roofy

1569 Bruckner Boulevard

Bronx, NY 10472BBL 2-03716-0001Map

Owner of record: Tower Gardens INC

1569 Bruckner Boulevard is an elevator apartment building built in 1962 in Bronx, 10472. It has 104 residential units across 14 floors. The owner of record is Tower Gardens INC. HPD has recorded 56 housing violations here, most recently on April 28, 2026. 17 of the 50 most recent violations are still open.

HPD violations
56
DOB violations
44
ECB violations
24
HPD complaints
114

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 28, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 56

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 13d, 12th story, 2nd apartment from west at north

    Apr 28, 2026 · Apt 13D

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department ceiling in the bathroom located at apt 13d, 12th story, 2nd apartment from west at north

    Apr 28, 2026 · Apt 13D

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 8e, 6th story, 1st apartment from west at north

    Feb 9, 2026 · Apt 8E

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 8e, 6th story, 1st apartment from west at north

    Feb 9, 2026 · Apt 8E

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 9, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 8e, 6th story, 1st apartment from west at north

    Feb 9, 2026 · Apt 8E

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 8e, 6th story, 1st apartment from west at north

    Feb 9, 2026 · Apt 8E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 8e, 6th story, 1st apartment from west at north

    Feb 9, 2026 · Apt 8E

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective [door]north 1 door to roof at bulkhead at public hall, 12th story

    Nov 14, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective [latch] north 1 door to roof at bulkhead at public hall, 12th story

    Nov 14, 2025

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective latch and assemblys at north 1 door to roof at bulkhead at public hall, 12th story

    Nov 14, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and all wall in the bathroom located at apt 14f, 12th story, 2nd apartment from north at east

    Oct 14, 2025 · Apt 14F

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 16, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 5 square feet at south wall in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast

    Oct 1, 2019 · Apt 3G

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 2 square feet at south wall in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast

    Oct 1, 2019 · Apt 3G

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in at sink drain line in the kitchen located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast

    Oct 1, 2019 · Apt 3G

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast

    Oct 1, 2019 · Apt 3G

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 5 square feet at south wall in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast original violation 13314619 issued 01-oct-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 1, 2019 · Apt 3G

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 2 square feet at south wall in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north , section at northeast original violation 13314621 issued 01-oct-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Oct 1, 2019 · Apt 3G

    Closed — Violation dismissed
  • C

    Remove the illegal fastening padlockable slide bolt installed on door in the entrance located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... on south wall approx. 4 sq ft. in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation closed
  • B

    Properly repair the broken or defective inoperative mechanical ventilation in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... on south wall approx. 4 sq ft. in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north original violation 13287626 issued 18-sep-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 18, 2019 · Apt 3G

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the bathroom located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the private hallway located at apt 3g, 3rd story, 2nd apartment from west at north

    Sep 18, 2019 · Apt 3G

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 10, 2018

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 9c, 9th story, 1st apartment from east at south

    Feb 11, 2015 · Apt 9C

    Open — First no access to re- inspect violation
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Nov 7, 2014

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Nov 7, 2014

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at north located at apt 4d, 4th story, 2nd apartment from south at west

    Aug 16, 2012 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ,ceilings and walls in the entire apartment located at apt 14f, 12th story, 2nd apartment from east at south

    Aug 21, 2009 · Apt 14F

    Closed — Violation closed
  • C

    Remove the illegal fastening ,double - cylinder key operating lock installed at entrance door to apt located at apt 14f, 12th story, 2nd apartment from east at south

    Aug 21, 2009 · Apt 14F

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective south wall ceramic tiles in the 4th bathroom from east at south located at apt 7e, 7th story, 1st apartment from west at north

    Sep 7, 2007 · Apt 7E

    Open — First no access to re- inspect violation
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the 4th bathroom from east at south located at apt 7e, 7th story, 1st apartment from west at north

    Sep 7, 2007 · Apt 7E

    Open — First no access to re- inspect violation
  • A

    Replace with new the missing south closet door in the private hallway located at apt 7e, 7th story, 1st apartment from west at north

    Sep 7, 2007 · Apt 7E

    Open — First no access to re- inspect violation
  • A

    Refit closet door in the 1st room from north located at apt 4d, 4th story, 2nd apartment from north at east

    Sep 16, 2006 · Apt 4D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective reglaze porcelain bath tub in the bathroom located at apt 4d, 4th story, 2nd apartment from north at east

    Sep 16, 2006 · Apt 4D

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4d, 4th story, 2nd apartment from north at east

    Sep 16, 2006 · Apt 4D

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 10g, 10th story, 2nd apartment from north at east

    Nov 18, 2004 · Apt 10G

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 10g, 10th story, 2nd apartment from north at east

    Nov 18, 2004 · Apt 10G

    Closed — Violation closed
  • B

    Properly repair the broken or defective intercom of 2nd sty 2nd east at north apt 2e vestibule. located at apt 2e

    Apr 29, 1992 · Apt 2E

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color clgs & walls in 2nd sty 2nd east at north apt 2e all rooms. located at apt 2e

    Apr 29, 1992 · Apt 2E

    Closed — Violation closed
  • A

    Repair the leaky and/or defective faucets sink in 2nd sty 2nd east at north apt 2c kitchen. located at apt 2c

    Apr 29, 1992 · Apt 2C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color wash under sink in 2nd sty 2nd east at north apt 2e kitchen. located at apt 2e

    Apr 29, 1992 · Apt 2E

    Closed — Violation closed

DOB building violations · 44

  • Construction other optional

    Failure to maintain building in a code compliant manner as per section 28.301.1 of the nyc admin code.as noted at time of inspection,observed damaged window pane at exposure two.also large vertical step crack at shed level.remedy:repair and/or replace

    Jul 31, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner:exposure 1 damag joints @ upper flrs 12-14,spalled brick @ hand 14 flrs. exp damaged sealant @ 7fl. exp3 eroded joints @ upper flrs east end.exp4 damaged joints,crack @ 1fl and deflated window lintel. remedy: maintain building and/or replace

    Apr 9, 2025

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.at the time of inspection,observed on exp1 south elev,spalled mortar joints on 12th f loor,spalled bricks on 13th & 14th floor,cracked concrete roof deck so ffit.exp2 west,spalling bricks & mortar joints on 12th fl southwest en d of elev.remedy:repair and/or replace

    Oct 21, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain building in a code compliant manner.at time of ins pection observed at exp1 spalling/missing mortar joints,broken facades brick on multiple levels.at exp2 observed missing,damaged brick and mo rtar joints.at exp3 observed cracked spalling mortar joints on multipl e areas.exp4 observed missing morar joints.remedy:repair or replace

    Jun 21, 2024

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9a unsafe report filed

    Feb 17, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 12, 2019

    Dob violation - resolved
Show 34 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Nov 2, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 3, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 3, 2018

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 27, 2018

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2016

    Feb 16, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 2, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 10, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 21, 2006

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Mar 4, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 24

  • Class - 2

    Failure to file acceptable amended cycle 8a and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #908319. agg1: prior nov 37026184j under

    Apr 20, 2026 · Penalty $10,000

    Active
  • Class - 2

    3307.6.3 area to protect. i observed a 12 story building with sws. i noticed that sws doesn't reach tight to facades large opening areas exposed to public. as per code if deck doesn't reach facades a netting

    May 16, 2025 · Penalty $10,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8a and 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #908319. agg1: prior nov 37022382m under

    Jan 16, 2024 · Penalty $10,000

    Active
  • Class - 2

    Failure to file acceptable amended cycle 8a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#808319. remedy: file acceptable report.

    Oct 8, 2021 · Penalty $1,280

    Active
  • Class - 2

    Failure to maintain building in code compliant manner noted:at time ofinspection observed vertical cracks at side of rear door.rem:maintain building in code compliant manner.

    Aug 6, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    Sidewallk shed parapet panel. note: at the time of inspection obsrved a heavy duty sidewalk shed installed at exp one, two and four of building at 1569 bruckner blvd. pedestrians are walking under the sidewalk

    Jan 8, 2020

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#808319. remedy: submit required technical report

    May 18, 2018

    Resolve
  • Class - 1

    Cease use. 05a10. car door restrictor has been tampered w/ (repair).

    May 16, 2016

    Resolve
  • Class - 1

    05a10. cab door restrictor has been tampered w/ (repair).

    May 16, 2016

    Resolve
  • Class - 1

    05a10 cab doro restrictor is been tampered with (repair)

    May 16, 2016 · Penalty $1,000

    Active
Show 14 more ↓
  • Class - 1

    05a10 cab door restrictor is been tampered with (repair)

    May 16, 2016 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dept of bldgs rules

    Jan 15, 2012 · Penalty $2,000

    Active
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls 7 appurtenances as required by article 28.302 & the dob rules & regulations.remed

    Apr 15, 2011 · Penalty $2,000

    Active
  • Class - 2

    Failure to file an acceptable 6th round technical report in compl w/code provisions:periodic insp of ext walls & appurtenances as required by article 28.302 & dob rules & regulations.36010667l.rem:file the requ

    Jul 12, 2010 · Penalty $2,000

    Active
  • Class - 2

    Fail to file an acceptable sixth round technical report in compliance with code provisions. periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regula

    Jul 9, 2010 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations re

    Nov 27, 2009 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations

    Feb 6, 2009 · Penalty $800

    Active
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy; file an

    Jan 13, 2003 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file amended round five report acceptable to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an am

    Nov 8, 2002 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file and

    Sep 9, 2002 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy: file an

    Jul 12, 2002 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this depa rtment pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy : file

    May 3, 2002 · Penalty $400

    Resolve
  • Non-hazardous

    14b7-25q3-50y14-40#14-40m12-3h10-21i11-9b7-54u16-22#6-57o2. 14-post certificate in car as per rule 27-1004 a or 27-1004 b 40-data plate 3 flooring 9 back one 22 as per code.

    Feb 25, 2002 · Penalty $350

    Resolve
  • Non-hazardous

    14b7-25q3-50y14-40m12-35y0-35o2-21i11-9b7-54u16-22#6-57o2. 40-data perte 14 post certificate in car as per rule 27-1004 a, on 27-1004 b 9-back 22-as per code.

    Feb 25, 2002 · Penalty $350

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 17, 2026 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 27, 2026 · Apt 13D

    Close
  • Paint/plaster

    Ceiling

    Apr 27, 2026 · Apt 13D

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 8E

    Close
  • Safety

    Window guard broken/missing

    Jan 26, 2026 · Apt 8E

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jan 18, 2026 · Apt 6C

    Close
  • Heat/hot water

    Entire building

    Nov 12, 2025 · Apt 14D

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 16, 2025 · Apt 12E

    Close
  • Heat/hot water

    Entire building

    Oct 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Nov 18, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2023 · Apt 8E

    Close
  • Heat/hot water

    Apartment only

    May 5, 2023 · Apt 14G

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2023 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2022 · Apt BLDG

    Close
  • General

    Cooking gas

    Dec 9, 2022 · Apt 5H

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt 13B

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2022 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt 9A

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2022 · Apt 11A

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2022 · Apt APT3G

    Close
  • Water leak

    Damp spot

    Dec 31, 2020 · Apt 3G

    Close
  • Plumbing

    Basin/sink

    Dec 31, 2020 · Apt 3G

    Close
  • Water leak

    Heavy flow

    Dec 31, 2020 · Apt 3G

    Close
  • Plumbing

    Toilet

    Nov 8, 2020 · Apt 7E

    Close
  • Plumbing

    Basin/sink

    Sep 28, 2019 · Apt 3G

    Close
  • Unsanitary condition

    Mold

    Sep 28, 2019 · Apt 3G

    Close
  • Plumbing

    Basin/sink

    Sep 20, 2019 · Apt 3G

    Close
  • Water leak

    Heavy flow

    Sep 20, 2019 · Apt 3G

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1962
Floors
14
Residential units
104
Building area
124,778 ft²
Lot area
26,778 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3716 / 1
Assessed value
$3,868,200
Landmark / historic district
No

HPD registration #221259, last renewed Feb 11, 2026.

Questions about 1569 Bruckner Boulevard

Who owns 1569 Bruckner Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Tower Gardens INC.

Does 1569 Bruckner Boulevard have violations?

Yes. NYC HPD has recorded 56 housing violations at this property.

Is 1569 Bruckner Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1569 Bruckner Boulevard built?

City records list 1962 as the year it was built.

How many apartments are in 1569 Bruckner Boulevard?

It has 104 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.