2131 Mapes Avenue
Bronx, NY 10460BBL 2-03110-0088Map
Owner of record: 2131 Mapes LLC
2131 Mapes Avenue is an elevator apartment building built in 2016 in Bronx, 10460. It has 23 residential units across 7 floors. The owner of record is 2131 Mapes LLC. HPD has recorded 81 housing violations here, most recently on December 17, 2024. 3 of the 50 most recent violations are still open.
- HPD violations
- 81
- DOB violations
- 16
- ECB violations
- 28
- HPD complaints
- 74
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 81
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Dec 17, 2024 · Apt 6A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 11, 2024
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration hopper door at trash chute sealed shut at compactor closet, 3rd story
Apr 3, 2024
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination light fixture at north wall at compactor closet, 3rd story
Apr 3, 2024
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at compactor closet, 3rd story
Apr 3, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Apr 3, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Apr 3, 2024
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Apr 3, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] at door at compactor closet, 3rd story
Mar 16, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 12, 2024
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 12, 2024 · Apt 6A
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 12, 2024 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 12, 2024 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at vestubule door , 1st story
Mar 5, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building vestibule door at 1st story leading to public hall , 1st story
Feb 14, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective locking device at 1st door leading from street (building entrance door) at public hall, 1st story
Jan 3, 2024
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all stories public halls and staircases thruout the building
Jan 3, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from south at west
Dec 13, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from south at west
Dec 13, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective erored wood floor at sink base cabinet in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west
Dec 13, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window in the 1st room from north located at apt 3b, 3rd story, 1st apartment from south at west
Dec 13, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Dec 13, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at public hall, 3rd story
Dec 13, 2023
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Nov 28, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Nov 28, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 28, 2023
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Nov 28, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Nov 24, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Nov 24, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 24, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 7th story
Oct 25, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entry door from street to vestibule located at public parts 7b, 7th story
Oct 25, 2023 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead '' west section'' located at public parts 7b, 7th story
Oct 25, 2023 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Sep 6, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Aug 22, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 13, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 1sq ft at at sink base bottom in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east original violation 16158523 issued 13-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 13, 2023 · Apt 3B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 1sq ft at at sink base bottom in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east
Aug 13, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 13, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Aug 13, 2023
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures located at apt 3b, 3rd story, 1st apartment from north at east
Aug 13, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system . at boiler room
Aug 10, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Aug 10, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Aug 10, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Aug 7, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Aug 7, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7b, 7th story, 1st apartment from north at east
Aug 7, 2023 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 2, 2023 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from north at east
Aug 2, 2023 · Apt 3B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... floor panel at sink base cabinet approx 3 sq. ft in the kitchen located at apt 3b, 3rd story, 1st apartment from north at east original violation 16134887 issued 02-aug-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 2, 2023 · Apt 3B
Closed — Violation closed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 12, 2017
Dob violation - dismissed - Construction other optional
Bro commissioner has issued a stop work order application #220365995 d ue to the withdrawal of the superinted of construction project - stop all work & make site safe provide all required information forthwith
May 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 23, 2011
Dob violation - dismissed
ECB violations · 28
- Class - 2
Perform and file cat 1 year test tag., service motor room fire extinguisher and provide tag.
Nov 1, 2023
Resolve - Class - 2
Perform cat 1 test, test not performed in 2019 or 2020. provide cat 5 tag on governor. brake maintenance tag expired (from 2018).
Jan 4, 2021
Resolve - Class - 1
Electrical work without a permit. basement fire pump installation: 100 amp service switch service entrance/conductor feeder 3 hp panel controls."not on file" "please noted"y185516,y18373.does not cover
Oct 19, 2018 · Penalty $1,630
Resolve - Class - 1
695.6(b)(2)limited service fire pump raceway is not rigid metal-conduit or intermediate metal conduit basement service equipment for file pump.the conduit used is not affected for fire pump installation.(emt)
Oct 19, 2018 · Penalty $1,630
Resolve - Class - 1
250.24 ungrounded system grounding-connections. a premises wiring system that is supplied by on a/e service that is ungrounded shall have, at each service a grounding electode conductor connected to the groundi
Oct 19, 2018 · Penalty $1,630
Resolve - Class - 2
Failure to provide arc-fault circuit interrupter(afci)protection in dwelling units. the entire building (pto )living rooms,bedrooms no (afci)arc-fault circuit interrupter provided. remedy: provide afci
Oct 19, 2018 · Penalty $2,430
Resolve - Class - 2
Inadequate housekeeping. note: at time of inspection of a 7 story new building that is topped out, i observed excessive debris at expo 3-rear of building. debris consists of wood, paper, construction cutoffs an
Feb 12, 2018
Resolve - Class - 2
Temporary construction equipment on site - expired permit. note at time of inspection of a 7 story new building that is topped off and enclosed with windows. i observed a construction fence installed at exposur
Feb 12, 2018
Resolve - Class - 1
3309.1 failure to protect or adequately protect adjacent property.note: 7 story building erected to 2 floor ledel. at expo #2 the adjacent property windows all within 15 feet some less tha 3 feet from nb are
Nov 30, 2017 · Penalty $1,630
Resolve - Class - 2
3301-02 construction superintendent fails to maintain and/or make job site logs available.7 story building erected to roof level workers on site.sebastian p.l monte ii has failed to maintain or verify that sit
Nov 30, 2017 · Penalty $830
Resolve
Show 18 more ↓
- Class - 2
Failure to institute/maintain safety equipment /measures.note: 7 storybuilding erected to roof level.not enclosed.there is no overhead protection in place @ expo #1 and 3 of building causing a hazard on site
Nov 30, 2017 · Penalty $530
Resolve - Class - 1
Construction superintendent failed to perform duties as per rule. note:7story building erected to roof level registered super sebastian monte-stated he is super of site.1)failed to maintain designate competent
Nov 30, 2017 · Penalty $5,000
Resolve - Class - 1
Work without a permit.7 story building erected to roof level.observed at expo #1 supportd scaffold over 40 feet tall.its erected to the 7th floor level.there is no permit on site or no bis.stop all of the exte
Nov 30, 2017
Resolve - Class - 1
801.1.1 responsibility of owner of tall-building:chimney note:7 story building erected to roof level.at expo #2 observed adjacent poperty chimney up against nb.the chimney is below 7 story building not covered
Nov 30, 2017 · Penalty $1,630
Resolve - Class - 1
Failure to institute/maintain safety equipment measure on temporary construction-no guard rails.as noted:@time of insp @ an active const site observed workers on floor #7 working on placing floor board.no guard
Oct 31, 2017 · Penalty $1,200
Resolve - Class - 1
Bc3301.7 failure to provide pe approved design drawings.as noted:@timeof insp @ an active const site observed workers at fl #7 working on placing floor boards @leading edgeof exposure #3 as well near elevator s
Oct 31, 2017 · Penalty $500
Resolve - Class - 1
Bc3308.1.1 failure to provide vertical safety netting requirement.as noted at time of inspection on an active construction site observed 7 stories building.failure to provide vertical safety netting at floor #2
Oct 31, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to maintain:guardrails note:7 story buliding at foundation phase-at expo #1/4 there is no guardrail in place causing a hazard on site:(fall)remedy:provide code required guardrail system.
Jul 11, 2017 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments.note:construction fence plywood metal fence posts no tiebacks.observed: approx. fence design calls for wood fence posts and 45
Jul 11, 2017
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subsection. @ time of insp observed an active construction site @ foundation stage. during insp noted that the construction fence was in place but it was
Apr 13, 2017
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted @ time of insp observed the excavation @ exp#2 created water problems @ the adjacent building boiler room. contractor did n
Apr 13, 2017
Resolve - Class - 2
Failure to provide approved/acceptable plans @ job site @ time of insp. @ time of insp observed an active construction site w/ excavation work in progress. during insp noted that excavation work in progress app
Apr 13, 2017
Resolve - Class - 1
Sec: bc3301.7. failure to provide monitoring reports on site @ time of insp. @ time of insp observed an active construction site w/ excavation work in progress. during insp requested for vibration &/or optical
Apr 13, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to notify the dept prior to the commencement of earth work. @ time of insp observed an active construction site w/ excavation work in progress. during insp noted that the contractor was excavating @ exp
Apr 13, 2017 · Penalty $1,200
Resolve - Class - 2
Failure to submit required report of condition assessment of foundation wall. @ time of insp observed an active construction site w/ excavation work in progress. during insp noted that the contractor excavated
Apr 13, 2017
Resolve - Class - 1
Construction superintendent failed to perform duties per rule.the designated construction superintendent failed to maintain safe job site and assure compliance with chapter 33 of bc.superintendent failed to per
Apr 13, 2017 · Penalty $10,000
Resolve - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob for open ecb nov#34869293p rem: comply w/ the comms order to file a cert of correction
May 24, 2011 · Penalty $800
Resolve - Class - 1
4ailure to maintain bldg in code compliant manner appx 4-5ft of water observed at cellar due to bursted pipe also noted deteriorated flooring system subfloor and finish floor at 1st and 2nd floor lvl cellar str
Dec 20, 2010 · Penalty $1,000
Resolve
Complaints
- Unsanitary condition
Mold
Apr 10, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Apr 10, 2024 · Apt 3B
Close - Water leak
Heavy flow
Apr 10, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Mar 14, 2024 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 10, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Mar 10, 2024 · Apt 7B
Close - Unsanitary condition
Pests
Feb 28, 2024 · Apt 7B
Close - Electric
Power outage
Jan 2, 2024 · Apt 6A
Close - Unsanitary condition
Garbage/recycling storage
Jan 1, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2024 · Apt BLDG
Close
Show 40 more ↓
- Electric
Power outage
Jan 1, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 29, 2023 · Apt 7B
Close - Electric
Power outage
Dec 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 29, 2023 · Apt BLDG
Close - Electric
Power outage
Dec 29, 2023 · Apt 3B
Close - Electric
Power outage
Dec 28, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Nov 28, 2023 · Apt BLDG
Close - Door/window
Window frame
Nov 26, 2023 · Apt 3B
Close - Unsanitary condition
Mold
Nov 26, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt 3B
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 7D
Close - Unsanitary condition
Pests
Nov 14, 2023 · Apt 7B
Close - Heat/hot water
Apartment only
Nov 14, 2023 · Apt 7B
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 7, 2023 · Apt 6A
Close - Heat/hot water
Entire building
Nov 2, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 15, 2023 · Apt 5A
Close - Heat/hot water
Entire building
Aug 12, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Aug 9, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Aug 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 8, 2023 · Apt 2B
Close - Plumbing
Water supply
Aug 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 7, 2023 · Apt 2C
Close - Plumbing
Water supply
Aug 6, 2023 · Apt 3B
Close - Plumbing
Water supply
Aug 4, 2023 · Apt 7B
Close - Plumbing
Water supply
Aug 4, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Aug 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 1, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 1, 2023 · Apt 3B
Close - Water leak
Heavy flow
Jul 1, 2023 · Apt 3B
Close - Heat/hot water
Entire building
May 18, 2023 · Apt 4C
Close - Heat/hot water
Entire building
May 18, 2023 · Apt BLDG
Close - Appliance
Refrigerator
May 18, 2023 · Apt 810B
Close - Heat/hot water
Entire building
May 18, 2023 · Apt 3C
Close - Heat/hot water
Entire building
May 18, 2023 · Apt BLDG
Close - Safety
Fire escape
May 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
May 16, 2023 · Apt 3B
Close - Door/window
Door
May 8, 2023 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2016
- Floors
- 7
- Residential units
- 23
- Building area
- 15,900 ft²
- Lot area
- 4,800 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3110 / 88
- Assessed value
- $749,250
- Landmark / historic district
- No
HPD registration #227944, last renewed Sep 9, 2025.
Questions about 2131 Mapes Avenue
Who owns 2131 Mapes Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2131 Mapes LLC.
Does 2131 Mapes Avenue have violations?
Yes. NYC HPD has recorded 81 housing violations at this property.
Is 2131 Mapes Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2131 Mapes Avenue built?
City records list 2016 as the year it was built.
How many apartments are in 2131 Mapes Avenue?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.