roofy

1341 Fteley Avenue

Bronx, NY 10472BBL 2-03870-0050Map

Owner of record: 1321 Mazel Adar LLC

1341 Fteley Avenue is a walk-up apartment building built in 1920 in Bronx, 10472. It has 8 residential units across 3 floors. The owner of record is 1321 Mazel Adar LLC. HPD has recorded 20 housing violations here, most recently on February 2, 2026. 1 of the 20 most recent violations are still open.

HPD violations
20
DOB violations
0
ECB violations
0
HPD complaints
32

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 20

  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Feb 2, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at basement

    Feb 2, 2026

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st apartment from south at west

    Jan 13, 2026 · Apt 1B

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective glass pane at buildings entrance door at public hall

    Jan 13, 2026

    Closed — Violation dismissed
Show 10 more ↓
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1b, 1st apartment from south at west

    Jan 13, 2026 · Apt 1B

    Closed — Violation dismissed
  • B

    Refit apartment entrance door in the entrance located at apt 1b, 1st story, 1st apartment from south at west

    Sep 21, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Sep 21, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective glass at upper window sash at 1st window from north at east in the 2nd room from east located at apt 1b, 1st story, 1st apartment from south at west

    Sep 21, 2025 · Apt 1B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Sep 21, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west

    Sep 21, 2025 · Apt 1B

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floors at building front , 1st story

    Sep 21, 2025

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder using appropriate nuts and bolts [ east exterior wall] at fire escape

    Aug 12, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ....upper window sash window at west wall in the 2nd room from east at north located at apt 1b, 1st apartment from south at west

    Jun 21, 2025 · Apt 1B

    Open — Nov certified late
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Unsanitary condition

    Sewage

    Jun 21, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jun 21, 2026 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jan 19, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jan 19, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Jan 19, 2026 · Apt 1B

    Close
  • Plumbing

    Sewer

    Jan 19, 2026 · Apt 1B

    Close
Show 22 more ↓
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Jan 19, 2026 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jan 7, 2026 · Apt 1B

    Close
  • Plumbing

    Bathtub/shower

    Jan 7, 2026 · Apt 1B

    Close
  • Water leak

    Slow leak

    Jan 7, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Jan 7, 2026 · Apt 1B

    Close
  • Door/window

    Window pane

    Sep 18, 2025 · Apt 1B

    Close
  • Door/window

    Door

    Sep 18, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 18, 2025 · Apt 1B

    Close
  • Safety

    Window guard broken/missing

    Sep 18, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    Sep 18, 2025 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    Jun 9, 2025 · Apt 1B

    Close
  • Door/window

    Window frame

    Jun 4, 2025 · Apt 1B

    Close
  • Unsanitary condition

    Sewage

    May 17, 2025 · Apt 1B

    Close
  • Water leak

    Slow leak

    May 16, 2025 · Apt 1B

    Close
  • Door/window

    Window frame

    May 12, 2025 · Apt 1B

    Close
  • Door/window

    Window frame

    Apr 17, 2025 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Dec 31, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 31, 2024 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2018 · Apt 2R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
3
Residential units
8
Building area
3,524 ft²
Lot area
2,442 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3870 / 50
Assessed value
$313,650
Landmark / historic district
No

HPD registration #229298, last renewed Aug 23, 2025.

Questions about 1341 Fteley Avenue

Who owns 1341 Fteley Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1321 Mazel Adar LLC.

Does 1341 Fteley Avenue have violations?

Yes. NYC HPD has recorded 20 housing violations at this property.

Is 1341 Fteley Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1341 Fteley Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 1341 Fteley Avenue?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.