470 East 183 Street
Bronx, NY 10458BBL 2-03038-0126Map
Owner of record: 470 East 183 Street Property Corp.
470 East 183 Street is a walk-up apartment building built in 2004 in Bronx, 10458. It has 3 residential units across 3 floors. The owner of record is 470 East 183 Street Property Corp.. HPD has recorded 88 housing violations here, most recently on May 8, 2026. 3 of the 50 most recent violations are still open.
- HPD violations
- 88
- DOB violations
- 0
- ECB violations
- 4
- HPD complaints
- 230
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 88
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance
Apr 23, 2026
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish at the center of cellar
Apr 23, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3, 2nd story, 1st apartment from south at west
Apr 23, 2026 · Apt 3
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at 1st story at public hall
Mar 9, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at 1st story at public hall
Mar 9, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at 1st story at public hall
Mar 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door at public hall
Mar 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door in the entrance located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation closed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east at north located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above the ceiling in the 3rd room from east located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective cracked ceramic tiles at floor approximately 2sqft in the kitchen located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Mar 9, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east located at apt apt2, 2nd story, 1st apartment from south at west
Mar 9, 2026 · Apt APT2
Closed — Violation dismissed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts 3 under vacate #260347 posted on 1/30/26 in the entire apartment located at apt, 3rd story, 1st apartment from south at west
Jan 30, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Jan 16, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 2, 2nd story, 1st apartment from south at west
Jan 16, 2026 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Jan 16, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Jan 16, 2026 · Apt 3
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from south at west
Jan 16, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from south at west
Jan 16, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 1, 1st story, 1st apartment from south at west
Jan 16, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the soot at ceiling and walls at public hall, 3rd story
Jan 16, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall at public hall stairs, 1st story
Dec 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the soot at ceiling and all walls due to recent fire at public hall, 3rd story
Dec 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Dec 29, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from east at north located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2, 2nd story, 1st apartment from south at west
Dec 29, 2025 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall stairs, 1st story
Dec 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood tread 2nd up from bottom at public hall stairs, 1st story
Dec 29, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 13, 2025
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 25, 2018
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following minimum of 100 watts as required(light fixture(s) present). at front areaway
Jun 17, 2018
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Dec 7, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 19, 2015
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 3, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Dec 5, 2014
Open — Not complied with - ANon-hazardous
§ 61 m/d law discontinue use unless and until an approved application is filed and a certificate of occupancy is obtained ''1st. sty class 'a' apt used for day care' in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Dec 15, 2011 · Apt 1
Open — Nov certified late - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Jun 15, 2010 · Apt 3
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 4
- Class - 1
Leaving arrangements created at cellar level contrary to cofo# 200936014f (accessory use). observed bed with sheets, personal belongings, clothes, refrigerator, electrical cooking device, microwave, food contai
Feb 25, 2026 · Penalty $2,530
Active - Class - 2
Missing metal entrance door to the boiler room at cellar., repair and/or replace
Feb 25, 2026 · Penalty $6,250
Active - Hazardous
Work witout permit no permit for nb upon insp and as per search of dobrecords no nb permit issued for site excavation & footing in place an d forming & footings in place and forming foundaiton walls in progress
May 3, 2005 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to that allowed by bldg dept records.demo # 10-63. from legal use:vacant lot to illegal use: dead storage of motor vehicles.no license plates.remedy: discontinue illegal use.
Jan 26, 2004 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Mar 2, 2026 · Apt APT2
Close - Heat/hot water
Entire building
Dec 11, 2025 · Apt BLDG
Close - Electric
Outlet/switch
Mar 2, 2021 · Apt 2
Close - Appliance
Refrigerator
Mar 2, 2021 · Apt 2
Close - Water leak
Heavy flow
Mar 2, 2021 · Apt 2
Close - Unsanitary condition
Pests
Mar 2, 2021 · Apt 2
Close - Plumbing
Water supply
Oct 17, 2018 · Apt 2
Close - Nonconst
Rubbish
Nov 10, 2010 · Apt 3
Close - General
Locks
Nov 10, 2010 · Apt 3
Close - Electric
Lighting
Nov 10, 2010 · Apt 3
Close
Show 40 more ↓
- Electric
Electric-supply
Nov 10, 2010 · Apt 3
Close - Heating
Heat related
Nov 10, 2010 · Apt 3
Close - Appliance
Electric/gas range
Sep 19, 2010 · Apt 3
Close - Appliance
Refrigerator
Sep 19, 2010 · Apt 3
Close - Nonconst
Vermin
Jun 8, 2010 · Apt 3
Close - Nonconst
Vermin
Jun 8, 2010 · Apt 3
Close - General
Mold
Jun 8, 2010 · Apt 3
Close - General
Mold
Jun 8, 2010 · Apt 3
Close - General
Doors
Jun 8, 2010 · Apt 3
Close - General
Ventilation system
Jun 8, 2010 · Apt 3
Close - General
Floor
Jun 8, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Jun 8, 2010 · Apt 3
Close - Electric
Lighting
May 22, 2010 · Apt 3
Close - Paint/plaster
Ceiling
May 22, 2010 · Apt 3
Close - General
Floor
May 22, 2010 · Apt 3
Close - Appliance
Electric/gas range
May 22, 2010 · Apt 3
Close - Appliance
Refrigerator
May 22, 2010 · Apt 3
Close - General
Doors
May 22, 2010 · Apt 3
Close - Nonconst
Vermin
May 22, 2010 · Apt 3
Close - Nonconst
Vermin
May 22, 2010 · Apt 3
Close - Plumbing
Water-leaks
May 22, 2010 · Apt 3
Close - Paint/plaster
Ceiling
May 22, 2010 · Apt 3
Close - General
Mold
May 22, 2010 · Apt 3
Close - General
Mold
May 22, 2010 · Apt 3
Close - Paint/plaster
Ceiling
May 22, 2010 · Apt 3
Close - Plumbing
Water-leaks
May 22, 2010 · Apt 3
Close - Paint/plaster
Ceiling
May 22, 2010 · Apt 3
Close - General
Doors
May 22, 2010 · Apt 3
Close - General
Locks
Mar 13, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Mar 13, 2010 · Apt 3
Close - General
Mold
Mar 13, 2010 · Apt 3
Close - General
Mold
Mar 13, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Mar 13, 2010 · Apt 3
Close - Plumbing
Water-leaks
Mar 13, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Mar 13, 2010 · Apt 3
Close - Paint/plaster
Ceiling
Mar 13, 2010 · Apt 3
Close - Heating
Heat related
Mar 13, 2010 · Apt 3
Close - General
Cabinet
Jan 7, 2010 · Apt 3
Close - General
Doors
Jan 7, 2010 · Apt 3
Close - General
Doors
Jan 7, 2010 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 2004
- Floors
- 3
- Residential units
- 3
- Building area
- 2,955 ft²
- Lot area
- 1,278 ft²
- Zoning
- R6A
- Community board
- 206
- Council district
- 15
- Block / lot
- 3038 / 126
- Assessed value
- $54,960
- Landmark / historic district
- No
HPD registration #224869, last renewed Sep 8, 2025.
Questions about 470 East 183 Street
Who owns 470 East 183 Street?
The owner of record in NYC Department of City Planning PLUTO data is 470 East 183 Street Property Corp..
Does 470 East 183 Street have violations?
Yes. NYC HPD has recorded 88 housing violations at this property.
Is 470 East 183 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 470 East 183 Street built?
City records list 2004 as the year it was built.
How many apartments are in 470 East 183 Street?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.