roofy

Violations at 2865 Kingsbridge Terrace

Bronx, NY 10463 · BBL 2-03256-0156 · Back to the property

HPD housing violations

The newest 50 of 760 HPD violations. The city keeps the complete history.

  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Oct 26, 2026 · Apt 7E

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Oct 26, 2026 · Apt 7E

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Oct 26, 2026 · Apt 7E

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 5k, 5th story, 1st apartment from south at west

    Oct 26, 2026 · Apt 5K

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 1h, 1st story, 2nd apartment from north at east

    Oct 14, 2026 · Apt 1H

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 9k, 9th story, 1st apartment from south at west

    Oct 8, 2026 · Apt 9K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at east located at apt 9k, 9th story, 1st apartment from south at west

    Oct 8, 2026 · Apt 9K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9k, 9th story, 1st apartment from south at west

    Oct 8, 2026 · Apt 9K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 9k, 9th story, 1st apartment from south at west

    Oct 8, 2026 · Apt 9K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 3rd room from north at west located at apt 1k, 1st story, 1st apartment from south at west

    Oct 8, 2026 · Apt 1K

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at north wall in the 3rd room from north at west located at apt 1k, 1st story, 1st apartment from south at west

    Oct 8, 2026 · Apt 1K

    Open — Nov sent out
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 1k, 1st story, 1st apartment from south at west

    Oct 8, 2026 · Apt 1K

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 1k, 1st story, 1st apartment from south at west

    Oct 8, 2026 · Apt 1K

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective entrance door knob to main electric meter room at basement

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective latch set at gas meter room door at basement

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at gas meter room door at basement

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges at public hallway door leading to north yard at basement

    Sep 29, 2026

    Open — Not complied with
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 4th story

    Sep 29, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 4th story

    Sep 29, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 4th story

    Sep 29, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east wall at public hall, 5th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials at east wall at public hall, 5th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective latch set at compactor closet door at public hall, 5th story

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 5th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective latch set at compactor closet door at public hall, 6th story

    Sep 29, 2026

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective latch set at compactor closet door at public hall, 6th story

    Sep 29, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at west wall at public hall, 6th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 6th story

    Sep 29, 2026

    Open — Nov sent out
  • ANon-hazardous

    Paint with light colored paint to the satisfaction of this department at east and west walls at public hall, 7th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardant materials at east and west walls at public hall, 7th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective lighting at fire stairs landing '''' b '''' , 9th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Properly repair or replace the broken or defective lighting fixtures at ceiling [ 2nd light from north ] at fire stairs '''' b '''' bulkhead 9th story

    Sep 29, 2026

    Open — Nov sent out
  • BHazardous

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6m, 6th story, 3rd apartment from south at west

    Sep 29, 2026 · Apt 6M

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective fire retardent material at boiler room ceiling

    Sep 23, 2026

    Open — Nov sent out
  • CImmediately hazardous

    M/d law abate the nuisance consisting of heat on in summer in the entire apartment located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Nov sent out
  • CImmediately hazardous

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7k, 7th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 7K

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 7k, 7th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 7K

    Open — Nov sent out
  • BHazardous

    Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 7k, 7th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 7K

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures adequate volume and pressure in the bathroom located at apt 7k, 7th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 7K

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 7k, 7th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 7K

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Nov sent out
  • BHazardous

    Properly repair the source and abate the evidence of a water leak concealed leak at ceiling in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Nov sent out
  • BHazardous

    Properly repair and abate unsafe electric wiring condition consisting of no power to receptacle attached to light fixture onsouth wall in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Nov sent out
  • CImmediately hazardous

    Abate the infestation consisting of roaches in the entire apartment located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Notice of issuance sent to tenant
  • CImmediately hazardous

    Abate the infestation consisting of mice in the entire apartment located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 22, 2026 · Apt 7E

    Open — Notice of issuance sent to tenant
  • BHazardous

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2f, 2nd story, 3rd apartment from north at east

    Aug 24, 2026 · Apt 2F

    Open — Nov sent out
  • CImmediately hazardous

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 3rd apartment from north at east

    Aug 24, 2026 · Apt 2F

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 3d, 3rd story, 1st apartment from north at east

    Aug 24, 2026 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Provide adequate supply of hot water for the fixtures at wash basin in the 1st bathroom from east located at apt 3d, 3rd story, 1st apartment from north at east

    Aug 24, 2026 · Apt 3D

    Open — Nov sent out
  • BHazardous

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 8f, 8th story, 3rd apartment from north at east

    Aug 24, 2026 · Apt 8F

    Open — Nov sent out

DOB building violations

49 DOB violations, newest first.

  • Construction other optional

    Failure to maintain building in code compliant manner. observed the following conditions: exposure 1, north balcony. crack ceiling crack at 9th floor. also observed spalled brick at 1st floor north of entrance. remedy: repair and/or replace

    Jul 30, 2026

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - active
  • Failure to correct swarmp conditions (facade) facade required

    Cycle 9a failure to correct swarmp conditions

    Feb 21, 2022

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 12, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 12, 2021

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 29, 2020

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)

    Mar 17, 2019

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2016

    Mar 16, 2019

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 13, 2018

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 19, 2016

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 23, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 23, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 23, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 23, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    2p3811

    Dec 23, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p3811

    Mar 14, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p3810

    Mar 14, 2002

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 15, 1995

    Vw-violation work without permit - active
  • Construction other optional

    C-construction other optional

    Feb 15, 1995

    Vp-violation unserved ecb-active
  • Construction other optional

    C-construction other optional

    Feb 15, 1995

    Vp-violation unserved ecb-active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 4, 1989

    Dob violation - resolved
  • Elevator elevatorrequired

    (73)restore elev to service

    Oct 4, 1989

    Dob violation - resolved

ECB violations

29 ECB violations, newest first.

  • Class - 2

    Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #908110. agg1: prior nov 37026538h under 28-302

    Apr 20, 2026 · Penalty $3,125

    Active
  • Class - 1

    Class 1 (cu):failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, door zone restrictor inoperative,repair/replace device and test.repair t

    Nov 18, 2025 · Penalty $1,250

    Active
  • Class - 1

    Cease use federal dual fuel boiler model #flr1822, due to water leaking out of rear of boiler onto electrical boxes for draft control on rear of boiler. do not operate boiler until all hazardous conditions are

    Aug 1, 2025 · Penalty $2,500

    Active
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not received a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    Occupancy contrary to c of o#40325l listing apartments on all floors, does not list shelter homes. apt. 4-c now being used as a shelter for minors, discontinue illegal occupancy or amend c of o; amend c of o.

    May 31, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#908110.rem:file acceptable report.

    Jan 16, 2024 · Penalty $1,250

    Active
  • Class - 2

    At the time of inspection i observed in apartment 1a 1 ungrounded 4 bulb vanity light fixture in the bathroom 1 missing panel box door and no gfci protection in the kitchen the outlet is located 4 feet away fro

    Jun 22, 2023 · Penalty $800

    Active
  • Class - 2

    Occupancy contrary to that allowed by the cert of coocupancy or bldg dept records. at time of inspection. noted: luthern social services of metropolitan new york inc. operating an 11 bed group home out of apts

    Mar 12, 2019

    Resolve
  • Class - 2

    Work w/o a permit. at time of inspection. noted apt#4c&4d & apt#9c&9d were combined to make 1 apt on each floor. also 2 kitchen were removedto make room for 2 offices. no permit on file w/dob. remedy: obtain al

    Mar 12, 2019

    Resolve
  • Class - 2

    Expired permit for temporary construction equipment. - sidewalk shed permit expired 6.11.11 permit #220065408. remedy: comply w/code.

    Jun 28, 2011 · Penalty $400

    Resolve
  • Hazardous

    Failure to maintain sidewalk shed shed has wood and other debris stored on top wood dunage is missing below vertical support remedy: immediately remove debris and maintain sidewalk shed

    Mar 20, 2008 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work w/o a permit. expired sidewalk shed permit. remedy:immediately renew permit.

    Jan 31, 2007 · Penalty $250

    Resolve
  • Hazardous

    Licensed rigger designated and unqualified foreman.

    Jan 30, 2007

    Resolve
  • Hazardous

    Site safety approved plans not available for inspection. did not file for outrigger beam permit(form cd5)

    Jan 30, 2007 · Penalty $500

    Resolve
  • Non-hazardous

    84l10/16b10/55y13/44q3/38o2/39o2/66o2 84 restore to service so a full inspection can be made by this dept. 16 basement door.

    Jun 29, 2005 · Penalty $350

    Resolve
  • Non-hazardous

    73o02/ 50y14/ 16h10/ 05q03/ 52b12/ 50y02. 16=lobby,5,8,9 floors, 05= top of car door operator. 73= m room, car-top, pit, machines, brakes gov. 52=clean oil, replace brake pads.

    May 8, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    43o02/ 50y14/ 39h08/ 46h12/ 52b12/ 52y02/ 16h10. 39=uneven groove wear52=clean oil & replace. 73=pit, cartop, m room, machines. 16=5th & lobby flrs. brake & hoe lining gov. brakes, controller.

    May 8, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to provide 10"x12" elevator landing signs on all floors. failure to provide 3" stair and elevator i.d. signs on all floors. remedy:-provide signage as per local-law 10/84 code

    Jun 28, 2000 · Penalty $5,000

    Resolve
  • Non-hazardous

    Failure to file a report of compliance with local law 16/84, certifying to the installation of required fire protection systems. remedy:file report.

    Jun 28, 2000 · Penalty $400

    Active
  • Non-hazardous

    05j11,09h12,15m07,15l11,16h12,30o02,31q03,73o02,57o02,75u05,.#05j11- too much gap to post #15m7=numbers in hoistway.#15l11=not self closingmain fl. #31q3=car top

    Nov 6, 1998 · Penalty $350

    Resolve
  • Non-hazardous

    09h,05l,04p,15l,15m,16h,21x,22o,27q,30o,37g,39h,55x,57o,50y,75u. door slams on close, not self closing, numbers in hoist way.

    Nov 5, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    73*5-cease use for operating without a permit for equipment use.

    Mar 23, 1998 · Penalty $250

    Resolve
  • Non-hazardous

    39h,39k,46h,46k,.

    Dec 11, 1996 · Penalty $500

    Resolve
  • Non-hazardous

    Work without a permit. work noted: having installed steel support beans in the second and third level of garage. remedy: obtain appro-vals and permit / or restore to prior legal condition.

    Feb 15, 1995

    Resolve
  • Non-hazardous

    Failure to maintain defect is concrete slab espalling and reinforming rods corroded throughout 1 stry. to 3rd story. remedy:replace and repair concrete to safe and lawful condition.

    Sep 8, 1993 · Penalty $1,000

    Resolve
  • Non-hazardous

    14m,46k

    Apr 21, 1993

    Resolve
  • Non-hazardous

    Work without a permit. work noted having installed steel support beams in the second and third level of garage. remedy- obtain approvals & permit or restore to prior legal condition

    Apr 8, 1993 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to maintain. defect is: (1) loose, defective and spalling concrete on all ceilings throughout the garage of all levels. (2) a section aprox 2'*2' concrete collapsed from second level to first level. rem

    Apr 8, 1993 · Penalty $350

    Active
  • Non-hazardous

    73x,74o,57o, #73 restore elev. 2p3810 to service for inspection by this dept. 74-clean car top.

    Feb 19, 1991 · Penalty $75

    Resolve