2010 Mapes Avenue
Bronx, NY 10460BBL 2-03107-0015Map
Owner of record: West Pond I LLC
2010 Mapes Avenue is a walk-up apartment building built in 1910 in Bronx, 10460. It has 3 residential units across 3 floors. The owner of record is West Pond I LLC. HPD has recorded 57 housing violations here, most recently on July 18, 2025. 1 of the 50 most recent violations are still open.
- HPD violations
- 57
- DOB violations
- 1
- ECB violations
- 10
- HPD complaints
- 109
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east original violation 18108796 issued 18-jul-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jul 18, 2025 · Apt 2F
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Jul 18, 2025 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Jun 15, 2025 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from west at north
Jun 15, 2025 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at building entrance at public hall, 1st story
Sep 22, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Sep 22, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 22, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide iron guard rails or parapet walls 3' 6'' high and extending a minimum of 4 ' beyond either side of scuttle opening at roof
Sep 15, 2010
Closed — Violation closed - BHazardous
Discontinue unlawful use for single room occupancy purposes rooms east 2,east3, e 4and east 5 in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 14, 2009 · Apt 1
Closed — Violation closed
Show 40 more ↓
- BHazardous
Section 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition consisting of sheetrock partition and wood doors erected creating rooms in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 14, 2009 · Apt 1
Closed — Violation closed - IInformation / order
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Nov 12, 2009
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Oct 10, 2009 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Oct 10, 2009 · Apt 2
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the consruction debris at public hall, 2nd story
Jan 28, 2009
Closed — Violation closed - BHazardous
Replace with new the missing 4 balusters at public hall stairs
Jan 28, 2009
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) ceiling in the 3rd room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 26, 2009 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Jan 26, 2009 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the bathroom , the kitchen located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the broken or defective holes in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... atceiling and south and east walls in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Dec 17, 2008 · Apt 1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at public hall, 1st story
Dec 17, 2008
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective electrical switch ligth at north wall at public hall, 1st story
Dec 17, 2008
Closed — Violation closed - BHazardous
Properly repair the broken or defective mail-boxes at public hall, 1st story
Dec 17, 2008
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from east at south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Dec 12, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2fl, 2nd story, 1st apartment from west at north
Oct 15, 2008 · Apt 2FL
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items at all stys. at public hall stairs
Oct 1, 2008
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3fl, 3rd story
Feb 8, 2008 · Apt 3FL
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3fl, 3rd story
Feb 8, 2008 · Apt 3FL
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall
Feb 8, 2008
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts required.
Dec 29, 2007
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall in the 3rd room from east located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall, 1st window frame from west at north wall in the 4th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at east wall, 2nd door frame from east at south wall, 1st radiator from west at north wall, north wall, 1st window frame from south at west wall in the 5th room from east at north located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the 5th room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st window frame from east at south wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Mar 21, 2006 · Apt 2
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard.
Oct 10, 1990
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint rear yard all stacks.
Oct 10, 1990
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 9, 2011
Dob violation - dismissed
ECB violations · 10
- Class - 1
Failure to comply w/the commissioner's order contained in nov #34812095r issued on 1.21.10. noted: at cellar installed plumbing, electrical and partitions erected.no permits. remedy: comply w/the commissioner's
Aug 25, 2011 · Penalty $12,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. noted: respondent tocorrect the conditions cited in prior nov #34812095r at cellar installed plumbing, electrical & partitions. no permits. remedy: comply with
Jun 17, 2011 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/ an order of the comm respondent failed to correctthe conditions cited in nov#34812095r at cellar installed plumbing electric and partitions no permits have been issued to cap & remove illeg
Apr 13, 2011 · Penalty $24,000
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. respondnet failed to correct conditions cited on ecb vio #34863155j for work done w/o a permit. installed plumbing & partitions in the cellar no
Feb 22, 2011 · Penalty $24,000
Resolve - Class - 1
Unlawful acts failure to comply with an order of the commissioner respondent failed to correct the conditions cited in nov#34863155j & 34812095r.installed plumbing & partitions in cellar no permits have been is
Dec 8, 2010 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/an order of the commissioner. respondent failed tocorrect the condition(s) cited in the prior nov #34812095r for work w/o a permit - erected partition walls creating 5 rooms w/3 pc bathroom.
Jun 26, 2010 · Penalty $12,000
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or dob records. noted3 family dwelling occupied at cellar with 5 sro's. also have 3 pcs bathrooms,kitchen sink & electric stove. remedy: discontinue illegal use
Jan 21, 2010 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit. noted : partition walls creating 5 rooms, 3pc bathroom & kitchen w/ sink and electric stove. remedy: obtain permit or restore to prior legal condition
Jan 21, 2010 · Penalty $8,000
Resolve - Class - 2
Residence altered for more than the legally number of families. noted:on 1st fl partition created for five sro all sharing kitchen and bathroom. remedy: discontinue illegal use
Feb 25, 2009 · Penalty $6,000
Resolve - Class - 2
Work without a permit. work noted: on first floor partition created for five sro with 3 piece bathroom and kitchen rem: obtain a permit or restore to prior legal conditions,
Feb 25, 2009 · Penalty $4,000
Resolve
Complaints
- Unsanitary condition
Pests
Jun 6, 2025 · Apt 2F
Close - Paint/plaster
Wall
Jun 6, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Jun 6, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Jun 6, 2025 · Apt 2F
Close - Door/window
Door
Jun 6, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Jun 3, 2025 · Apt 2F
Close - Unsanitary condition
Pests
Jun 3, 2025 · Apt 2F
Close - General
Janitor/super
May 12, 2023 · Apt ENTIRE
Close - Heat/hot water
Apartment only
Jan 29, 2022 · Apt 1FLOOR
Close - Heat/hot water
Apartment only
Jan 7, 2018 · Apt 2F
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 10, 2017 · Apt 1FL
Close - Nonconst
Vermin
Jul 1, 2011 · Apt 3FL
Close - Heating
Heat related
Feb 22, 2010 · Apt 2NDFL
Close - Heating
Heat related
Feb 22, 2010 · Apt 2NDFL
Close - Heating
Heat related
Feb 12, 2010 · Apt 2
Close - Plumbing
Basin/sink
Feb 1, 2010 · Apt 2
Close - General
Windows
Dec 11, 2009 · Apt 2
Close - Heating
Heat related
Dec 11, 2009 · Apt 2
Close - Paint/plaster
Wall
Oct 7, 2009 · Apt 2
Close - General
Mold
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Wall
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Oct 7, 2009 · Apt 2
Close - Paint/plaster
Wall
Jan 26, 2009 · Apt 2
Close - Nonconst
Vermin
Jan 26, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Jan 26, 2009 · Apt 2
Close - Plumbing
Water supply
Jan 26, 2009 · Apt 2
Close - General
Windows
Jan 16, 2009 · Apt 2
Close - Plumbing
Water supply
Jan 16, 2009 · Apt 2
Close - Heating
Heat related
Jan 16, 2009 · Apt 2
Close - Paint/plaster
Wall
Jan 7, 2009 · Apt 1
Close - General
Mold
Jan 7, 2009 · Apt 1
Close - General
Ceramic-tile
Jan 7, 2009 · Apt 1
Close - Plumbing
Water-leaks
Jan 7, 2009 · Apt 1
Close - Paint/plaster
Ceiling
Dec 24, 2008 · Apt 1
Close - General
Mailbox
Dec 11, 2008 · Apt 1
Close - General
Floor
Dec 11, 2008 · Apt 1
Close - General
Floor
Dec 11, 2008 · Apt 1
Close - Paint/plaster
Ceiling
Dec 11, 2008 · Apt 1
Close - Paint/plaster
Ceiling
Dec 11, 2008 · Apt 1
Close - General
Ceramic-tile
Dec 11, 2008 · Apt 1
Close - Paint/plaster
Wall
Dec 11, 2008 · Apt 1
Close - General
Mold
Dec 11, 2008 · Apt 1
Close - Heating
Heat related
Dec 11, 2008 · Apt 1
Close - Heating
Heat related
Dec 11, 2008 · Apt 1
Close - Nonconst
Vermin
Dec 11, 2008 · Apt 1
Close - Nonconst
Vermin
Dec 11, 2008 · Apt 1
Close - Paint/plaster
Ceiling
Dec 11, 2008 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1910
- Floors
- 3
- Residential units
- 3
- Building area
- 3,996 ft²
- Lot area
- 2,597 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3107 / 15
- Assessed value
- $66,720
- Landmark / historic district
- No
HPD registration #208707, last renewed Jul 21, 2025.
Questions about 2010 Mapes Avenue
Who owns 2010 Mapes Avenue?
The owner of record in NYC Department of City Planning PLUTO data is West Pond I LLC.
Does 2010 Mapes Avenue have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 2010 Mapes Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2010 Mapes Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 2010 Mapes Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.