roofy

Violations at 1090 Croes Avenue

Bronx, NY 10472 · BBL 2-03723-0048 · Back to the property

HPD housing violations

The newest 50 of 129 HPD violations. The city keeps the complete history.

  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceilng (vestibule) at public hall at north , 1st story, section ''1098'', at north

    Apr 17, 2026

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling (vestibule) at public hall at north , 1st story, section ''1098'', at north

    Apr 17, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective repair fire retardant material at ceiling and south wall (vestibule) at public hall at north , 1st story, section ''1098'', at north

    Apr 17, 2026

    Closed — Violation closed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation basebord cover at south wall in the private hallway located at apt 1oa, 1st story, 2nd apartment from south at west

    Oct 3, 2025 · Apt 1OA

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 3rd room from north at west located at apt 1oa, 1st story, 2nd apartment from south at west

    Oct 3, 2025 · Apt 1OA

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective connection waste line at sink in the kitchen located at apt 1oa, 1st story, 2nd apartment from south at west

    Oct 3, 2025 · Apt 1OA

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective make metal gate openable at fire escape window in the 3rd room from east at south located at apt 10a, 1st story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Properly repair or replace the broken or defective spring balance at lower window sash at fire escape window causing guillotine effect in the 3rd room from east at south located at apt 10a, 1st story, 2nd apartment from south at west

    Sep 9, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the west wall in the private hallway located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall, south wall in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall, 1st window frame from west at north wall in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the east wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • CImmediately hazardous

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Open — Nov sent out
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd closet from north at east wall door frame, north wall in the private hallway located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, south wall, east wall, west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east at south located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from west at north wall in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Maintain on the premises and make available to the department upon request records of installation and maintenance of smoke detectors in the building.

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • CImmediately hazardous

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Cleanse to the satisfaction of this department the mold at ceramic wall tiles at the north wall and the east wall in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st riser from south at west wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Open — Not complied with
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the north wall, baseboard at west wall, baseboard at north wall, baseboard at south wall, 1st door frame from north at east wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the ceiling, baseboard at east wall, baseboard at west wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st closet from east at south wall wall in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st door from north at east wall, 1st door frame from north at east wall, 1st door from south at west wall in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Open — Not complied with
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st window frame from west at north wall in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic wall tiles at the north wall and the east wall in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective marble saddle at bathroom entrance in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective connection at the base sink wasteline in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective spring balances at lower sash of north 1 window in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall, 3rd closet from north at east wall door, baseboard at east wall, 1st closet from north at east wall door, 1st closet from north at east wall door frame, 3rd closet from north at east wall door frame in the private hallway located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the 3rd room from east at south located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, ceiling, north wall, east wall in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, north wall, ceiling in the bathroom located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • CImmediately hazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color approximately 10 square feet of loose plaster at the ceiling in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation dismissed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall, baseboard at north wall, baseboard at west wall, baseboard at south wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Closed — Violation closed
  • ANon-hazardous

    Paint metal in accordance with dept. regulation the 1st radiator from north at east wall, 1st riser from south at west wall in the 3rd room from east at north located at apt 10a, 1st story, 2nd apartment from south at west

    Jul 15, 2025 · Apt 10A

    Open — Not complied with
  • BHazardous

    Properly repair or replace the broken or defective the lower sash balances to the 1st and 2nd window at west in the 2nd room from north at west located at apt 10a, 1st story, 2nd apartment from south at west , section ''south''

    Jul 11, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective the commercial tile floor in the kitchen located at apt 10a, 1st story, 2nd apartment from south at west , section ''south''

    Jul 11, 2025 · Apt 10A

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective the mortise lockset at entrance door to apt in the entrance located at apt 10a, 1st story, 2nd apartment from south at west , section ''south''

    Jul 11, 2025 · Apt 10A

    Closed — Violation dismissed

DOB building violations

16 DOB violations, newest first.

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 14, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 14, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Feb 3, 2006

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Mar 28, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Apr 30, 1996

    Dob violation - active
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Apr 30, 1996

    Dob violation - active
  • Emergency none

    Egncy-emergency none

    Apr 10, 1996

    Dob violation - active
  • Unsafe buildings none

    Ub-unsafe buildings none

    Apr 9, 1996

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 19, 1989

    Dob violation - dismissed

ECB violations

26 ECB violations, newest first.

  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35298090p issued on 01/13/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with the comm

    Mar 31, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35298090p issued on 01/13/18 and to file a certificate of correcti0n pursuant to 28-201.1 and 1rcny 102-01. failure to maintain building

    Feb 18, 2018 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: at 1st floor, apt "c", south east part, at kids bedroom, leak in the ceiling making flood of water on the floor very close to electric wall switch

    Jan 13, 2018 · Penalty $250

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35245151k issued on 03/15/17 & to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01 for c of c. rmdy: comply with co

    Jan 13, 2018 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation#35245751k issued on 03/16/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissio

    Dec 1, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35245152m issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for c of c. remedy: comply w/comm's order &/or file a c of c.

    Nov 4, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35245151k issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for c of c. occupancy contrary to that allowed for apt#2b conve

    Oct 11, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in sum/vio#35245152m issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to maintain bldg in code complia

    Sep 21, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in sum/vio#35245151k issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by the c of o or the dob records

    Sep 9, 2017

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in sum/vio#35245152m issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to maintain bldg in code complia

    Aug 5, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35245151k issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply w/comm's order &/or file a

    Jun 29, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35245152m issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply w/comm's order &/or file a c

    Jun 29, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/vio # 35242757k issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply with commissione

    May 12, 2017

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/vio # 35245152m issued on 03/15/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply with commissioner's order &/or file

    May 12, 2017 · Penalty $2,000

    Resolve
  • Class - 2

    Work w/o a permit. noted: at 3rd story apt. 2b n-w section of bldg, apt. layout change, partition & door installed to create new rooms to beused as sros,no living room space. remedy: obtain permit or restore to

    Mar 15, 2017 · Penalty $800

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner. use of prohibited door &/or hardware per bc1008.18;27-371(j). noted: at 3rd story apt. 2bn-w section of bldg. at room leading to fire escape window door has a

    Mar 15, 2017 · Penalty $1,000

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or dob records. noted: at 3rd story n-w section of bldg apt. 2b was illegally converted into a class "a" apt. with 2 sros. sros have they locking device, persona

    Mar 15, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    B254,15,40,50. 50a-flue support substandard; 50b-flue to chimney connection leaking collapsing plaster spalling chimney cement; 50c-boiler jacket is open unsecured insulation removed; 15 openings walls ceiling

    Jun 24, 2015 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to post contractor's sign on sidewalk shed. remedy:provide contractor's sign.

    Jun 16, 2006 · Penalty $250

    Resolve
  • Hazardous

    Failure to maintain exterior brick bldg wall. defect is: large cracks,bulging brick work, eroded mortar joints, rusted sagging lintels and leaning parapet walls at various locations. remedy: immediately erect a

    Feb 2, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to comply with commissioner's order in that vi #34465671m issued 3/23/05 for residence bldg altered for occupancy as a dwelling for more than the legally approved number of families. bldg dept certifica

    Jul 21, 2005 · Penalty $1,500

    Resolve
  • Non-hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families.building department certificate of occupancy #51957 indicates residence is legally approved for 33 families re

    Mar 23, 2005 · Penalty $7,550

    Resolve
  • Non-hazardous

    Failure to maintain exterior of bldg. defect is: masonry mortor is missing & defective. parapet wall is leaning inward. location: frontof bldg "south." remedy: make all necessary repair.

    May 25, 1999 · Penalty $180

    Resolve
  • Hazardous

    Failure to maintain defect is: concrete and steel slab at top of court yard had partialy collapsed and remaining section is in danger of forther collapse. slad is approximaldy 10" thick courtyard is approximate

    Apr 8, 1996 · Penalty $1,000

    Resolve
  • Non-hazardous

    3-a-b,6-a,21-c,25a-b,32-a,48-a,49,51.a hart ford loop leaking b-no antisyphon on oil line c-oil return line not piped properly at tank.d-remove flu pipe from 2nd disconected

    Apr 8, 1996 · Penalty $500

    Active
  • Non-hazardous

    Failure to maintain exterior bldg wall.all parapet walls at roof are out of plumb.leaning inward + outward approx 6".remedy:make all necess-ary repairs,obtain all approvals + permits prior to starting,upon comp

    May 5, 1995

    Resolve