roofy

Violations at 1779 Westchester Avenue

Bronx, NY 10472 · BBL 2-03786-0001 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

21 DOB violations, newest first.

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Emergency none

    Partially demolish the building to fully demolish approx 70ft w x 60ft fire damaged portion of building to face of masonry fire walls at exp # 3 & #4 . coordinate w/fdny battalion 18 at [email protected]/ 718-430-0218. grade and fence site at demolished portion of the bldg

    Feb 8, 2021

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Install approx. 140' linear feet construction fence to be erected 12' feet from the face of the building with approx. 80 linear feet along exp#1 westester avenue & approx.60 linear feet along exp#2 st.lawrence avenue to secure against unauthorized access and to safeguard public

    Jan 29, 2021

    Dob violation - dismissed
  • Construction other optional

    Structure rendered non-compliant. building sustained extensive damage due to fire and firefighting operations consisting of partial roof collapsed, charred wood joists, open fire rated walls, missing windows, smoke and water damage throughout.

    Jan 28, 2021

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Marquee other required

    Cmq-marquee other required

    Feb 19, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Marquee other required

    Cmq-marquee other required

    Apr 28, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 25, 1994

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Oct 19, 1992

    Vw-violation work without permit - active

ECB violations

21 ECB violations, newest first.

  • Class - 2

    Bc 3307.1 scope. observed alteration of 2 story building with jersey barriers w/ fence on top, temporary pedestrian walkway, and office on the street side @ expo 2. upon request for dot permits, none was provid

    Oct 7, 2026 · Penalty $2,500

    Active
  • Class - 2

    3301.1.2 fire code. observed alteration of 2 story building with oxygen & acetylene tanks stored @ expo 2 interior of jobsite. upon request for fdny permits for storage of oxygen & acetylene on site, none was p

    Oct 7, 2026 · Penalty $2,500

    Active
  • Class - 2

    At the time of inspection of a 2-story alteration job, at exp#1, i observed the construction fence obstructing the pedestrian path between the fence and the train station steps. the required 5-foot-wide walkway

    Oct 1, 2026 · Penalty $2,400

    Active
  • Class - 1

    At the time of inspection of the 2-story alteration jobsite, i observed a worker performing overhead framing while standing on a baker scaffold. the scaffold platform had missing/inadequate guardrails, leaving

    Oct 1, 2026 · Penalty $2,500

    Active
  • Class - 2

    At time of inspection, active 2-story alteration building observed with poor housekeeping conditions throughout the site. at exposure 1 first floor, debris and materials were observed creating tripping hazards

    Jul 9, 2026 · Penalty $1,250

    Resolve
  • Class - 2

    At time of inspection, active 2-story alteration building observed. required sidewalk shed documents, including shed logs and approved plans, were requested but not provided at time of inspection. failure to ma

    Jul 9, 2026 · Penalty $1,250

    Active
  • Class - 2

    At time of inspection, active 2-story alteration building observed with scaffolds not fully planked. missing planking was observed where the scaffold met the facade, creating wide gaps in the work platform. add

    Jul 9, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    At time of inspection, active 2-story alteration building observed with multiple elevated work areas lacking required guardrail protection, including the 2nd-floor work area, interior scaffold, and temporary 2-

    Jul 9, 2026 · Penalty $5,000

    Active
  • Class - 2

    At time of inspection of a 2-story building, i observed sidewalk shed erected exp#1 with valid permit during my inspection i noticed sidewalk shed has no contact information panel. this create a hazardous situa

    Sep 17, 2025 · Penalty $6,250

    Active
  • Class - 2

    During my inspection of an active horizontal enlargement. permit #x00802992, i observed a temporary pedestrian pathway in place, exposure 2, st lawrence avenue, not maintained as per the dot stipulation, missin

    Mar 27, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    During my inspection of an active 2-story alt. horizontal enlargement, with ongoing exterior soe in progress. i requested the approved soe plans from cs on site and was told, no approved dob soe on site. i then

    Mar 27, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    3301.9.1 fence project information panel. observed closed jobsite with no project information panel posted on the construction fence. when a job is enclosed a project information panel must be post on the const

    Jan 2, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Observed construction fence along the perimeter of jobsite. graffiti covering the construction fence on exposure 1 and 2. construction fence must be hunter green only through entirety of the fence. maintain con

    Jan 2, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Cracks in wall missing bricks above school yard, some patching has been done in the past which has opened up again many broken brick and missing one over 30 all over wall., repair and/or replace

    Oct 1, 2024

    Resolve
  • Class - 1

    Cracks in stucco along lawrence ave above sidewalk & school yard areas bulging no longer attached to the wall one area is lower in the middle of the wall about four feet wide other areas on the corner above ret

    Oct 1, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to maintain construction fence.at time of inspection of demolition job site observed construction fence poorly maintained unlawful vandilized markings at fence at exp #1 #4 for public safety code stipul

    Apr 5, 2022

    Resolve
  • Class - 2

    Failure to provide approved/accepted construction documents. at the time of my inspection,i observed that the competent person could not provide or locate an approved/accepted set of drawings installed under pe

    Oct 25, 2021

    Resolve
  • Class - 2

    Failure to comply w/manufacturer specifications. at the time of my inspection,i observed that there was a cut frame incorporated into the approx 30'high supported scaffold at exp#1,as well as several missing pi

    Oct 25, 2021

    Resolve
  • Non-hazardous

    Work without a permit. work noted constructed a wood mezzaine approx 10'x10'8' high at rear. remove illegal wood mezzanine.

    Mar 15, 1999 · Penalty $250

    Resolve
  • Non-hazardous

    Use of illegal hardware (scissor gate obstructing door width) scissor gate in open postion during time of insp.) 2nd sty. factory front and rear doors. remedy: remove scissor gate.

    Oct 19, 1992 · Penalty $175

    Resolve
  • Non-hazardous

    Failure to maintain defect is missing masonry wall broken defective at frdon mezzainie level remedy repair masonry wall at mezzanine level

    Aug 31, 1990 · Penalty $1,000

    Resolve