1456 Leland Avenue
Bronx, NY 10460BBL 2-03902-0024Map
Owner of record: Tad Realty Group NY LLC
1456 Leland Avenue is a walk-up apartment building built in 1924 in Bronx, 10460. It has 4 residential units across 2 floors. The owner of record is Tad Realty Group NY LLC. HPD has recorded 172 housing violations here, most recently on August 5, 2026. 21 of the 50 most recent violations are still open.
- HPD violations
- 172
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 199
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 172
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at north wall, east wall, south wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, west wall in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall and at ceiling in the 1st room from north at center located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall west wall and ceiling in the bathroom located at apt 1f, 1st story, 1st apartment from east at south
Aug 5, 2026 · Apt 1F
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Notice of issuance sent to tenant - ANon-hazardous
Refit door in the entrance located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamal glaze at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at shower body in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Remove all obstructions and repair all defects in at washbasin in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in bathtub drain in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective wood door in the 1st room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south
Jul 26, 2022 · Apt 2F
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective counter-balance springs at the 2nd north window in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at the bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 5 square feet at the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 2nd room from east at center, the 2nd room from east at south, the 3rd room from east located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Open — Defect letter issued - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 5 square feet at the north wall in the bathroom located at apt 2f, 2nd story, 1st apartment from east at south original violation 14535733 issued 02-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective lower glass pane at the 1st north window in the 2nd room from east at south located at apt 2f, 2nd story, 1st apartment from east at south
Sep 2, 2021 · Apt 2F
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). (defective) located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector (defective) located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling & walls in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at wall around the window frame (approx. 3 sq. ft.) in the bathroom located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective entrance door in the 1st room from east at south located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the broken or defective entrance door in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
May 21, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
May 8, 2019
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. at front areaway, 1st story
May 5, 2019
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of air conditioner at public hall, 2nd story
May 2, 2019
Closed — Violation dismissed - BHazardous
Properly secure the loose 3rd and 4th wood tread up from bottom at public hall stairs, 1st story
May 2, 2019
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective wood tread 4th up from bottom at public hall stairs, 1st story
May 1, 2019
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical outlet cover at south wall in the 1st room from east at north located at apt 2r, 2nd story, 1st apartment from north at east
Jan 30, 2019 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical outlet cover at east and north wall in the 2nd room from east located at apt 2r, 2nd story, 1st apartment from north at east
Jan 30, 2019 · Apt 2R
Closed — Violation dismissed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Aug 4, 2026 · Apt 1S
Close - Paint/plaster
Ceiling
Aug 4, 2026 · Apt 1S
Close - Paint/plaster
Wall
Aug 4, 2026 · Apt 1S
Close - Water leak
Damp spot
Aug 4, 2026 · Apt 1S
Close - Water leak
Heavy flow
Aug 23, 2021 · Apt 2F
Close - Plumbing
Bathtub/shower
Aug 23, 2021 · Apt 2F
Close - Appliance
Refrigerator
Aug 23, 2021 · Apt 2F
Close - Paint/plaster
Ceiling
Feb 23, 2021 · Apt 1F
Close - Electric
Outlet/switch
Feb 23, 2021 · Apt 1F
Close - Paint/plaster
Wall
Feb 23, 2021 · Apt 1F
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Oct 9, 2020 · Apt 2F
Close - Appliance
Electric/gas range
Oct 9, 2020 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
May 31, 2019 · Apt STAIR
Close - Safety
Fire escape
May 31, 2019 · Apt STAIR
Close - General
Signage missing
May 19, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
May 19, 2019 · Apt 2R
Close - Water leak
Heavy flow
May 12, 2019 · Apt BASEME
Close - Unsanitary condition
Garbage/recycling storage
May 10, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 10, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 10, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
May 3, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 2, 2019 · Apt BLDG
Close - Safety
Fire escape
May 2, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 2, 2019 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
May 1, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 30, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 27, 2019 · Apt BLDG
Close - Water leak
Damp spot
Apr 27, 2019 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Apr 27, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 27, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2019 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Apr 26, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 26, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 24, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 22, 2019 · Apt BLDG
Close - Plumbing
Water supply
Apr 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 19, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 16, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 15, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 15, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 14, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 13, 2019 · Apt 2R
Close - General
Bell/buzzer/intercom
Apr 13, 2019 · Apt BLDG
Close - Plumbing
Water supply
Apr 13, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1924
- Floors
- 2
- Residential units
- 4
- Building area
- 3,850 ft²
- Lot area
- 2,250 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 18
- Block / lot
- 3902 / 24
- Assessed value
- $493,200
- Landmark / historic district
- No
HPD registration #205127, last renewed Oct 28, 2025.
Questions about 1456 Leland Avenue
Who owns 1456 Leland Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Tad Realty Group NY LLC.
Does 1456 Leland Avenue have violations?
Yes. NYC HPD has recorded 172 housing violations at this property.
Is 1456 Leland Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1456 Leland Avenue built?
City records list 1924 as the year it was built.
How many apartments are in 1456 Leland Avenue?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.