roofy

1974 Lafontaine Avenue

Bronx, NY 10457BBL 2-03068-0006Map

Owner of record: 1974-76 Lafontaine Av Terrace Corp

1974 Lafontaine Avenue is a walk-up apartment building built in 1925 in Bronx, 10457. It has 49 residential units across 6 floors. The owner of record is 1974-76 Lafontaine Av Terrace Corp. HPD has recorded 52 housing violations here, most recently on August 16, 2025. 24 of the 50 most recent violations are still open.

HPD violations
52
DOB violations
8
ECB violations
2
HPD complaints
122

Available now in this building

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 16, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • B

    Remove all encumbrances consisting of air conditioner at public hall, 2nd story, section ''1974''

    Aug 16, 2025

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at fire escape, north exterior wall at 3rd story balcony at fire escape

    Aug 16, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings at public hall at 2nd story at section 1974

    Aug 16, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 2nd story, section ''1974''

    Aug 16, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 2nd story, section ''1974''

    Aug 16, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 2nd story, section ''1974''

    Aug 16, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 2nd story, section ''1974''

    Aug 16, 2025

    Open — Nov sent out
  • B

    Provide adequate supply of cold water for the fixtures low pressure at wash basin in the bathroom located at apt 4d, 4th story, 1st apartment from south at west

    Aug 13, 2025 · Apt 4D

    Open — Nov sent out
  • B

    Provide adequate supply of hot water for the fixtures low pressure at wash basin in the bathroom located at apt 4d, 4th story, 1st apartment from south at west

    Aug 13, 2025 · Apt 4D

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes plant pots at 3rd story balcony at 1st from east at north at fire escape

    Aug 1, 2025

    Open — Nov sent out
Show 40 more ↓
  • B

    Remove all encumbrances consisting of air conditioner units at public hall, 1st story

    Aug 1, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 1, 2025

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing at public hall, 1st story

    Aug 1, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Aug 1, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Aug 1, 2025

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 6th story balcony at 1st from east at north at fire escape

    Aug 1, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 1, 2025

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective apartment door in the entrance located at apt 1d, 2nd story, 1st apartment from south at west

    Oct 24, 2023 · Apt 1D

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at lobby, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 31, 2016

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 5, 2015

    Closed — Violation dismissed
  • B

    Properly secure the loose faucet at sink in the kitchen located at apt 1972, 1st story, 2nd apartment from north at east , section ''1074'', at south

    Feb 25, 2008 · Apt 1972

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor at sink in the kitchen located at apt 1972, 1st story, 2nd apartment from north at east , section ''1074'', at south

    Feb 25, 2008 · Apt 1972

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st radiator from west at north wall, 1st window frame from south at west wall in the 1st room from east at south located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Dec 28, 2004 · Apt 1FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Dec 28, 2004 · Apt 1FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall, south wall, east wall, west wall in the 3rd room from east located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Dec 28, 2004 · Apt 1FL

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Dec 28, 2004 · Apt 1FL

    Open — Defect letter issued
  • B

    M/d law abate the nuisance consisting of exposed electrical wiring at ceiling light fixture in the private hallway from east located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Aug 23, 2004 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 1fl, 1st story, 1st apartment from east at south , section ''street'', at

    Aug 23, 2004 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor covering in the kitchen located at apt 1fl, 1st story, apartment at east

    Jan 12, 2004 · Apt 1FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1fl, 1st story, apartment at east

    Jan 12, 2004 · Apt 1FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 1, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt 1

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceilings walls doors and trims in the entire apartment located at apt 1, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt 1

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, south wall, north wall, west wall, east wall in the 2nd room from east located at apt wlk/n, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt WLK/N

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling, south wall in the private hallway located at apt wlk/n, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt WLK/N

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is on a deteriorated subsurface that is unstable or unsound using exclusive interim controls. ceiling in the bathroom located at apt wlk/n, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt WLK/N

    Open — Defect letter issued
  • B

    Properly repair with similar material the broken or defective wood floors in the entire apartment located at apt 1, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt 1

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, apartment at east , section ''walkin''

    Nov 5, 2003 · Apt 1

    Closed — Violation closed
  • B

    Replace with new the broken or defective window glass at fire escape, bottom sash in the 3rd room from east at north located at apt 1d, 2nd story, apartment at west

    Apr 15, 2002 · Apt 1D

    Closed — Violation closed
  • A

    Refit door in the bathroom located at apt 1d, 2nd story, apartment at west

    Apr 15, 2002 · Apt 1D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and walls in the bathroom located at apt 1d, 2nd story, apartment at west

    Apr 15, 2002 · Apt 1D

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at tub in the bathroom located at apt 1d, 2nd story, apartment at west

    Apr 15, 2002 · Apt 1D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 1d, 2nd story, apartment at west

    Apr 15, 2002 · Apt 1D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 1c, 1st story, 1st apartment from south at west

    May 30, 2000 · Apt 1C

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1c, 1st story, 1st apartment from south at west

    May 30, 2000 · Apt 1C

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls , ceiling and trim through out in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west

    May 30, 2000 · Apt 1C

    Closed — Violation closed
  • B

    Replace with new the missing marble saddle at entrance in the bathroom located at apt 1c, 1st story, 1st apartment from south at west

    May 30, 2000 · Apt 1C

    Closed — Violation closed
  • B

    D26-10.01 adm code & 309 m/d law abate the nuisance consisting of iron fence erected at front entrance of bldg approximately ten feet high contrary to sec c26 717 1.

    Sep 11, 1985

    Closed — Violation dismissed
  • A

    D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.

    Jan 20, 1982

    Closed — Violation closed

DOB building violations · 8

  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2020

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed

ECB violations · 2

  • Hazardous

    Failure to provide adequate protection for sidewalks & walkways duringconst. operation. brick chipping being dome for pointing on six (6) story structure w inadequate protection for sidewalk, walkways & public.

    Aug 19, 2006 · Penalty $2,000

    Resolve
  • Hazardous

    Wk w/o a permit. haz. wk noted: windows lentals removed from various windows thruout premises w/o 1st obtaining wk permit. # wk being done in a haz manner in that following masonary brick are on open sidewalk.

    Aug 19, 2006 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2026 · Apt 3C

    Close
  • Plumbing

    Water supply

    Aug 31, 2025 · Apt 3C

    Close
  • Plumbing

    Water supply

    Aug 15, 2025 · Apt 2E

    Close
  • Plumbing

    Water supply

    Aug 10, 2025 · Apt 1B

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 3C

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 4D

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 1D

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 4B

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 1E

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt 2E

    Close
  • Plumbing

    Water supply

    Aug 9, 2025 · Apt BLDG

    Close
  • Safety

    Fire escape

    Mar 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2022 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 17, 2022 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Mar 10, 2021 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2020 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2020 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jun 26, 2020 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    May 17, 2018 · Apt 1D

    Close
  • Heating

    Heat related

    Jan 7, 2014 · Apt 1A

    Close
  • Heating

    Heat related

    Jan 10, 2013 · Apt 5D

    Close
  • Heating

    Heat related

    Oct 1, 2012 · Apt 2B

    Close
  • Heating

    Heat related

    Jun 27, 2011 · Apt BSMNT

    Close
  • Heating

    Heat related

    Feb 9, 2009 · Apt BASE

    Close
  • Plumbing

    Basin/sink

    Dec 30, 2008 · Apt 1972

    Close
  • General

    Floor

    Dec 30, 2008 · Apt 1972

    Close
  • Heating

    Heat related

    Dec 18, 2008 · Apt BASEM

    Close
  • Paint/plaster

    Ceiling

    Oct 25, 2008 · Apt A

    Open
  • Plumbing

    Water-leaks

    Oct 8, 2008 · Apt GRD

    Close
  • Paint/plaster

    Wall

    Oct 8, 2008 · Apt GRD

    Close
  • General

    Doors

    Oct 5, 2008 · Apt 4B

    Close
  • Electric

    Wiring

    Oct 5, 2008 · Apt 4B

    Close
  • Electric

    Wiring

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Cabinet

    Oct 5, 2008 · Apt 4B

    Close
  • Electric

    Electric-supply

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Floor

    Oct 5, 2008 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Floor

    Oct 5, 2008 · Apt 4B

    Close
  • Nonconst

    Vermin

    Oct 5, 2008 · Apt 4B

    Close
  • Nonconst

    Vermin

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Doors

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Doors

    Oct 5, 2008 · Apt 4B

    Close
  • General

    Doors

    Oct 5, 2008 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Oct 5, 2008 · Apt 4B

    Close
  • Plumbing

    Toilet

    Oct 5, 2008 · Apt 4B

    Close
  • Plumbing

    Bathtub/shower

    Oct 5, 2008 · Apt 4B

    Close

Sales history

DatePriceTypeUnits
Aug 7, 2026$110,000Coops - walkup apartments—
Apr 1, 2026$125,000Coops - walkup apartments—

Building details

Building type
Walk-up apartment building (C6)
Year built
1925
Floors
6
Residential units
49
Building area
46,800 ft²
Lot area
10,000 ft²
Zoning
C4-5X
Community board
206
Council district
15
Block / lot
3068 / 6
Assessed value
$1,773,900
Landmark / historic district
No

HPD registration #202309, last renewed Jun 23, 2026.

Questions about 1974 Lafontaine Avenue

Who owns 1974 Lafontaine Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1974-76 Lafontaine Av Terrace Corp.

Does 1974 Lafontaine Avenue have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 1974 Lafontaine Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1974 Lafontaine Avenue built?

City records list 1925 as the year it was built.

How many apartments are in 1974 Lafontaine Avenue?

It has 49 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.