roofy

Violations at 1770 East 172 Street

Bronx, NY 10472 · BBL 2-03785-0025 · Back to the property

HPD housing violations

The newest 50 of 412 HPD violations. The city keeps the complete history.

  • BHazardous

    Provide unlockable slide bolt and lock or hook on roof door that allows re entry from roof to public hall at public hall stairs, 5th story

    Oct 19, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening panic bar installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Oct 19, 2026

    Open — Nov sent out
  • BHazardous

    Provide unlockable slide bolt and lock or hook on roof door that allows re entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Oct 19, 2026

    Open — Nov sent out
  • BHazardous

    Remove the illegal fastening panic bar installed at metal gate at intermediate landing that does not allow re-entry to public hall at public hall stairs, 5th story

    Oct 19, 2026

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 6 inches from window sill at 2nd fire escape from north at east exterior wall at fire escape, 4th story

    Oct 19, 2026

    Open — Nov sent out
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 6 inches from window sill at 1st fire escape from east at north exterior wall at fire escape, 5th story

    Oct 19, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd private hallway from north located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    May 30, 2026 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st private hallway from north located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    May 30, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    M/d law abate the nuisance consisting of broken vinyl floor tiles in the 1st room from east located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Provide glass at top pane window sash at east wall, at 1st story intermediate landing at public hall stairs, section ''1770''

    Apr 15, 2026

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective crack window at top pane window sash at east wall, at 1st story intermediate landing at public hall stairs, section ''1770''

    Apr 15, 2026

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 1st room from east located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Not complied with
  • BHazardous

    Properly repair with similar material the broken or defective wooden subfloor sinking in the 1st room from east located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective at wooden subfloors and vyinl tiles in the private hallway located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from east located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl tiles. on thefloor in the foyer located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet at fill valve at east wall, in the bathroom located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective reglazing porcelain enamel finish by methor of reglazing at bathtub in the bathroom located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • ANon-hazardous

    Provide escutcheon plate at top and bottom of riser in the bathroom located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at north wall in the kitchen located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Closed — Violation closed
  • BHazardous

    Properly repair or replace the broken or defective warpping counter top at bottom cabinet at west wall in the kitchen located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • BHazardous

    Properly secure the loose top wooden cabinet at west wall in the kitchen located at apt 3e, 3rd story, 2nd apartment from west at north , section ''1770''

    Apr 15, 2026 · Apt 3E

    Open — Nov sent out
  • CImmediately hazardous

    Provide ready access to buildings heating system door locked at boiler room

    Feb 7, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1e, 1st story, 1st apartment from west at north , section ''1770''

    Feb 7, 2026 · Apt 1E

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceeding 130f degrees in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north

    Feb 1, 2026 · Apt 4D

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 2g, 2nd story, 2nd apartment from east at south

    Jul 23, 2025 · Apt 2G

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroom located at apt 2g, 2nd story, 2nd apartment from east at south

    Jul 23, 2025 · Apt 2G

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3j, 3rd story, 2nd apartment from west at north

    Apr 8, 2025 · Apt 3J

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3j, 3rd story, 2nd apartment from west at north

    Apr 8, 2025 · Apt 3J

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 1e, 1st story, 1st apartment from west at north

    Jan 27, 2025 · Apt 1E

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1e, 1st story, 1st apartment from west at north

    Jan 27, 2025 · Apt 1E

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4d, 4th story, 1st apartment from west at north , section ''1770''

    Jan 11, 2025 · Apt 4D

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of hot water exceding 130 degrees in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north , section ''1770''

    Jan 11, 2025 · Apt 4D

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 4d, 4th story, 1st apartment from west at north , section ''1770''

    Jan 11, 2025 · Apt 4D

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at west located at apt 4d, 4th story, 1st apartment from west at north , section ''1770''

    Jan 11, 2025 · Apt 4D

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 4d, 4th story, 1st apartment from west at north , section ''1770''

    Jan 11, 2025 · Apt 4D

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective defective hinges and latch at vestibule , 1st story

    Dec 5, 2024

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the foyer located at apt 3h, 3rd story, 1st apartment from west at north

    Nov 6, 2024 · Apt 3H

    Closed — Violation dismissed
  • CImmediately hazardous

    M/d law abate the nuisance consisting of lockable slide bolt at door in the entrance located at apt 3b, 3rd story, 2nd apartment from east at south , section ''1770''

    Oct 10, 2024 · Apt 3B

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the smoke detector defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south , section ''1770''

    Oct 10, 2024 · Apt 3B

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south , section ''1770''

    Oct 10, 2024 · Apt 3B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective lower sash spring balance at fire escape window in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south , section ''1770''

    Oct 10, 2024 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south , section ''1770''

    Oct 10, 2024 · Apt 3B

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Oct 7, 2024 · Apt 3A

    Closed — Violation closed
  • BHazardous

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner protruding more than 6 inches from window sill at 4th story balcony at fire escape from west at north exterior wall [ inside front court]. at fire escape

    Sep 10, 2024

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 16, 2024 · Apt 2F

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at west located at apt 2f, 2nd story, 1st apartment from east at south

    Jul 16, 2024 · Apt 2F

    Open — Violation will be reinspected

DOB building violations

18 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Construction other optional

    Due to vehicle impacting building

    Dec 25, 2017

    Dob violation - dismissed
  • Construction other optional

    Due to vehicle impacting building

    Dec 21, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations

5 ECB violations, newest first.

  • Class - 2

    Work without permit; noted at basement level outside super's apartment installed water and waste lines for washer., obtain all permits

    Oct 1, 2026 · Penalty $1,250

    Active
  • Class - 2

    Work without permit; noted at basement level outside super's apartment installed 220- volt electrical line for dryer., obtain all permits

    Oct 1, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to file required annual boiler inspection reports for low-pressure boiler 20000013584y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo

    Dec 16, 2024 · Penalty $312

    Active
  • Class - 2

    Sidewalk shed parapet panel.note: at the time of inspection observed a heavy duty sidewalk shed installed at exposure one and exposure two for the building 1770-1772 east 172 street.pedestrians walking under th

    Oct 3, 2019

    Resolve
  • Class - 2

    9h10,5k11,3e1,29q3,35q3,2d6,40i11,32o2,33o2,34o2,36o2,70o2,73o2,74o2. 2 secures bell under car. 40- replace over head door

    Oct 5, 2010

    Resolve