810 East 178 Street
Bronx, NY 10460BBL 2-03107-0006Map
Owner of record: 810 East 178th Street HDFC
810 East 178 Street is a walk-up apartment building built in 1911 in Bronx, 10460. It has 20 residential units across 5 floors. The owner of record is 810 East 178th Street HDFC. HPD has recorded 76 housing violations here, most recently on April 30, 2026. 21 of the 50 most recent violations are still open.
- HPD violations
- 76
- DOB violations
- 6
- ECB violations
- 1
- HPD complaints
- 8
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 76
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the allowed maximum temperature of 130 degrees in the entire apartment located at apt 4c, 5th story, 1st apartment from west at north
Jan 23, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 4c, 5th story, 1st apartment from west at north
Jan 23, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch installed at bldg entrance door at public hall, 1st story
Oct 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of key operated lockset at door leading to rear yard at public hall, 1st story
Oct 2, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening consisting of slide bolt capable of being locked at roof bulkhead door
Oct 2, 2025
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt b, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt B
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at street entrance door to building , 1st story
Jan 22, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt B
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt b, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt b, 1st story, 1st apartment from north at east
Jan 22, 2024 · Apt B
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at vestibule door , 1st story
Jan 22, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling in the 2nd room from east at north located at apt b, 1st story, 1st apartment from north at east
Dec 16, 2021 · Apt B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby, 1st story
Sep 17, 2018
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors ... in the entire apartment located at apt 2b, 3rd story, 2nd apartment from west at north
Jun 27, 2018 · Apt 2B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 3c, 4th story, 1st apartment from west at north
Jun 27, 2018 · Apt 3C
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 4a, 5th story, 1st apartment from north at east
Jun 27, 2018 · Apt 4A
Open — Nov sent out - BHazardous
Replace with new the missing mortise lock at building entrance , 1st story
Jun 20, 2018
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors at bulkhead to the roof
Aug 2, 2017
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall in the bathroom located at apt 1d, 2nd story, 1st apartment from south at west
Oct 16, 2014 · Apt 1D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 1d, 2nd story, 1st apartment from south at west
Oct 16, 2014 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt a, 1st story, 2nd apartment from north at east
Oct 11, 2014 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1d, 2nd story, 1st apartment from south at west
Oct 11, 2014 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2a, 3rd story, 1st apartment from north at east
Oct 11, 2014 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 3rd room from north at east located at apt 2a, 3rd story, 1st apartment from north at east
Oct 11, 2014 · Apt 2A
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening consisting of padlockable sliding bolt lock installed at door interior in the entrance located at apt 2a, 3rd story, 1st apartment from north at east
Oct 11, 2014 · Apt 2A
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north
Oct 4, 2014 · Apt 3C
Open — Invalid certification - ANon-hazardous
Properly repair the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from west at north
Oct 4, 2014 · Apt 3C
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from north at west, the 3rd room from north at east, the kitchen , the foyer , the private hallway , the 2nd room from north at west located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Remove the illegal fastening slide bolt at door in the entrance located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Properly repair the broken or defective the lower window sash spring balances in the 3rd room from north at east located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Open — First no access to re- inspect violation - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 3rd room from north at west located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors .... in the entrance located at apt 1d, 2nd story, 1st apartment from south at west
Sep 16, 2008 · Apt 1D
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from west at north wall ceiling, 1st door from north at east wall in the 2nd room from north at west located at apt d, 1st story, 1st apartment from south at west
Sep 8, 2008 · Apt D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2a, 3rd story, 1st apartment from north at east
Sep 8, 2008 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 2a, 3rd story, 1st apartment from north at east
Sep 8, 2008 · Apt 2A
Open — First no access to re- inspect violation - CImmediately hazardous
Remove the illegal fastening slide bolt lock installed at door in the entrance located at apt 1d, 2nd story, 1st apartment from south at west
Sep 8, 2008 · Apt 1D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall in the 1st room from north at east located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall, 1st window frame from west at north wall in the 1st room from north located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the 1st room from north at west located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 1st room from north at west located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from east at south wall in the foyer located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department .the 1st door frame from north at east wall, 1st door from north at east wall in the 2nd room from north located at apt 3c, 4th story, 1st apartment from west at north
Jul 1, 2005 · Apt 3C
Open — Not complied with
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
34a. boiler room must ofpen towards egress - section 4-6.8, part 4 of title 12 of the official compilation of codes, rules and regulations of the state of newyork.
Jul 12, 2002
Resolve
Complaints
- Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 1FL
Close - Door/window
Door
Jun 19, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 13, 2016 · Apt 1
Close - Heating
Heat related
Jan 10, 2012 · Apt 3C
Close - Paint/plaster
Wall
Feb 26, 2008 · Apt 3C
Close - Paint/plaster
Ceiling
Feb 26, 2008 · Apt 3C
Close - Paint/plaster
Door/frame
Feb 26, 2008 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1911
- Floors
- 5
- Residential units
- 20
- Building area
- 18,450 ft²
- Lot area
- 5,529 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3107 / 6
- Assessed value
- $384,300
- Landmark / historic district
- No
HPD registration #204538, last renewed Oct 17, 2025.
Questions about 810 East 178 Street
Who owns 810 East 178 Street?
The owner of record in NYC Department of City Planning PLUTO data is 810 East 178th Street HDFC.
Does 810 East 178 Street have violations?
Yes. NYC HPD has recorded 76 housing violations at this property.
Is 810 East 178 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 810 East 178 Street built?
City records list 1911 as the year it was built.
How many apartments are in 810 East 178 Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.