in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective entrance door in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the broken or defective entrance door in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east

    May 21, 2019 · Apt 2R

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard

    May 8, 2019

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at front areaway, 1st story

    May 5, 2019

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of air conditioner at public hall, 2nd story

    May 2, 2019

    Closed — Violation dismissed
  • B

    Properly secure the loose 3rd and 4th wood tread up from bottom at public hall stairs, 1st story

    May 2, 2019

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective wood tread 4th up from bottom at public hall stairs, 1st story

    May 1, 2019

    Closed — Violation dismissed
  • A

    Replace with new the missing electrical outlet cover at south wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 2R

    Closed — Violation dismissed
  • A

    Replace with new the missing electrical outlet cover at east and north wall in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 2R

    Closed — Violation dismissed

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 1S

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 1S

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 1S

    Close
  • Water leak

    Damp spot

    Aug 4, 2026 · Apt 1S

    Close
  • Water leak

    Heavy flow

    Aug 23, 2021 · Apt 2F

    Close
  • Plumbing

    Bathtub/shower

    Aug 23, 2021 · Apt 2F

    Close
  • Appliance

    Refrigerator

    Aug 23, 2021 · Apt 2F

    Close
  • Paint/plaster

    Ceiling

    Feb 23, 2021 · Apt 1F

    Close
  • Electric

    Outlet/switch

    Feb 23, 2021 · Apt 1F

    Close
  • Paint/plaster

    Wall

    Feb 23, 2021 · Apt 1F

    Close
Show 40 more ↓
  • Plumbing

    Bathtub/shower

    Oct 9, 2020 · Apt 2F

    Close
  • Appliance

    Electric/gas range

    Oct 9, 2020 · Apt 2F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 31, 2019 · Apt STAIR

    Close
  • Safety

    Fire escape

    May 31, 2019 · Apt STAIR

    Close
  • General

    Signage missing

    May 19, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 19, 2019 · Apt 2R

    Close
  • Water leak

    Heavy flow

    May 12, 2019 · Apt BASEME

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 10, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 3, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 2, 2019 · Apt BLDG

    Close
  • Safety

    Fire escape

    May 2, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 2, 2019 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 1, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 30, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 27, 2019 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Apr 27, 2019 · Apt 2F

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 27, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 27, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 27, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 26, 2019 · Apt 2R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 26, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 26, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 24, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 22, 2019 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 22, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 19, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 16, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 15, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 15, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 15, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Apr 15, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 14, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 13, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 13, 2019 · Apt 2R

    Close
  • General

    Bell/buzzer/intercom

    Apr 13, 2019 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 13, 2019 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1924
Floors
2
Residential units
4
Building area
3,850 ft²
Lot area
2,250 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3902 / 24
Assessed value
$493,200
Landmark / historic district
No

HPD registration #205127, last renewed Oct 28, 2025.

Questions about 1456 Leland Avenue

Who owns 1456 Leland Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Tad Realty Group NY LLC.

Does 1456 Leland Avenue have violations?

Yes. NYC HPD has recorded 172 housing violations at this property.

Is 1456 Leland Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1456 Leland Avenue built?

City records list 1924 as the year it was built.

How many apartments are in 1456 Leland Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.