2265 Bathgate Avenue
Bronx, NY 10457BBL 2-03050-0076Map
Owner of record: Bridge House 11 Corporation
2265 Bathgate Avenue is an elevator apartment building built in 2012 in Bronx, 10457. It has 17 residential units across 6 floors. The owner of record is Bridge House 11 Corporation. HPD has recorded 46 housing violations here, most recently on December 12, 2025. 5 of the 46 most recent violations are still open.
- HPD violations
- 46
- DOB violations
- 2
- ECB violations
- 2
- HPD complaints
- 141
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 46
- BHazardous
Properly repair or replace the broken or defective latch set and assembly at public hall, 1st story
Dec 12, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective machnical over flow at bathtub in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch to vestibule door at public hall, 1st story
Dec 12, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door. , 1st story
Sep 10, 2025
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin. in the bathroom located at apt 3c, 3rd story, 1st apartment from south at west
Sep 10, 2025 · Apt 3C
Closed — Violation dismissed
Show 36 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling. in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from south at west
Sep 10, 2025 · Apt 3C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls & ceiling. in the kitchen located at apt 3c, 3rd story, 1st apartment from south at west
Sep 10, 2025 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door. , 1st story
Sep 10, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at building entrance door. , 1st story
Sep 10, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch at vestibule door. , 1st story
Sep 10, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling. in the bathroom located at apt 3c, 3rd story, 1st apartment from south at west
Sep 10, 2025 · Apt 3C
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of excessive heat in the entire apartment, heater on in not heat season in the bathroom located at apt 5c, 5th story, 1st apartment from east at south
Jun 9, 2025 · Apt 5C
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from east at south
Jun 9, 2025 · Apt 5C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 3rd room from east located at apt 3c, 3rd story, 1st apartment from west at north
Jul 17, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell and buzzer return from building entrance to panel on east wall in the 3rd room from east located at apt 3c, 3rd story, 1st apartment from west at north
Jul 17, 2024 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Sep 28, 2022 · Apt 2C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Sep 28, 2022 · Apt 2C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east located at apt 2a, 2nd story, 1st apartment from south at west
Jul 13, 2022 · Apt 2A
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective inoperative intercom sytem from 1st story public hall to the panel in the foyer located at apt 2a, 2nd story, 1st apartment from south at west
Jul 13, 2022 · Apt 2A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx. 5 sq. ft. on the window stool at west wall in the 2nd room from north located at apt 6c, 6th story, 1st apartment from south at west
Sep 14, 2021 · Apt 6C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood window stool at west wall in the 2nd room from north located at apt 6c, 6th story, 1st apartment from south at west
Sep 14, 2021 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window frame at west wall in the 2nd room from north located at apt 6c, 6th story, 1st apartment from south at west
Sep 14, 2021 · Apt 6C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approx. 5 sq. ft. on the window stool at west wall in the 2nd room from north located at apt 6c, 6th story, 1st apartment from south at west original violation 14550120 issued 14-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 14, 2021 · Apt 6C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and all walls in the entire apartment located at apt 6c, 6th story, 1st apartment from south at west
Aug 11, 2021 · Apt 6C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden window stool at west wall in the 3rd room from north located at apt 6c, 6th story, 1st apartment from south at west
Aug 11, 2021 · Apt 6C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from south at west , 1st section from south at west
Aug 3, 2021 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mortise lock at door in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
Apr 15, 2021 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
May 26, 2020 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the kitchen located at apt 6c, 6th story, 1st apartment from south at west
Feb 27, 2020 · Apt 6C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6e, 6th story, 5th apartment from west at north
Feb 14, 2020 · Apt 6E
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6e, 6th story, 5th apartment from west at north
Feb 14, 2020 · Apt 6E
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 20, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Jun 26, 2018 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective mechanical air ventilation system in the bathroom located at apt 1b, 1st story, 1st apartment from south at west
May 4, 2018 · Apt 1B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Sep 23, 2017 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jan 31, 2016 · Apt 3A
Closed — Violation dismissed - BHazardous
Replace the broken or defective control valve at baseboard heater in the 1st room from north located at apt 3a, 3rd story, 1st apartment from north at east
Oct 29, 2015 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 1b, 1st story, 1st apartment from south at west
Sep 4, 2015 · Apt 1B
Closed — Violation closed
DOB building violations · 2
- Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed
ECB violations · 2
- Class - 1
Restore to service, elevator out of service
Jul 23, 2023 · Penalty $1,280
Active - Class - 2
3313.1. compressed gases.noted: at new building under construction.compressed gas tanks on site (lpg) 401g compressed gas tanks at 1st flr level and roof bullshead totla of three. partial stop work order (all
Jul 23, 2013 · Penalty $800
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Oct 11, 2025 · Apt 2C
Close - Unsanitary condition
Pests
Oct 11, 2025 · Apt 2C
Close
Show 40 more ↓
- Unsanitary condition
Pests
Oct 11, 2025 · Apt 2C
Close - Unsanitary condition
Pests
Oct 11, 2025 · Apt 2C
Close - Water leak
Slow leak
Aug 15, 2025 · Apt 3C
Close - Water leak
Slow leak
Aug 15, 2025 · Apt 3C
Close - Heat/hot water
Entire building
Jun 18, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Jun 17, 2025 · Apt 5C
Close - Heat/hot water
Entire building
Jun 14, 2025 · Apt 5C
Close - Heat/hot water
Apartment only
Jun 9, 2025 · Apt 5C
Close - Water leak
Damp spot
Apr 19, 2025 · Apt 2A
Close - Paint/plaster
Ceiling
Apr 19, 2025 · Apt 2A
Close - Paint/plaster
Wall
Apr 19, 2025 · Apt 2A
Close - Water leak
Slow leak
Apr 19, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Feb 13, 2025 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 3C
Close - Unsanitary condition
Mold
Aug 10, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Jul 9, 2024 · Apt 3C
Close - Water leak
Heavy flow
Jul 9, 2024 · Apt 3C
Close - Door/window
Door
Jun 29, 2024 · Apt 1B
Close - Door/window
Door
Feb 19, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Jun 13, 2023 · Apt 2A
Close - Heat/hot water
Entire building
Jun 7, 2023 · Apt 2A
Close - Door/window
Door
Aug 4, 2022 · Apt 2C
Close - Paint/plaster
Ceiling
Jul 5, 2022 · Apt 2A
Close - General
Bell/buzzer/intercom
Jul 5, 2022 · Apt 2A
Close - Paint/plaster
Wall
Jul 5, 2022 · Apt 2A
Close - Paint/plaster
Wall
Jun 22, 2022 · Apt 2A
Close - Plumbing
Steam pipe/riser
Jun 22, 2022 · Apt 2A
Close - Heat/hot water
Entire building
Jun 22, 2022 · Apt 2A
Close - Electric
No lighting
May 10, 2022 · Apt 1B
Close - Electric
No lighting
Apr 21, 2022 · Apt 1B
Close - Water leak
Heavy flow
Apr 12, 2022 · Apt 1B
Close - Paint/plaster
Wall
Nov 29, 2021 · Apt 6C
Close - Unsanitary condition
Mold
Sep 10, 2021 · Apt 6C
Close - Plumbing
Water supply
Aug 10, 2021 · Apt 6C
Close - Unsanitary condition
Mold
Aug 10, 2021 · Apt 6C
Close - Water leak
Damp spot
Aug 10, 2021 · Apt 6C
Close - Appliance
Refrigerator
Aug 10, 2021 · Apt 6C
Close - Heat/hot water
Apartment only
Aug 1, 2021 · Apt 1B
Close - Heat/hot water
Apartment only
Jul 30, 2021 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 13, 2021 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2012
- Floors
- 6
- Residential units
- 17
- Building area
- 16,086 ft²
- Lot area
- 4,088 ft²
- Zoning
- R6A
- Community board
- 206
- Council district
- 15
- Block / lot
- 3050 / 76
- Assessed value
- $643,050
- Landmark / historic district
- No
HPD registration #227162, last renewed Mar 31, 2026.
Questions about 2265 Bathgate Avenue
Who owns 2265 Bathgate Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bridge House 11 Corporation.
Does 2265 Bathgate Avenue have violations?
Yes. NYC HPD has recorded 46 housing violations at this property.
Is 2265 Bathgate Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2265 Bathgate Avenue built?
City records list 2012 as the year it was built.
How many apartments are in 2265 Bathgate Avenue?
It has 17 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.