1499 Bruckner Boulevard is an elevator apartment building built in 2025 in Bronx, 10472. It has 135 residential units across 7 floors. The owner of record is 1499 Bruckner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 10
- ECB violations
- 32
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations · 32
- Class - 2
Observed jersey barriers installed on the roadway not in accordance with manufacturer specifications. the barriers were not interlocking and not all filled with water or sand, and could be easily displaced duri
Jul 6, 2026 · Penalty $1,250
Active - Class - 2
Atoi of a proposed 7-story nb, the job site was non-active with no personnel present. the site exceeded 9,000 sq ft and required a designated watch person. i observed that no watch person was provided maintaine
Jul 6, 2026 · Penalty $2,500
Active - Class - 1
At the time of inspection of inspection, i observed workers preforming interior work sheet rock, electrical wiring and painting operation. upon requesting a designated competent person onsite or construction su
Jun 14, 2026 · Penalty $5,000
Resolve - Class - 1
At the time of inspection of a 7-story new building, active site with interior work upon requesting workers onsite for pre shift meeting, approved dob plan, orientation for workers non was present or provide, c
Jun 14, 2026 · Penalty $1,250
Resolve - Class - 2
At time of inspection of 7-story nb, i observed at exp#1 debris container overfilled with construction debris and building materials above the allowable limit. no cover was provided. failure to cover and secure
Jun 14, 2026 · Penalty $1,250
Resolve - Class - 1
At the time of inspection, at an 7-story nb. plastic jersey barriers placed in the roadway were not in accordance with bc 3301.1.3 barriers were not properly interlock or filled with water or sand, creating an
Jun 14, 2026 · Penalty $1,250
Resolve - Class - 2
At the time of inspection, i observed plastic barriers installed on the roadway not in accordance with manufacturer specifications. the barriers were not interlocking and not filled with water or sand, and coul
Feb 22, 2026 · Penalty $1,250
Resolve - Class - 2
At the time of inspection, i observed unsafe supported scaffolding with inadequate and missing enclosed netting. this condition creates an immediate hazard of flying debris striking the public. maintain in comp
Feb 22, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of inspection of a proposed 7-story new building, i observed no watch person on site or in the area of the premises. the job site exceeded a 9,000 sq. ft. footprint and required a designated watch p
Feb 1, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of inspection of a proposed new building, i observed an advertisement on vertical netting at exposure 1. display of advertising on temporary construction protective structures is prohibited and not
Feb 1, 2026 · Penalty $2,500
Resolve
Show 22 more ↓
- Class - 1
At the time of my inspection of a 7 story new building approximately 9,710 square feet, site was closed and there was no construction activity. upon shouting at perimeter and banging on fence to alert watchpers
Jan 4, 2026 · Penalty $5,000
Resolve - Class - 1
At time of inspection, observed accumulation of ice beneath sidewalk shed creating unsafe walking condition for pedestrians. contrary to bc 3303.4, failure to maintain safe means of pedestrian passage creates a
Jan 4, 2026 · Penalty $2,500
Resolve - Class - 2
At the time of my inspection i observed a 30 yard debris container full to the rim being store on roadway adjacent to sidewalk shed. i also observed that there were no barriers (4 ft and wire mesh) provided or
Jan 4, 2026 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed active construction site. upon reviewing sidewalk shed drawings notice installation does not conform to approved drawings. on side view of wheeler ave. in front of 1021 wheeler av
Nov 19, 2025
Resolve - Class - 2
During my inspection of an active 7-story nb. i observed a concrete pour and sidewalk shed installation operation on the 2nd floor within 10' of exposure 2 adjacent property windows. no window coverage or prote
Sep 29, 2025 · Penalty $2,500
Resolve - Class - 2
During my inspection of an active 7-story nb with an ongoing concrete pour, exposure 1. i observed that permit holders have failed to complete the installation of the overhead protection, sidewalk shed, before
Sep 29, 2025 · Penalty $2,400
Resolve - Class - 2
At the time of my inspection. i observed exposure 3 rear yard, a missing jobsite fence. stop all work under permit #x00955123-s5-st. comply with the code bc 3307.7 and fully enclose the site. contact cse for in
Sep 29, 2025 · Penalty $1,000
Resolve - Class - 2
During my inspection of a closed, padlocked site, nb. i observed exterior roadway and sidewalk obstruction by debris and plastic barriers that were not maintained as per the manuf specification, loose & scatter
Jun 12, 2025 · Penalty $2,500
Resolve - Class - 2
At the of my inspection, i found the gate padlocked with no access to verify full compliance of class 1 violation 39538755x -issued on 4/3/2025, no workers on site. i walked the perimeter but was unable to obs
Jun 12, 2025
Resolve - Class - 2
During my inspection of a new 7-story nb closed site, i found it padlocked with no access to verify the previous class 1 violation 39538760k -issued on 4/3/2025, associated with using the adjacent property to
Jun 12, 2025
Resolve - Class - 2
Active jobsite with construction activities on going. failure to maintain safe site-protruded uncapped rebars, obstruction on street, no adequate safety measures- guardrails & berm at open excavation, no pe dew
Apr 3, 2025
Resolve - Class - 2
Active jobsite with construction activities on going. i observed yoducks places on roadway exposure 1&4 not maintained as per manufacturer specification-not filled, no interlocking pins, signal lighting includi
Apr 3, 2025
Resolve - Class - 1
Active jobsite with construction activities on going. i observed in place at exposure 4 with temporary public walkway in the street obstructed with loose jersey barriers and concrete washout container not prote
Apr 3, 2025
Resolve - Class - 1
Unsafe cons operation. i observed active site conditions with piled dirt & machine equipment close to edge of open excavation with no protection, no caz & material storage zone entire site, street obstruction,
Apr 3, 2025
Resolve - Class - 2
Active jobsite with construction activities on going. i observed use of submersible well pump equipment use in pumping water table from subsurface at site. upon request for site specific plan developed by rdp a
Apr 3, 2025
Resolve - Class - 1
Active jobsite with const. activities on going. i observed in place at exposure 3 with the use of existing occupied structure to support formwork bracing & poured concrete wall. upon request for rdp professiona
Apr 3, 2025
Resolve - Class - 2
Active jobsite with const. activities on going. i observed open excavation of approximately more than 12feet deep with workers performing rebar installation work. no at least one safe means of egress maintained
Apr 3, 2025
Resolve - Class - 2
At the time of my inspection of an active 7-story nb at s o e phase. i observed the job site fence missing at several locations, not an 8' high plywood panel fence as per chapter 33. provide jobsite fence as pe
Nov 4, 2024 · Penalty $1,000
Resolve - Class - 2
During, my inspection of a 7-story nb at s o e phase with ongoing excavation and pile operation. i requested the pre-construction survey of adjacent properties at exposures 2 & 3 and the most recent monitoring
Nov 4, 2024 · Penalty $1,250
Resolve - Class - 2
At the time of inspection i observed that the construction fence panels at exposures 1 & 4 not properly maintained pursuant to subsection according to code 3307.7. panels covered with multiply graffiti, unlawfu
Aug 2, 2024 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit work noted having constructed a wooden structure approx 8x15x8 high at rear south corner remedy remove illegal strcuture
Nov 1, 1998 · Penalty $250
Resolve - Non-hazardous
Work without a permit <noted erected a frame structure used for storage of cars and equipment. size of structure approx 15'x50'x8'high at rear of gas station. remedy: obtain aprovals and permit if feasible or r
Jul 27, 1994 · Penalty $175
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2025
- Floors
- 7
- Residential units
- 135
- Building area
- 68,287 ft²
- Lot area
- 14,252 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 17
- Block / lot
- 3712 / 1
- Assessed value
- $101,250
- Landmark / historic district
- No
Questions about 1499 Bruckner Boulevard
Who owns 1499 Bruckner Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 1499 Bruckner LLC.
Does 1499 Bruckner Boulevard have violations?
NYC HPD has no housing violations on record for this property.
Is 1499 Bruckner Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1499 Bruckner Boulevard built?
City records list 2025 as the year it was built.
How many apartments are in 1499 Bruckner Boulevard?
It has 135 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.