roofy

2661 Heath Avenue

Bronx, NY 10463BBL 2-03239-0004Map

Owner of record: NYC Housing Authority

2661 Heath Avenue is an elevator apartment building built in 1972 in Bronx, 10463. It has 233 residential units across 20 floors. The owner of record is NYC Housing Authority. HPD has recorded 84 housing violations here, most recently on October 11, 2026. 31 of the 50 most recent violations are still open.

HPD violations
84
DOB violations
26
ECB violations
15
HPD complaints
82

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 84

  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Oct 11, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story

    Oct 11, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east located at apt 16e, 16th story, 1st apartment from west at north

    Oct 11, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Replace with new the missing electrical light fixture at ceiling in the 1st room from east at south located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from east at south located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Replace with new the missing electrical light fixture at ceiling in the 1st room from east at north located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at sink in the kitchen located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective bell and buzzer system from building entrance to intercom panel at west wall in the kitchen located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south and east wall in the closet in the private hallway located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north and south wall in the bathroom located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from east at north located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 16e, 16th story, 1st apartment from west at north

    Sep 16, 2026 · Apt 16E

    Open — Not complied with
  • B

    M/d law abate the nuisance consisting of loose and missing vinyl floor tiles in the 3rd room from east located at apt 16e, 16th story, 1st apartment from west at north

    Jun 17, 2026 · Apt 16E

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of loose and missing vinyl floor tiles in the private hallway located at apt 16e, 16th story, 1st apartment from west at north

    Jun 17, 2026 · Apt 16E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the entire apartment located at apt 16e, 16th story, 1st apartment from west at north

    Jun 17, 2026 · Apt 16E

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 16e, 16th story, 1st apartment from west at north

    Jun 17, 2026 · Apt 16E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 16e, 16th story, 1st apartment from west at north

    Jun 17, 2026 · Apt 16E

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at south wall at public hall, 2nd story

    May 24, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 10k, 10th story, 1st apartment from east at south

    Dec 31, 2025 · Apt 10K

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 31, 2025

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 10k, 10th story, 1st apartment from east at south

    Dec 31, 2025 · Apt 10K

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 10k, 10th story, 1st apartment from east at south

    Dec 31, 2025 · Apt 10K

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at 2nd closet from east at north in the foyer located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west and east wall in the 2nd room from east located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at west closet in the 1st room from east located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the bathroom located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of lockable slide bolt installed at door in the entrance located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less the 10 sq ft at ceiling in the bathroom located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less the 10 sq ft at ceiling in the bathroom located at apt 20h, 20th story, 1st apartment from north at east original violation 18532755 issued 27-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Dec 27, 2025 · Apt 20H

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt 20h, 20th story, 1st apartment from north at east

    Dec 27, 2025 · Apt 20H

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 13a, 13th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 13A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 13a, 13th story, 2nd apartment from east at south

    Dec 6, 2025 · Apt 13A

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective at ceiling at public hall, 2nd story

    Dec 6, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch at vestibule door at public hall

    Oct 5, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall

    Oct 5, 2025

    Closed — Violation closed
  • C

    Provide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the public part of the building and on each floor of such building, where an owner must make a repair that may result in an interruption of essential services such as utilities(heat, hot water, gas, electricity, or elevator) that is expected to continue for more than two hours. sample notice available at www.nyc.gov/hpd or as provided in this notice of violation. no notice at public hall

    Oct 5, 2025

    Open — Nov sent out
  • C

    Provide adequate supply of cold water for the fixtures . in the entire apartment located at apt 7l, 7th story, 1st apartment from south at west

    Oct 5, 2025 · Apt 7L

    Open — Nov sent out
  • C

    Provide adequate supply of hot water for the fixtures . in the entire apartment located at apt 7l, 7th story, 1st apartment from south at west

    Oct 5, 2025 · Apt 7L

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 2nd story

    Jul 17, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 2nd story

    Jul 17, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 2nd story

    Jul 17, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch at fire door leading to staircase b at public hall, 2nd story

    Jul 17, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to staircase b at public hall, 2nd story

    Jul 17, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper chute at public hall, 2nd story

    Jul 17, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to staircase a at public hall, 19th story

    Jul 17, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the kitchen located at apt 19g, 19th story, 2nd apartment from north at east , section at west

    Jul 17, 2025 · Apt 19G

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 19g, 19th story, 2nd apartment from north at east , section at west

    Jul 17, 2025 · Apt 19G

    Open — Notice of issuance sent to tenant

DOB building violations · 26

  • Construction other optional

    Failure to comply w/commissioner's order dob violation required the immediate 100% hands on inspection of all facades by nys reg pro & submit a report to facades via email immediately. as of 6/29/26, no hands on inspection report submitted to facades unit. remedy: comply with dob violation# 042924cll0702sb immediately

    Jun 26, 2026

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain facade and appurtenances.on 4/29/24 a large sectio n of masonry brick between 6th & 7th floors dislodged & fell at the ma in entrance courtyard walkway for reasons yet to be determined at exp1 east elev.remedy:owner is to retain a nys reg professional with qewi c ert & facade experience to inspect 100% hands on to determine complian

    Apr 29, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to facade failure at 6th & 7th floor of exp1 east elev.due to this,owner is to immediately provide a plan with dime nsions noting the areas to be closed off.no work should be near the ar ea of failure.install fence at all impacted areas.install sws at areas confirmed by qewi.retain a nys reg pe to direct and supervise instal

    Apr 29, 2024

    Dob violation - active
  • Construction other optional

    Failure to maintain facade.on 4/29/24 a large section of masonry brick between 6th & 7th floor failed and dislodged onto the main entrance co urtyard walkway at exp1 east elev for reasons yet to be determined.rem edy:immediately retain services of a nys reg design professional with qewi cert and experience in masonry to inspect and provide a report

    Apr 29, 2024

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)

    Aug 21, 2022

    Dob violation - dismissed
  • Hazardous condition (facade) facade required

    Nycha cycle 9a unsafe report filed

    Feb 19, 2022

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2019

    Jun 29, 2020

    Dob violation - dismissed
Show 16 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 25, 2020

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Jan 6, 2020

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator - failure to file category 1 2017 inspection/test

    Apr 5, 2019

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2018

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 1, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 1, 2017

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • Facade facade optional

    Ll11/98-local law 11/98 - facade facade optional

    Jun 6, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 13, 1992

    Vp*-violation unserved ecb- dismissed

ECB violations · 15

  • Class - 2

    Class 2 violation issued for, phase 2, key switch defective, remedy. repair,

    Jul 9, 2025

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. note: on 4/29/24 responded to incident caused by facade failure, observed a large section of masonary blocks fell off facade between a large secti

    Apr 29, 2024 · Penalty $2,500

    Active
  • Class - 1

    I observed approx 464 lf of shed was removed from the buildings perimeter without the departments approval. this removal was done contrary to the ssp-001.00 closeout instructions .the closeout instructions stat

    Oct 24, 2023 · Penalty $625

    Resolve
  • Class - 2

    Found corroded lwco, exposed wires, leaking glass gauge, poor lighting.

    Jul 29, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to promptly notify the dept of an accident or damage to adjoining property @const/demo site.i responded to complaint 2299935 regarding sws parapet fell during high winds.i spoke to the owner of white mi

    Apr 25, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to take required measures to secure public safety-unsafe facade.at time of inspection 20 stories residential building observed unsafe facade report in 20b system and not adequate/missing overhead protec

    Mar 26, 2020 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical/examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#813037.rem:submit required technical report.

    May 18, 2018

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments. approved plan shows one suspended scaffold on south side on site two the same for the west side,east side plan show 2 approved s

    Aug 30, 2012

    Resolve
  • Class - 1

    3314.6.3:lifelines,tiebacks,& suspension ropes shall each be attached to different point of a anchorage. lifeline & tieback tie to same double looped wire rope around bulkhead. rem:comply with code partial stop

    Aug 30, 2012 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Oct 23, 2009

    Resolve
Show 5 more ↓
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report.remedy:file an amended report following remedial repa

    May 28, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial repa

    Dec 5, 2008

    Resolve
  • Hazardous

    Failure to maintain exterior bldg wall as per ll/98 facade inspection one 04/08 exposed corrded steel and exteriorated mortar joints on various exposure thruout and shifted improperly installed deteriorated

    May 16, 2008

    Resolve
  • Hazardous

    Failure to submit a fourth round technical report: periodic inspectionof exterior walls and appurtenances as required by local law 10 of 1980 and the department of buildings rules and regulations. remedy:

    Jun 29, 1998

    Resolve
  • Non-hazardous

    Chimney heights x locations there are 2 temporary trailers stationed at the north area of the front yard thses trailers house the boilers that service the building the metal chimney flue terminates somewhere fr

    Sep 11, 1996

    Resolve

Complaints

  • Water leak

    Heavy flow

    Oct 18, 2026 · Apt 19G

    Open
  • Paint/plaster

    Wall

    Sep 28, 2026 · Apt 5THFLO

    Open
  • Water leak

    Heavy flow

    Sep 6, 2026 · Apt 8K

    Close
  • Unsanitary condition

    Mold

    Sep 2, 2026 · Apt 16E

    Close
  • Paint/plaster

    Wall

    Sep 2, 2026 · Apt 16E

    Close
  • Paint/plaster

    Wall

    Sep 2, 2026 · Apt 16E

    Close
  • Paint/plaster

    Ceiling

    Sep 2, 2026 · Apt 16E

    Close
  • Unsanitary condition

    Pests

    Sep 2, 2026 · Apt 16E

    Close
  • Water leak

    Damp spot

    Sep 2, 2026 · Apt 16E

    Close
  • Heat/hot water

    Entire building

    Jul 16, 2026 · Apt 19J

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Jul 16, 2026 · Apt 19G

    Close
  • Electric

    Power outage

    Jul 5, 2026 · Apt 8K

    Close
  • Plumbing

    Basin/sink

    Jun 9, 2026 · Apt 16E

    Close
  • Unsanitary condition

    Pests

    Jun 9, 2026 · Apt 16E

    Close
  • Paint/plaster

    Wall

    Jun 9, 2026 · Apt 16E

    Close
  • Paint/plaster

    Wall

    Jun 9, 2026 · Apt 16E

    Close
  • Unsanitary condition

    Mold

    Jun 9, 2026 · Apt 16E

    Close
  • Water leak

    Damp spot

    Jun 9, 2026 · Apt 16E

    Close
  • Flooring/stairs

    Floor

    Jun 9, 2026 · Apt 16E

    Close
  • Paint/plaster

    Wall

    Apr 30, 2026 · Apt 19G

    Close
  • Water leak

    Heavy flow

    Apr 30, 2026 · Apt 19G

    Close
  • Plumbing

    Bathtub/shower

    Mar 4, 2026 · Apt 1F

    Close
  • Plumbing

    Toilet

    Mar 4, 2026 · Apt 1F

    Close
  • Electric

    No lighting

    Feb 26, 2026 · Apt 17

    Close
  • Electric

    Power outage

    Feb 26, 2026 · Apt BLDG

    Close
  • General

    Cabinet

    Jan 28, 2026 · Apt 11C

    Close
  • Flooring/stairs

    Floor

    Jan 28, 2026 · Apt 11C

    Close
  • Door/window

    Door

    Jan 28, 2026 · Apt 11C

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2026 · Apt 6F

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2025 · Apt APTK

    Close
  • Water leak

    Slow leak

    Dec 29, 2025 · Apt 4L

    Close
  • General

    Ventilation system

    Dec 29, 2025 · Apt 4L

    Close
  • Plumbing

    Basin/sink

    Dec 29, 2025 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    Dec 29, 2025 · Apt 4L

    Close
  • Paint/plaster

    Wall

    Dec 29, 2025 · Apt 4L

    Close
  • Plumbing

    Bathtub/shower

    Dec 29, 2025 · Apt 4L

    Close
  • Plumbing

    Basin/sink

    Dec 29, 2025 · Apt 4L

    Close
  • Water leak

    Slow leak

    Dec 29, 2025 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Dec 29, 2025 · Apt 10K

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    Dec 29, 2025 · Apt 4L

    Close
  • Unsanitary condition

    Mold

    Dec 29, 2025 · Apt 4F

    Close
  • Water leak

    Slow leak

    Dec 29, 2025 · Apt 4L

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 4L

    Close
  • Plumbing

    Basin/sink

    Dec 29, 2025 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 5H

    Close
  • Water leak

    Slow leak

    Dec 25, 2025 · Apt 20H

    Close
  • Paint/plaster

    Wall

    Dec 25, 2025 · Apt 20H

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D9)
Year built
1972
Floors
20
Residential units
233
Building area
190,000 ft²
Lot area
99,606 ft²
Zoning
R6
Community board
207
Council district
14
Block / lot
3239 / 4
Assessed value
$4,802,400
Landmark / historic district
No

HPD registration #229326, last renewed Jul 29, 2025.

Questions about 2661 Heath Avenue

Who owns 2661 Heath Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.

Does 2661 Heath Avenue have violations?

Yes. NYC HPD has recorded 84 housing violations at this property.

Is 2661 Heath Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2661 Heath Avenue built?

City records list 1972 as the year it was built.

How many apartments are in 2661 Heath Avenue?

It has 233 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.