Violations at 2190 Folin Street

Bronx, NY 10457 · BBL 2-03143-0043 · Back to the property

HPD housing violations

No HPD violations on record

DOB building violations

The newest 50 of 72 DOB violations. The city keeps the complete history.

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2019

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 30, 2018

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2017

    Dob violation - resolved
  • Construction other optional

    For place of assembly contrary to approved construction documents noted at rear auditorium, an electic folding accordion type door was installed, dividing the auditorium in two occupied as (1) music room and (1) computer room

    May 16, 2017

    Vpw-violation unserved ecb-work without permit-active
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 6, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    Nyc department of education

    Jun 9, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    Nyc department of education

    Jun 9, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 19, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 17, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 9, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 9, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 2, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 2, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 15, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 24, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 8, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 2003

    Dob violation - resolved

ECB violations

The newest 50 of 95 ECB violations. The city keeps the complete history.

  • Class - 2

    Failure to maintain building in code-compliant manner. noted: missing door curb on existing paint room at cellar level observed upon inspection. remedy: repair and/or replace.

    Jul 30, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: cracked or missing wire mech vision and stairwell panels at stair c exit 7 missing, cracked roof top garden, cracked cafeteria 4th fl, stair b exit

    Jul 30, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. noted: fire rated classrooms and smoke doors not self-closing due to binding, missingand/or faulty hardware on classrooms, 605, 601, 610, 609, 612 (2)doors

    Jul 30, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: installation of illegal hardware kickstops on classrooms room 610 and classroom 3

    Jul 30, 2026 · Penalty $1,250

    Active
  • Class - 2

    Reissue on ecb #35693314p. failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. noted: emergency illumination discharge exit

    Jul 30, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue on ecb #35725117j. altered/changed building occupied without avalid certificate of occupancy as per #28-118.3.1-#28-118.3.2. noted: change in occupancy use of c of o per 28-118.3.1, 28-118.3.2 by operat

    Jul 30, 2026 · Penalty $3,125

    Active
  • Class - 2

    Reissue: 35663484k date of issue: 09-05-2025. change in occupancy use of c of o per 28-118.3.1 28-118.3.2 by operating place of assembly as per current c of o does not allow such occupancy. at the time of inspe

    Sep 5, 2025 · Penalty $625

    Active
  • Class - 2

    Reissue #35688815r. date of issue # 09-20-2024. exit door not self-closing properly. at the time of inspection observed and noted at 2nd floor, auditorium(main ent inside) two exit doors, 6th floor stairway "a"

    Sep 5, 2025 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue #35688814p date of issue: 09-20-2024. failure to maintain building in code-compliant manner. ilumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. at the time of inspection

    Sep 5, 2025 · Penalty $3,125

    Active
  • Class - 2

    Exit door not self-closing. noted: exit doors closing properly when tested 5th fl lunch room, #5, staircase b total #2, 6th fl staircase a total #4. remedy: repair/replace door.

    Sep 20, 2024 · Penalty $625

    Resolve
  • Class - 2

    Reissued ecb #35663483z. failure to maintain building in code-compliant manner. illumination for exit discharges and public corridors per b.c. 1006.1; 27-381. noted: emergency lghts not working when tested sfl

    Sep 20, 2024 · Penalty $1,562

    Active
  • Class - 1

    Reissued ecb #35663484k. noted: auditorium has been split in half witha floor to ceiling partition wall creating two new, rooms has not been, corrected.

    Sep 20, 2024 · Penalty $6,250

    Active
  • Class - 2

    Reissue 35655112j place of assembly contrary to approved construction at auditorium full height partitions have been erected to subdivide the rear of auditorium and create 2 new rooms. remedy: conform to constr

    Jun 15, 2023 · Penalty $625

    Active
  • Class - 2

    Reissue 35655113l failure to maintain building in code-compliant manner. illumination for exit discharges and public corridors per bc 1006.1; 27-381. existing emg lights at various locations throughout school n

    Jun 15, 2023 · Penalty $1,562

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner.noted:observed at exp#3(folin st)exit for 3rd fir,courtyard has a flag pole which is in state of disrepair due to the asphalt(slab)base sinking into a small

    May 11, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner:illumination forexits,exit discharges & public corridors per bc 1006.1;27-381.noted:observed existing emergency lights at various locations throughout the e

    May 11, 2022 · Penalty $625

    Active
  • Class - 2

    35555816j failure to maintain building in code-compliant manner:no firestopping per bc 712.3;27-345.noted:observed at(cellar)gas meter room,ceiling is missing firestopping/protection at various locations throug

    May 11, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue#35555817l place of assembly contrary to approved construction documents.noted:observed at auditorium,full height partitions have been erected to subdivide the rear of the auditorium and create 2 additio

    May 11, 2022 · Penalty $1,250

    Active
  • Class - 1

    97x17-class i restore to service repair elevator & restore to service immmediately,call nyc dept of buildings elevator division for reinspection.

    Oct 5, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Reissue35473140j:place of assembly contrary to approved const docs noted:@auditorium erected full ht partition wall subdivided auditorium&created 2additional classrms226&227.place of assembly not changed,but no

    May 5, 2021 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain bldg in codecompliant manner no firestopping per bc712.3:27344.noted:@cellar level gas meter rm missing firestopping/protection@ceiling&approx40% metal corrugated ceiling has rusted/rotted.p

    May 5, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Reissue#35267116m:failure to maintain building in code compliant manner manner sec28-118.3.2occupancy contrary to that allowed by the c of o an building dept of records school is occupied as a school but c of o

    May 5, 2020 · Penalty $1,562

    Resolve
  • Class - 2

    Reissue#34620197l place of assembly contrary to approved plans auditorium has been split by full length partitions the public assembly capacity not changed but no new c of on is on file obtain correct c of o

    May 5, 2020 · Penalty $1,250

    Active
  • Class - 2

    Re-issue#35267116m-occupancy contrary to that allowed bt the c of o onbld.dept.records #22619 indicates building is warehouse.now being usedas a school.rem:repair and/or replace.

    May 28, 2019

    Resolve
  • Class - 2

    Re-issue#35326534m-occupancy contrary to that allowed by the c of o onbld.dept.records-building occupied as a school,when c of o#26619 indicates it being a warehouse.rem;discontinue illegal occupancy or amend c

    May 28, 2019

    Resolve
  • Class - 2

    Change in occupancy/use of c of o as per28-118.3.1 & 28-118-32 by operating a place of assembly as per when current c of o does not allow (suut)occupancy-contrary to pa#200547765-81,people permitted-at rear of

    May 28, 2019

    Active
  • Class - 2

    Reissue 35214448l. place of assembly contrary to approved constructiondocuments. noted: at rear auditorium, an electric folding accordion type door was installed dividing the auditorium in two with two stages.

    Apr 10, 2018

    Active
  • Class - 2

    Reissue 35267114z. failure to maintain building in code compliant manner. lack of emergency lighting for exits, exit discharges and public corridors per bc 1006.1; 27-542. noted: at auditorium, gym,cafeteri

    Apr 10, 2018

    Resolve
  • Class - 2

    Reissue 35267116m. occupancy contrary to that allowed by the certificate of occupancy or bldg dept records. noted: building occupied as school contrary to cofo #26619 that indicates the bldg for garage, warehou

    Apr 10, 2018

    Resolve
  • Class - 2

    B254(36):as per class 254-36 boiler not registered as per dob records.

    Sep 18, 2017

    Active
  • Class - 2

    B254(36)as per class 254-36 boiler not registered as per dob records.

    Sep 18, 2017

    Active
  • Class - 2

    B254(36)as per class 254-36 boiler not registered as per dob records.

    Sep 18, 2017

    Active
  • Class - 2

    Failure to maintain bldg walls or appurtenances. noted: at front courtmain entrance broken concrete steps,#2&3 from bottom-up was observed. remedy: maintain exterior bldg wall.

    May 16, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. noted: mmissing fire approved & selg closing door at 5th fl staircase'c',exit'7',at gymnasium right entrance. remedy: repair &/or replace.

    May 16, 2017

    Resolve
  • Class - 2

    Sec. 28-118.3.2 occupancy contrary to that allowed by the c of o or bldg dept records. noted: bldg its being occupied as school w/classroomsgymnasium,cafeteria,auditorium,contrary to c of o#26619 that indicates

    May 16, 2017

    Resolve
  • Class - 2

    Reissued vio#35216350k for: failure to maintain bldg in code compliantmanner: lack of emergency lighting for exits,exit discharges & public corridors per bc712.3;27-345. noted: defective emergency lighting obse

    May 16, 2017

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner. lack of emergency lighting for exits,exit discharges & public corridors per bc 1006.1;27-542. noted: at 5th fl exit 1 stair b emergency light pack is not worki

    Oct 19, 2016

    Resolve
  • Class - 2

    Place of assembly contrary to approved construction documents. reissue vio#34901713j. noted: at rear auditorium,an electric folding accordion type door was installed dividing the auditorium in two,w/2 stages at

    Oct 19, 2016

    Active
  • Class - 2

    Failure to maintain bldg in code-compliant manner. at 5th flr adjacent elevator, door completely missing and frame rackedrmdy: comply w/notice of violation.

    Apr 1, 2015

    Resolve
  • Class - 2

    Reissue #34901713j. place of assembly contrary. pa#200547765 581 people permitted @rear of auditorium 15' side of right approx 75 seats removed. remedy: replace.

    Jul 16, 2014

    Active
  • Class - 2

    Reissue #35019546j. exit door not closing. @4th flr library,stair b 2 & 4 flrs,2nd flr corridor doors adjacent to stair a & gas rm & 6th flr room 601. remedy: repair or replace.

    Jul 16, 2014

    Resolve
  • Class - 2

    Exit 15 from cafeteria door have signs posted reading (no exit) remedy: remove signs. provide required egress.

    May 8, 2013

    Resolve
  • Class - 2

    Storage of gas operated equipment in 1st flr corridors, (snowblowers, plow, lawn mowers etc.), carts boxes garbage cans, construction materials and other combustible items. remedy: remove all obstructions.

    May 8, 2013

    Resolve
  • Class - 2

    Active roof leak at 3rd flr gym at roof drain penetration. bucket collecting storm water at time of insp. remedy: make necessary repairs.

    May 8, 2013

    Resolve
  • Class - 2

    Emergency exit lights at exit 10, 2nd flr & auditorium above main, entrance and on left side not working. remedy: repair/replace lights.

    May 8, 2013

    Resolve
  • Class - 2

    Sec. 27-371(b) plexi vision panels installed on doors to rooms 201,205,217,263b,301,604 & 609. remedy: provide required glass panels.

    May 8, 2013

    Resolve
  • Class - 2

    Doors racked preventing them from properly closing at 4th flr library,stair b 2&4 flrs, 2nd flr corridor doors adjacent to stair a and gas rm. remedy: repair/replace doors.

    May 8, 2013

    Resolve
  • Class - 2

    Combustible materials installed at: (1) 4th story cafeteria black fabric drapes inside open stair vestibule. (fire protective sprinklers that create "water wall" will not protect drapes). at (2) 4th story room

    Jul 12, 2012

    Resolve
  • Class - 2

    Sec. 27-371 doors not closing at 3rd story cross corridor doors near room 316. remedy: repair &/or replace doors noted.

    Jul 12, 2012

    Resolve
  • Class - 2

    Pa plans not provided for inspection: auditorium pa permit #200547765 no approved plans available at the time of inspection. remedy: provideapproved pa plans at site.

    Mar 1, 2011

    Resolve