1294 Intervale Avenue
Bronx, NY 10459BBL 2-02974-0044Map
Owner of record: Bronx Nat'l Church/God
1294 Intervale Avenue is a walk-up apartment building built in 1901 in Bronx, 10459. It has 3 residential units across 3 floors. The owner of record is Bronx Nat'l Church/God. HPD has recorded 99 housing violations here, most recently on April 30, 2026. 31 of the 50 most recent violations are still open.
- HPD violations
- 99
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 20
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 99
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Nov 19, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing
Nov 19, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Nov 19, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 19, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing
Nov 19, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame missing
Nov 19, 2024
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, ceiling, north wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Open — Nov certified late
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Oct 1, 2024
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Oct 1, 2024
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the foyer , the private hallway , the bathroom located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling less than 8 feet in height consisting of sheetrock and wood studs in the 1st room from east located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective fire retarding plaster at ceiling at public hall, 1st story
Oct 1, 2024
Open — Nov certified late - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st window frame from east at south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Oct 1, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective hinges at door in the entrance located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Closed — Violation closed - ANon-hazardous
Refit lower sash at 1st window from east at south in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit lower sash at 1st window from north at east in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Refit lower sash at 2nd window from north at east in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st window frame from east at south wall in the 2nd room from east at south located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 1, 1st story, 1st apartment from north at east
Aug 5, 2024 · Apt 1
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 14, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 4, 2015
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum required
Oct 8, 2012
Open — Nov certified late - CImmediately hazardous
Abate the nuisance consisting of rodents rats throughout 2 sty apt 2f. , section '' ''
Apr 21, 1997 · Apt 2F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling walls and trim throughout 2 sty apt 2f. , section '' ''
Apr 21, 1997 · Apt 2F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective 2 sty apt 2f ms velasquez. , section '' ''
Apr 21, 1997 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring east room 2 sty apt 2f. , section '' ''
Apr 21, 1997 · Apt 2F
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Failure to comply w/commissioner's order contained in summons/v35407478l issued5/12/19 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Jul 2, 2021
Resolve
Complaints
- Heat/hot water
Apartment only
Nov 17, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Sep 27, 2024 · Apt 1
Close - Paint/plaster
Wall
Sep 27, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Sep 27, 2024 · Apt 1
Close - Paint/plaster
Wall
Sep 14, 2024 · Apt 1
Close - Paint/plaster
Ceiling
Sep 14, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jul 27, 2024 · Apt 1
Close - Door/window
Window frame
Jul 27, 2024 · Apt 1
Close - Unsanitary condition
Pests
Jul 27, 2024 · Apt 1
Close - Heat/hot water
Entire building
Apr 13, 2018 · Apt BLDG
Close
Show 10 more ↓
- Paint/plaster
Ceiling
Apr 2, 2008 · Apt 2FLR
Close - Paint/plaster
Wall
Apr 2, 2008 · Apt 2FLR
Close - General
Mold
Apr 2, 2008 · Apt 2FLR
Close - General
Mold
Apr 2, 2008 · Apt 2FLR
Close - Paint/plaster
Ceiling
Apr 2, 2008 · Apt 2FLR
Close - General
Ceramic-tile
Apr 2, 2008 · Apt 2FLR
Close - General
Cabinet
Apr 2, 2008 · Apt 2FLR
Close - General
Ceramic-tile
Apr 2, 2008 · Apt 2FLR
Close - Plumbing
Sewer
Apr 2, 2008 · Apt 2FLR
Close - Heating
Heat related
Oct 29, 2007 · Apt 2FLR
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 3
- Residential units
- 3
- Building area
- 3,588 ft²
- Lot area
- 3,864 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 17
- Block / lot
- 2974 / 44
- Assessed value
- $71,220
- Landmark / historic district
- No
HPD registration #214181, last renewed Oct 28, 2025.
Questions about 1294 Intervale Avenue
Who owns 1294 Intervale Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bronx Nat'l Church/God.
Does 1294 Intervale Avenue have violations?
Yes. NYC HPD has recorded 99 housing violations at this property.
Is 1294 Intervale Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1294 Intervale Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 1294 Intervale Avenue?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.