roofy

Violations at 348 Soundview Avenue

Bronx, NY 10473 · BBL 2-03474-0021 · Back to the property

HPD housing violations

The newest 50 of 93 HPD violations. The city keeps the complete history.

  • BHazardous

    Provide adequate lighting at north fire passageway at ceiling

    Jun 7, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department south and east walls at basement at public hall

    Jun 7, 2026

    Open — Nov sent out
  • BHazardous

    Replace with new the missing latch set and assembly at door from street to vestibule , 1st story

    Jun 7, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch at door from street to vestibule , 1st story

    Jun 7, 2026

    Closed — Violation closed
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at north wall, west wall, east wall and south wall at basement story at public hall

    Apr 30, 2026

    Open — Nov sent out
  • BHazardous

    Provide in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance

    Apr 30, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Closed — Violation dismissed
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant material at north wall east wall, south wall and west wall at basement story at public hall

    Apr 30, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door

    Apr 30, 2026

    Closed — Violation dismissed
  • BHazardous

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet at water closet in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Certification postponment denied
  • BHazardous

    Properly repair or replace the broken or defective bell buzzer system from building entrance to south wall panel in the 2nd room from east located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Certification postponment denied
  • BHazardous

    Properly repair or replace the broken or defective spring balance at lower and under sash window at east wall in the 1st room from east at north located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Certification postponment denied
  • BHazardous

    Properly repair or replace the broken or defective spring balance at lower sash and upper sash window at west wall in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Certification postponment denied
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 30, 2026 · Apt B1

    Open — Certification postponment denied
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall east wall and south wall at public hall

    Apr 25, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant material at west wall east wall and south wall at public hall

    Apr 25, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at west wall east wall and south wall at public hall

    Apr 25, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective ceramic wall tile at vestibule north wall at public hall, 1st story

    Apr 25, 2026

    Open — Nov sent out
  • BHazardous

    Provide security in the event of a power outage by means of acceptable mechanical heavy duty lock and latch set at building entrance door at public hall, 1st story

    Apr 25, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening consisting of unacceptable electromagnetic locking device inatalled on building entrance door at public hall, 1st story

    Apr 25, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Provide ready access to buildings heating system locked door at boiler room

    Apr 25, 2026

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 25, 2026 · Apt B1

    Open — Certification postponment denied
  • BHazardous

    Properly repair or replace the broken or defective light switch at east wall in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 25, 2026 · Apt B1

    Open — Certification postponment denied
  • CImmediately hazardous

    Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east

    Apr 25, 2026 · Apt B1

    Closed — Violation dismissed
  • BHazardous

    Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door, , 1st story

    Jan 2, 2026

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove the illegal fastening consisting of an unacceptable 2- motion electromagnatic locking device installed at building entrance door , 1st story

    Jan 2, 2026

    Open — Nov sent out
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • BHazardous

    Provide security in the event of power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door (street to vestibule) at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door (street to vestibule) at public hall, 1st story

    Jan 19, 2025

    Closed — Violation dismissed
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective frame at building entrance door (vestibule to public hall) at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 19, 2025

    Open — Nov sent out
  • ANon-hazardous

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Jan 19, 2025

    Closed — Violation dismissed
  • ANon-hazardous

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Jan 19, 2025

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective defective hinges at vestibule at public hall, 1st story

    Jan 2, 2025

    Open — False certification
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north

    Jan 2, 2025 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from west at north

    Jan 2, 2025 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Properly repair or replace the broken or defective counter spring balance at lower window sash in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from west at north

    Jan 2, 2025 · Apt 1B

    Closed — Violation dismissed
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 1b, 1st story, 1st apartment from west at north

    Jan 2, 2025 · Apt 1B

    Closed — Violation dismissed
  • ANon-hazardous

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 3, 2024

    Closed — Violation dismissed
  • BHazardous

    Provide security in the event of a power outage by means of an acceptable mechical heavy duty lock and latch set at door from street to vestibule at 1st story public hall

    Feb 22, 2024

    Closed — Violation dismissed
  • CImmediately hazardous

    Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at door from street to vestibule at 1st story public hall

    Feb 22, 2024

    Open — Not complied with
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective [hinge] door at vestibule t 1st story public hall

    Feb 22, 2024

    Closed — Violation dismissed
  • BHazardous

    Repair or replace the carbon monoxide detecting device(s). thst is missing at public hall, 1st story

    Feb 17, 2024

    Open — Invalid certification

DOB building violations

21 DOB violations, newest first.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Apr 23, 1993

    Dob violation - dismissed

ECB violations

5 ECB violations, newest first.

  • Class - 2

    Work without permit: noted at apartment b1 erected full height partition and door to sub-divide living room to create a second bedroom., obtain all permits

    May 5, 2026 · Penalty $1,250

    Active
  • Non-hazardous

    Gas being supplied to building without inspection and certification bythis department. con edison found a leak on house pipe for apt 3f(meter #1744801) on 10/02/02 and locked the meter. no permits and inspectio

    Mar 3, 2003

    Resolve
  • Non-hazardous

    Failure to maintain defect is front door is missing entry hardware&door lite (glass). vestibule door is also missing. remedy:install entry hardware&glass at front door&install vestibule door.

    Jul 31, 1991 · Penalty $115

    Resolve
  • Non-hazardous

    Fence exceeds permitted height. illegal fence height 10 feet. permitted height in a residential area is 6 feet. remedy:remove illegal fence.

    Apr 5, 1991

    Resolve
  • Non-hazardous

    Illegal use in a residential districkt illegal use parking and storage in a residential district (r3-2) number of motor vehilcles more than zoning resolution.

    Apr 5, 1991

    Resolve