Violations at 1117 Noble Avenue
Bronx, NY 10472 · BBL 2-03749-0071 · Back to the property
HPD housing violations
The newest 50 of 112 HPD violations. The city keeps the complete history.
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile in the foyer located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of vinyl tiles on the floor in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets faucet at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet toilet bowl in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile on the floor in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2R
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Paint or post a sign indicating floors missing at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 21, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets water diver cartridge in bathtub, single valve in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles (cut hazard) in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective crack water tank, cover in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly secure the loose at water closet (cause a cut hazard) in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet at water closet in the bathroom located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective entrance door beyond repair in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken vinyl tiles not a cut hazard in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective door off hinges at closet at east wall in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at south wall in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at ceramic tiles at floor in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective silicone chaulking around sink at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective at lower cabinet at sink at west wall in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the kitchen located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of vyinl tiles at floor causing a trip hazard in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective wooden subfloors rotten and sinking at floor in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective at entrance door beyond repair in the 2nd room from north located at apt 2r, 2nd story, 1st apartment from south at west
Apr 21, 2026 · Apt 2R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective hardwood floor under vinyl floor tiles in the 4th room from north located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective spring balance at upper window sash at first window from south at west in the 4th room from north located at apt 2r, 2nd story, 1st apartment from east at south
Sep 16, 2025 · Apt 2R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Sep 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all ceiling light fixtures and wall outlets at all stories at public hall
Sep 15, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed
DOB building violations
11 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
ECB violations
3 ECB violations, newest first.
- Class - 2
Failure to comply w/commissioner's order to file a c/c w/the dob. ecb violation #34891751y. remedy: file a c/c.
Apr 14, 2012 · Penalty $800
Resolve - Class - 2
Failure to maintain building in code-compliant manner noted: on 2nd flapt 2f (front of building) right hand side of hallway wall (facing front of building) has settled approx 2" over a 3'span. unable to access
May 5, 2011 · Penalty $500
Active - Non-hazardous
Failure to file a 2005 annual boiler report with this department. remedy:file a current bo-9 inspection form as required.
Nov 30, 2006 · Penalty $250
Active