Violations at 1779 Westchester Avenue
Bronx, NY 10472 · BBL 2-03786-0001 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
21 DOB violations, newest first.
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Emergency none
Partially demolish the building to fully demolish approx 70ft w x 60ft fire damaged portion of building to face of masonry fire walls at exp # 3 & #4 . coordinate w/fdny battalion 18 at [email protected]/ 718-430-0218. grade and fence site at demolished portion of the bldg
Feb 8, 2021
Dob violation - dismissed - Immediate emergency anythingoptional
Install approx. 140' linear feet construction fence to be erected 12' feet from the face of the building with approx. 80 linear feet along exp#1 westester avenue & approx.60 linear feet along exp#2 st.lawrence avenue to secure against unauthorized access and to safeguard public
Jan 29, 2021
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant. building sustained extensive damage due to fire and firefighting operations consisting of partial roof collapsed, charred wood joists, open fire rated walls, missing windows, smoke and water damage throughout.
Jan 28, 2021
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Feb 19, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Marquee other required
Cmq-marquee other required
Apr 28, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Construction other optional
C-construction other optional
May 25, 1994
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Oct 19, 1992
Vw-violation work without permit - active
ECB violations
21 ECB violations, newest first.
- Class - 2
Bc 3307.1 scope. observed alteration of 2 story building with jersey barriers w/ fence on top, temporary pedestrian walkway, and office on the street side @ expo 2. upon request for dot permits, none was provid
Oct 7, 2026 · Penalty $2,500
Active - Class - 2
3301.1.2 fire code. observed alteration of 2 story building with oxygen & acetylene tanks stored @ expo 2 interior of jobsite. upon request for fdny permits for storage of oxygen & acetylene on site, none was p
Oct 7, 2026 · Penalty $2,500
Active - Class - 2
At the time of inspection of a 2-story alteration job, at exp#1, i observed the construction fence obstructing the pedestrian path between the fence and the train station steps. the required 5-foot-wide walkway
Oct 1, 2026 · Penalty $2,400
Active - Class - 1
At the time of inspection of the 2-story alteration jobsite, i observed a worker performing overhead framing while standing on a baker scaffold. the scaffold platform had missing/inadequate guardrails, leaving
Oct 1, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection, active 2-story alteration building observed with poor housekeeping conditions throughout the site. at exposure 1 first floor, debris and materials were observed creating tripping hazards
Jul 9, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection, active 2-story alteration building observed. required sidewalk shed documents, including shed logs and approved plans, were requested but not provided at time of inspection. failure to ma
Jul 9, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection, active 2-story alteration building observed with scaffolds not fully planked. missing planking was observed where the scaffold met the facade, creating wide gaps in the work platform. add
Jul 9, 2026 · Penalty $2,500
Resolve - Class - 1
At time of inspection, active 2-story alteration building observed with multiple elevated work areas lacking required guardrail protection, including the 2nd-floor work area, interior scaffold, and temporary 2-
Jul 9, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection of a 2-story building, i observed sidewalk shed erected exp#1 with valid permit during my inspection i noticed sidewalk shed has no contact information panel. this create a hazardous situa
Sep 17, 2025 · Penalty $6,250
Active - Class - 2
During my inspection of an active horizontal enlargement. permit #x00802992, i observed a temporary pedestrian pathway in place, exposure 2, st lawrence avenue, not maintained as per the dot stipulation, missin
Mar 27, 2025 · Penalty $2,500
Resolve - Class - 2
During my inspection of an active 2-story alt. horizontal enlargement, with ongoing exterior soe in progress. i requested the approved soe plans from cs on site and was told, no approved dob soe on site. i then
Mar 27, 2025 · Penalty $1,250
Resolve - Class - 2
3301.9.1 fence project information panel. observed closed jobsite with no project information panel posted on the construction fence. when a job is enclosed a project information panel must be post on the const
Jan 2, 2025 · Penalty $1,250
Resolve - Class - 2
Observed construction fence along the perimeter of jobsite. graffiti covering the construction fence on exposure 1 and 2. construction fence must be hunter green only through entirety of the fence. maintain con
Jan 2, 2025 · Penalty $1,250
Resolve - Class - 2
Cracks in wall missing bricks above school yard, some patching has been done in the past which has opened up again many broken brick and missing one over 30 all over wall., repair and/or replace
Oct 1, 2024
Resolve - Class - 1
Cracks in stucco along lawrence ave above sidewalk & school yard areas bulging no longer attached to the wall one area is lower in the middle of the wall about four feet wide other areas on the corner above ret
Oct 1, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain construction fence.at time of inspection of demolition job site observed construction fence poorly maintained unlawful vandilized markings at fence at exp #1 #4 for public safety code stipul
Apr 5, 2022
Resolve - Class - 2
Failure to provide approved/accepted construction documents. at the time of my inspection,i observed that the competent person could not provide or locate an approved/accepted set of drawings installed under pe
Oct 25, 2021
Resolve - Class - 2
Failure to comply w/manufacturer specifications. at the time of my inspection,i observed that there was a cut frame incorporated into the approx 30'high supported scaffold at exp#1,as well as several missing pi
Oct 25, 2021
Resolve - Non-hazardous
Work without a permit. work noted constructed a wood mezzaine approx 10'x10'8' high at rear. remove illegal wood mezzanine.
Mar 15, 1999 · Penalty $250
Resolve - Non-hazardous
Use of illegal hardware (scissor gate obstructing door width) scissor gate in open postion during time of insp.) 2nd sty. factory front and rear doors. remedy: remove scissor gate.
Oct 19, 1992 · Penalty $175
Resolve - Non-hazardous
Failure to maintain defect is missing masonry wall broken defective at frdon mezzainie level remedy repair masonry wall at mezzanine level
Aug 31, 1990 · Penalty $1,000
Resolve