roofy

2010 Mapes Avenue

Bronx, NY 10460BBL 2-03107-0015Map

Owner of record: West Pond I LLC

2010 Mapes Avenue is a walk-up apartment building built in 1910 in Bronx, 10460. It has 3 residential units across 3 floors. The owner of record is West Pond I LLC. HPD has recorded 57 housing violations here, most recently on July 18, 2025. 1 of the 50 most recent violations are still open.

HPD violations
57
DOB violations
1
ECB violations
10
HPD complaints
109

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 18, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 57

  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east original violation 18108796 issued 18-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jul 18, 2025 · Apt 2F

    Open — Defect letter issued
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east

    Jul 18, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Jun 15, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north

    Jun 15, 2025 · Apt 2F

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door at building entrance at public hall, 1st story

    Sep 22, 2023

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story

    Sep 22, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 22, 2023

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Closed — Violation dismissed
  • C

    Provide iron guard rails or parapet walls 3' 6'' high and extending a minimum of 4 ' beyond either side of scuttle opening at roof

    Sep 15, 2010

    Closed — Violation closed
  • B

    Discontinue unlawful use for single room occupancy purposes rooms east 2,east3, e 4and east 5 in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Dec 14, 2009 · Apt 1

    Closed — Violation closed
Show 40 more ↓
  • B

    Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition consisting of sheetrock partition and wood doors erected creating rooms in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Dec 14, 2009 · Apt 1

    Closed — Violation closed
  • I

    The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Nov 12, 2009

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Oct 10, 2009 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Oct 10, 2009 · Apt 2

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the consruction debris at public hall, 2nd story

    Jan 28, 2009

    Closed — Violation closed
  • B

    Replace with new the missing 4 balusters at public hall stairs

    Jan 28, 2009

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Jan 26, 2009 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Jan 26, 2009 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Properly repair the broken or defective holes in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... atceiling and south and east walls in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Dec 17, 2008 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor at public hall, 1st story

    Dec 17, 2008

    Closed — Violation closed
  • C

    Properly repair the broken or defective electrical switch ligth at north wall at public hall, 1st story

    Dec 17, 2008

    Closed — Violation closed
  • B

    Properly repair the broken or defective mail-boxes at public hall, 1st story

    Dec 17, 2008

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from east at south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north

    Dec 12, 2008 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north

    Oct 15, 2008 · Apt 2FL

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of house hold items at all stys. at public hall stairs

    Oct 1, 2008

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story

    Feb 8, 2008 · Apt 3FL

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3fl, 3rd story

    Feb 8, 2008 · Apt 3FL

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall

    Feb 8, 2008

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts required.

    Dec 29, 2007

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st window frame from west at north wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, 2nd door frame from east at south wall, 1st radiator from west at north wall, north wall, 1st window frame from south at west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from east at south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north

    Mar 21, 2006 · Apt 2

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.

    Oct 10, 1990

    Closed — Violation closed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear yard all stacks.

    Oct 10, 1990

    Closed — Violation closed

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 9, 2011

    Dob violation - dismissed

ECB violations · 10

  • Class - 1

    Failure to comply w/the commissioner's order contained in nov #34812095r issued on 1.21.10. noted: at cellar installed plumbing, electrical and partitions erected.no permits. remedy: comply w/the commissioner's

    Aug 25, 2011 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner. noted: respondent tocorrect the conditions cited in prior nov #34812095r at cellar installed plumbing, electrical & partitions. no permits. remedy: comply with

    Jun 17, 2011 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply w/ an order of the comm respondent failed to correctthe conditions cited in nov#34812095r at cellar installed plumbing electric and partitions no permits have been issued to cap & remove illeg

    Apr 13, 2011 · Penalty $24,000

    Resolve
  • Class - 1

    Unlawful acts. failure to comply w/an order of the commissioner. respondnet failed to correct conditions cited on ecb vio #34863155j for work done w/o a permit. installed plumbing & partitions in the cellar no

    Feb 22, 2011 · Penalty $24,000

    Resolve
  • Class - 1

    Unlawful acts failure to comply with an order of the commissioner respondent failed to correct the conditions cited in nov#34863155j & 34812095r.installed plumbing & partitions in cellar no permits have been is

    Dec 8, 2010 · Penalty $24,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner. respondent failed tocorrect the condition(s) cited in the prior nov #34812095r for work w/o a permit - erected partition walls creating 5 rooms w/3 pc bathroom.

    Jun 26, 2010 · Penalty $12,000

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the c of o or dob records. noted3 family dwelling occupied at cellar with 5 sro's. also have 3 pcs bathrooms,kitchen sink & electric stove. remedy: discontinue illegal use

    Jan 21, 2010 · Penalty $12,000

    Resolve
  • Class - 1

    Work w/o a permit. noted : partition walls creating 5 rooms, 3pc bathroom & kitchen w/ sink and electric stove. remedy: obtain permit or restore to prior legal condition

    Jan 21, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Residence altered for more than the legally number of families. noted:on 1st fl partition created for five sro all sharing kitchen and bathroom. remedy: discontinue illegal use

    Feb 25, 2009 · Penalty $6,000

    Resolve
  • Class - 2

    Work without a permit. work noted: on first floor partition created for five sro with 3 piece bathroom and kitchen rem: obtain a permit or restore to prior legal conditions,

    Feb 25, 2009 · Penalty $4,000

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jun 6, 2025 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Jun 6, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 6, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 6, 2025 · Apt 2F

    Close
  • Door/window

    Door

    Jun 6, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 3, 2025 · Apt 2F

    Close
  • Unsanitary condition

    Pests

    Jun 3, 2025 · Apt 2F

    Close
  • General

    Janitor/super

    May 12, 2023 · Apt ENTIRE

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2022 · Apt 1FLOOR

    Close
  • Heat/hot water

    Apartment only

    Jan 7, 2018 · Apt 2F

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 10, 2017 · Apt 1FL

    Close
  • Nonconst

    Vermin

    Jul 1, 2011 · Apt 3FL

    Close
  • Heating

    Heat related

    Feb 22, 2010 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Feb 22, 2010 · Apt 2NDFL

    Close
  • Heating

    Heat related

    Feb 12, 2010 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Feb 1, 2010 · Apt 2

    Close
  • General

    Windows

    Dec 11, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Dec 11, 2009 · Apt 2

    Close
  • Paint/plaster

    Wall

    Oct 7, 2009 · Apt 2

    Close
  • General

    Mold

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Wall

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Oct 7, 2009 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 26, 2009 · Apt 2

    Close
  • Nonconst

    Vermin

    Jan 26, 2009 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jan 26, 2009 · Apt 2

    Close
  • Plumbing

    Water supply

    Jan 26, 2009 · Apt 2

    Close
  • General

    Windows

    Jan 16, 2009 · Apt 2

    Close
  • Plumbing

    Water supply

    Jan 16, 2009 · Apt 2

    Close
  • Heating

    Heat related

    Jan 16, 2009 · Apt 2

    Close
  • Paint/plaster

    Wall

    Jan 7, 2009 · Apt 1

    Close
  • General

    Mold

    Jan 7, 2009 · Apt 1

    Close
  • General

    Ceramic-tile

    Jan 7, 2009 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Jan 7, 2009 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 24, 2008 · Apt 1

    Close
  • General

    Mailbox

    Dec 11, 2008 · Apt 1

    Close
  • General

    Floor

    Dec 11, 2008 · Apt 1

    Close
  • General

    Floor

    Dec 11, 2008 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2008 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2008 · Apt 1

    Close
  • General

    Ceramic-tile

    Dec 11, 2008 · Apt 1

    Close
  • Paint/plaster

    Wall

    Dec 11, 2008 · Apt 1

    Close
  • General

    Mold

    Dec 11, 2008 · Apt 1

    Close
  • Heating

    Heat related

    Dec 11, 2008 · Apt 1

    Close
  • Heating

    Heat related

    Dec 11, 2008 · Apt 1

    Close
  • Nonconst

    Vermin

    Dec 11, 2008 · Apt 1

    Close
  • Nonconst

    Vermin

    Dec 11, 2008 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 11, 2008 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C0)
Year built
1910
Floors
3
Residential units
3
Building area
3,996 ft²
Lot area
2,597 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
3107 / 15
Assessed value
$66,720
Landmark / historic district
No

HPD registration #208707, last renewed Jul 21, 2025.

Questions about 2010 Mapes Avenue

Who owns 2010 Mapes Avenue?

The owner of record in NYC Department of City Planning PLUTO data is West Pond I LLC.

Does 2010 Mapes Avenue have violations?

Yes. NYC HPD has recorded 57 housing violations at this property.

Is 2010 Mapes Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 2010 Mapes Avenue built?

City records list 1910 as the year it was built.

How many apartments are in 2010 Mapes Avenue?

It has 3 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.