1574 Boston Road
Bronx, NY 10460BBL 2-02967-0006Map
Owner of record: 1555 Seabury Pl Hsing
1574 Boston Road is an elevator apartment building built in 1929 in Bronx, 10460. It has 50 residential units across 6 floors. The owner of record is 1555 Seabury Pl Hsing. HPD has recorded 638 housing violations here, most recently on October 20, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 638
- DOB violations
- 117
- ECB violations
- 125
- HPD complaints
- 483
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 638
- BHazardous
Remove the illegal fastening padlocked gate at south court yard at fire passage way
Oct 20, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south court yard and fire passage way at fire passage way
Oct 20, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at south court yard east stack at fire passage way
Oct 20, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 20, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Properly secure the loose casing at south window frame in the 3rd room from north at east located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash glass pane at window, 1-st from north at east in the 1st room from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash glass pane at window, 1-st from north at east in the 1st room from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective electric light fixture at ceiling in the bathroom located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden casing and jamb at door frame in the 1st room from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Oct 2, 2026 · Apt BA
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at foyer in the 1st entrance from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Sep 21, 2026 · Apt BA
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the 1st entrance from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Sep 21, 2026 · Apt BA
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 1st room from north located at apt ba
Sep 21, 2026 · Apt BA
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt ba
Sep 21, 2026 · Apt BA
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at foyer in the 1st entrance from north located at bsmt-apt ba, 1st bsmt-apt from south at west
Sep 21, 2026 · Apt BA
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges door in the entrance located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 6d, 6th story, 2nd apartment from east at south
Sep 8, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood door frame in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance upper and lower sash window, window at south wall in the bathroom located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective rubber gasket door at refrigertor in the kitchen located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane window, window at east wall in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective door frame entrance in the entrance located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Sep 8, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the 1st room from east located at apt 2g, 2nd story, 1st apartment from west at north
Sep 8, 2026 · Apt 2G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from east located at apt 2g, 2nd story, 1st apartment from west at north
Sep 8, 2026 · Apt 2G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4d, 4th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under sink at wash basin in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under sink in the kitchen located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 6th story
Sep 8, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 6th story
Sep 8, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Sep 8, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the entire apartment located at apt 6d, 6th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance lower sash window, window at north wall in the 4th room from east located at apt 6d, 6th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 6d, 6th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 6D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 5d, 5th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 5D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 6d, 6th story, 2nd apartment from south at west
Sep 8, 2026 · Apt 6D
Open — Nov sent out
DOB building violations · 117
- Construction other optional
Ftm bldg. as noted at time of inspection observed numerous stepcracks throughout exposures two, three, & four. at expsoure three continuous spalling, cracking and deterioration. severe large crack at exposure three also. remedy: repair and/or replace
Jun 11, 2026
Dob violation - active - Construction other optional
Engineer's report requested due to facade in state of des-repair
May 19, 2026
Dob violation - active - Construction other optional
Ftm bldg. observed broken glass @ multi location at exp 1 east elevation, spalling, cracking bricks, open mortar joints, stepcracks, damaged concrete coping, cracking bulging parapet wall, damaged masonr masonry wall. loose brick at all 4 exposures 1,2,3,4 east,south,west, north elevations. remedy: owner to replace or repair facde exter wall
Feb 26, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Failure to maintain bldg in code compliant manner. observed @ exp1, 2,3,4 multiple areas of spalling crack brick step cracks spalling mort joints damaged stone/window sills @ exp3 cracks @ parapet down multipl lvls of facade observed spalling brick @ lintels and cracked stucco, coping stone throughout facade. remedy: repair and/or replace
Apr 1, 2025
Dob violation - active - Immediate emergency anythingoptional
Repair sidewalk shed, install sidewal shed parapet @ expo #1 east elev ation apprx 20" linear feet and expo#4 north elevation apprx 60' linea r feet replace all rotter/damaged mud sill at expo#1 east elevation an d expo#4 north elevation
Apr 1, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Construction other optional
Failure ot maintain bldg in code compliant manner. exposures 1,2 & 4 (e,s&n elev) damaged/deteriorated/missing mortar joints.at exp 1&4 step cracks and missing/spalled coping stones. exp@ (s elev) cracks on facade & window sills. exp3(w elev) cracks on stucco. all exps deterio damage lintels.exp2&3 spalling bricks. remedy: repair and/or replace
Oct 10, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active
Show 40 more ↓
- Construction other optional
Failure to maintain building in a code compliant manner.observed build ing in hazardous deterioration at all exposures as follows:cracked,dam aged coping stone,spalling,corrosions of fire escape,bulging and damag ed joints.remedy:repair and/or replace
Jun 12, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2023
Dob violation - active - Construction other optional
Emergency work order due to step cracks,damaged/open mortar joints and spalled/spalling stone work on all exposures.make immediate repairs under supervision of licensed professional
Sep 27, 2023
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner observed step cracks,damaged/open mortar joints,spalled/spalling stone work on all expossures in multiple locations.remedy:repair and or replace
Sep 27, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Failure to maintain building in a code compliant manner.observed crack s,step crack,broken damaged bricks and mortar joints and spalling on a ll four exposures of the building.items are placed on fire escape bloc king egress.remedy:repair and/or replace
Jun 15, 2023
Dob violation - active - Construction other optional
Temporary construction equipment on site expired permit.during inspect ion observed sidewalk shed permit has expired.remedy:renew permit
Jun 15, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Construction other optional
Ftm bldg in code compliant manner. observed defective masonry at all 4 exposures whcik includes: spalled coping stones, step/vertical cracked brickwork, cracked window sills, rusted fire escape w/objects, open mortar joints,loose bricks and rusted metal lintels. remedy: provide safety measures, repair and replace
Dec 12, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active - Construction other optional
Ftm exterior bldg facade and appurtenances. bldg has defective masonry facade on all exposures which include spalled coping stones, step cracking, cracked window sills, vertical cracking, open mortar joints. objects on fire escapes, rusted fire escapes. remedy: maintain exterior bldg facade, procide safety measures, repair damaged facade
Aug 25, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2022
Dob violation - active - Immediate emergency anythingoptional
Repair sidewalk shed. install sidewalk shed parapet panels at exposure 1 approximately 20.0' and exposure 4 approximately 40.0'
Jan 5, 2022
Dob violation - active - Construction other optional
Failure to maintain exteior building facade and appurtenances at west and south elevationsl,exposures# 2&3 observed vertical cracks at parapet wall also at roof level cracked masonry wall chimney remedy: naubtaub exteruir byukdubg wakk;provide safety measures,repair defective facade at exposure#2&3
Jan 4, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 27, 2021
Dob violation - active - Construction other optional
Failure to comply with commissioner's order ac 28-201.1. building owner failure to comply with commissioner's order 050918ll0301pr issued on 05/09/2018. as of 08/04/2021 owner has not complied with immediate cure order. remedy: immed comply with code anc commissioner's order
Aug 4, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 21, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2021
Dob violation - active
ECB violations · 125
- Class - 1
Noted gate padlocked blocking exit from rear fire escapes. fdny has cut lock repeatedly and building super has replaced it. more than 7 violations issued for same offense, see vio 35726406k, 35690076p, etc. loc
Jul 1, 2026 · Penalty $12,530
Active - Class - 1
Failure to provide unobstructed exit passageway. noted at time of inspection observed at exposure four numerous household objects on fire escapes. objects may cause tripping hazards at night. remedy: remove obj
Jun 11, 2026 · Penalty $12,500
Active - Class - 2
Expired sidewalk shed permit. noted at time of inspection on 6/11/2026observed expired sidewalk shed. no permit posted at premises and no valid permit found in dob now or bis data base. latest valid permit for
Jun 11, 2026 · Penalty $1,280
Active - Class - 2
At time of inspection observed that sws was in place and expired on 03/13/2026 permit no.x01214361-i1-sh, renew permit
May 19, 2026 · Penalty $6,250
Active - Class - 1
At time of inspection observed facade in state of des-repair at all exp, step crack, missing mortar joints, chimney also has crack. sws in place with expired permit from 03/13/2026., repair and/replace
May 19, 2026 · Penalty $12,500
Active - Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at first floor interior commercial space reception, conference & office 1 rooms, 2 partial open ceilings collapsed from wate
Apr 13, 2026 · Penalty $25,000
Active - Class - 1
Failure to provide unobstructed exit passageway. at time of inspection, i observed flower pots blocking shortside of landing deck of fire escape at expo 1, east elevation, and observed. household stuffs, chairs
Feb 26, 2026 · Penalty $12,500
Active - Class - 2
Expired sidewalk shed permit at times of inspection sidewalk shed permit #220511186-i1-fq-sh issued on oval 12016 expired on 1-20-2017 no valid permit observed. remedy: renew permit.
Apr 1, 2025 · Penalty $10,000
Active - Class - 1
Failure to provide unobstructed exit passageway at time of inspection it was observed at exp 1, 4 flower pots, bbq grill boxes and other objects blocking egress. remedy: remove obstruction.
Apr 1, 2025 · Penalty $12,500
Active - Class - 2
Pedestrian protection does nor meet code specifications at time of inspection it was observed at exposures 1 and 4 deteriorated/rotten and broken mudsills at multiple locations observed missing parapet panels i
Apr 1, 2025 · Penalty $10,000
Active
Show 40 more ↓
- Class - 2
At time of inspection of a 6-story mix use building, i observed no sign construction activities sidewalk shed erected exp#1-2.upon doing my research in departments of buildings records show permit expired 03-29
Mar 21, 2025 · Penalty $6,250
Active - Class - 2
At time of inspection of a 6story mix use building, i observed no sign construction activities sidewalk shed erected exp#1-2.during my inspection i noticed erected exp#1-2 not as per code missing parapet panel.
Mar 21, 2025 · Penalty $10,000
Active - Class - 2
Expired sidewalk shed permit: at time of inspection sidewalk shed permit #220511186-i1-eq-2h issued on 01/21/2016, expired on 01/20/2017. remedy: renew permit.
Oct 10, 2024 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed exit passageway: at time of inspectionit was obsevred at exposure 1 and 4(east and north elev) flower pots and a bbq grill obstructing egress passageway. flower pots observed at
Oct 10, 2024 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications: at time of inspection, it was observed at exposures 1 and 4(east and north elev) deteriorated/rotten and broken mudsills at multiple locations. remedy: c
Oct 10, 2024 · Penalty $10,000
Active - Class - 1
Elevator currently out of service in the basement, restore to service
Jul 23, 2024 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed passage way note:at time of inspection observed items stored on fire escape landing at exp #1 & exp #4.remedy.remove egress obstructions
Jun 12, 2024 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications:defected/inadequate shed conditions observed missing/loose parapet panel & damanged/rotted mudsill.remedy:comply to code specifications
Jun 12, 2024 · Penalty $10,000
Active - Class - 2
Expired sidewalk shed permit.observed permit #22051186-01-eq-sh.exp date -1/20/2017.remedy:renew permit
Jun 12, 2024 · Penalty $6,250
Active - Class - 2
Failure to submit an acceptable required cycle 6, 7b, 8b, and 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907402. agg2 history of
Apr 11, 2024 · Penalty $10,000
Active - Class - 2
Sidewalk shed in place without valid permit. observed sidewalk shed with expire permit. the previous issued sws permit expired on 01/20/2017. remedy: obtain/renew permit.
Jan 30, 2024 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specification. observed missing sws parapet wall panels on corner of exp. #1 and 4(east 4 north elevation). remedy: comply with code specification.
Jan 30, 2024 · Penalty $10,000
Active - Class - 1
Failure to provide unobstructed exit passageway. observed flower pots and bbq grill on exposure #4(north elevation). this condition was previously slated in summon #3567542y. remedy: remove obstruction.
Jan 30, 2024 · Penalty $12,500
Active - Class - 1
Unlawful acts; failure to comply with commissioner's order. at time ofinspection observed previously mentioned violated conditions still exists. the previous violations are ewo #092723sr20304xn; #09272023sr2030
Jan 30, 2024 · Penalty $12,500
Active - Class - 1
No door lock monitoring installed in controller as mandated in appendix k of the 2014 building codes; remedy install dlm file and perform test with nyc dob;expired cat 1 tags, provide; dirty pit; water in pit;
Oct 4, 2023 · Penalty $12,500
Active - Class - 2
Failure to obtain permit prior to installation/use of a side walk shed. as of today 09/27/2023 no valid permit found for sidewalk shed. lastvalid permit expired on 01/20/2017. remedy: obtain a permit.
Sep 27, 2023 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed exit passage way. observed flower potson fire escape on exposure 1. remedy: remove obstruction.
Sep 27, 2023 · Penalty $6,250
Active - Class - 2
Failure to obtain permit prior to installation/use of sidewalk shed.as of today 9/27/23 no valid permit found for sidewalk shed.lost valid permit expired 1/29/17.remedy:obtain permit.
Sep 27, 2023 · Penalty $6,250
Active - Class - 1
Failure to provide unobstructed exit passageway. observed flower pots on fire escape on exposure 1. remedy: remove obstruction
Sep 27, 2023 · Penalty $6,250
Active - Class - 2
Temporary construction equipment on site expired permit during inspection sidewalk shed permit was looked at and found to be expired. remedy: renew permit
Jun 15, 2023 · Penalty $6,250
Active - Class - 2
Expired sidewalk shed permit#x00692454 as of 03/23/2023 no permit posted nor on database.rem:renew permit.
Mar 23, 2023 · Penalty $6,250
Active - Class - 2
Note: at the time of inspection observed a temporary construction equipment sidewalk shed erected at exp1, 2 with permit#220511186-sh, which was expired at 01/20/2017 & not renewed.renew sidewalk shed permit.
Feb 2, 2023 · Penalty $6,250
Active - Class - 2
Note: at the time of inspection observed a sidewalk shed at exp1,2 have missing screw caps creating sharp edge condition(3307.6.5.6) & cut hazard for pedestrian; missing parapet(3307.6.4.6) about 5ft at exp2 &
Feb 2, 2023 · Penalty $10,000
Active - Class - 2
Temporary construction equipment onsite-expired permit.note at the time of inspection,the sidewalk shed permit#2205111886-01-eqsh was expired.remedy:renew permit.
Dec 12, 2022 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications.note observed rotten mud sills at exp1 and 2.missing parapet part at the corner of exp1 and 4.remedy:comply to code specifications.
Dec 12, 2022 · Penalty $10,000
Active - Class - 2
Failure to submit acceptable required cycle6,7b,8b report of critical exam documenting condition of exterior wall&appurtenances required by 28-302.4 for control807402.agg2:hist of noncompliance on 37021665h(agg
Oct 19, 2022 · Penalty $10,000
Active - Class - 2
Pedestrian protection does not meet code specifications at the time ofinspection,observed sidewalk shed installed at elevations east and north(exposures#1 and #4)not maintained as per code(missing parapet wall)
Jun 15, 2022 · Penalty $10,000
Active - Class - 2
Failure to obtain a temporary construction permit prior to installation/use of temporary construction equipment.at time of inspection,observed installation of sidewalk shed at east and north elevations(exposure
Jun 15, 2022 · Penalty $10,000
Active - Class - 2
Pedestrian protection does not meet code specification.at time of inspection observed sidewalk shed installed at elevations east and north(exp #1)not maintained as per code.sws missing parapet wall at multip
Jan 4, 2022 · Penalty $10,000
Active - Class - 2
Installation of sidewalk shed w/o permit.at time of inspection observed installation sws at east & north elevations(exps #1 #4) w/o permit.remedy:obtain permit for sidewalk shed.
Jan 4, 2022 · Penalty $6,250
Active - Class - 2
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. file application install dlm and perfor
Aug 25, 2021 · Penalty $3,125
Active - Class - 1
Cease use items five year test expired. one year test expired. brake test expired. door restrictor not installed. traveling damaged replace .non cease use items door lock monitoring not installed. by pass 2 flo
Jul 26, 2021 · Penalty $6,250
Active - Class - 2
Failure to submit an acceptable required cycle 6,7b,& 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#807402. agg2 history of noncomplia
Jun 1, 2021 · Penalty $10,000
Active - Class - 1
Restore to service class 1 continued e mail for reinspection
Apr 27, 2021 · Penalty $6,250
Active - Class - 1
Restore device to service. remedy; complete necessary repairs and schedule re-inspection with nycdob.
Apr 16, 2021 · Penalty $6,250
Active - Class - 1
Service not restored cat 1 expired cat 5 expired no door lock monitoring installed traveling cable no good
Mar 30, 2021 · Penalty $6,250
Active - Class - 1
Traveler cable damaged replace/ cease use. install door lock monitoring as per 3.10.12
Mar 15, 2021 · Penalty $6,250
Active - Class - 2
Pedestrian protection does not meet code specifications.at the time ofinspection,i observed sidewalk shed installed at exposures#1 and 4,andnot maintained as per code.sidewalk shed is missing parapet walls,dete
Feb 23, 2021 · Penalty $10,000
Active - Class - 1
Restore device to service so that inspection can be made by this department.
Feb 18, 2021 · Penalty $6,250
Active - Class - 2
Failure to maintain building exterior walls/facade and appurtenances. note at the time of inspections observation view of facade:cracks deterioration at exposure 1,2,3 and 4 on the south,north east and west ele
Nov 21, 2020 · Penalty $6,250
Active
Complaints
- Flooring/stairs
Floor
Oct 14, 2026 · Apt BA
Open - Plumbing
Water supply
Oct 14, 2026 · Apt BA
Open - Water leak
Heavy flow
Oct 14, 2026 · Apt BA
Open - Paint/plaster
Ceiling
Oct 14, 2026 · Apt BA
Open - Electric
No lighting
Oct 14, 2026 · Apt BA
Open - Door/window
Door
Sep 30, 2026 · Apt BA
Close - Door/window
Door
Sep 30, 2026 · Apt BA
Close - Door/window
Window pane
Sep 30, 2026 · Apt BA
Close - Electric
No lighting
Sep 30, 2026 · Apt BA
Close - Paint/plaster
Ceiling
Sep 30, 2026 · Apt BA
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Sep 30, 2026 · Apt BA
Close - Door/window
Door frame
Sep 30, 2026 · Apt BA
Close - Flooring/stairs
Floor
Sep 30, 2026 · Apt BA
Close - Water leak
Heavy flow
Sep 30, 2026 · Apt BA
Close - Water leak
Slow leak
Sep 6, 2026 · Apt BA
Close - Plumbing
Boiler
Aug 13, 2026 · Apt CC
Close - Safety
Fire escape
Jun 6, 2026 · Apt BAGROU
Close - Paint/plaster
Ceiling
Jun 6, 2026 · Apt BA
Close - General
Bell/buzzer/intercom
Jun 6, 2026 · Apt BA
Close - Paint/plaster
Ceiling
Jun 6, 2026 · Apt BA
Close - Electric
Lighting
Jun 6, 2026 · Apt BA
Close - Unsanitary condition
Pests
Jun 6, 2026 · Apt BA
Close - Plumbing
Water supply
Jun 6, 2026 · Apt BA
Close - Paint/plaster
Wall
Dec 15, 2025 · Apt BA
Close - Door/window
Window frame
Dec 15, 2025 · Apt BA
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt BA
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 2C
Close - Flooring/stairs
Floor
Oct 15, 2025 · Apt BA
Close - Flooring/stairs
Floor
Oct 15, 2025 · Apt BA
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt BA
Close - Paint/plaster
Wall
Oct 15, 2025 · Apt BA
Close - Electric
Lighting
Oct 15, 2025 · Apt BA
Close - Electric
Outlet/switch
Oct 15, 2025 · Apt BA
Close - Paint/plaster
Wall
Oct 15, 2025 · Apt BA
Close - Paint/plaster
Ceiling
Oct 15, 2025 · Apt BA
Close - Unsanitary condition
Pests
Oct 15, 2025 · Apt BA
Close - Unsanitary condition
Mold
Oct 15, 2025 · Apt BA
Close - Plumbing
Bathtub/shower
Oct 15, 2025 · Apt BA
Close - Plumbing
Basin/sink
Oct 15, 2025 · Apt BA
Close - Door/window
Door frame
Oct 15, 2025 · Apt BA
Close - Door/window
Window frame
Oct 15, 2025 · Apt BA
Close - Plumbing
Basin/sink
Sep 26, 2025 · Apt BA
Close - Flooring/stairs
Floor
Sep 26, 2025 · Apt BA
Close - Flooring/stairs
Floor
Sep 26, 2025 · Apt BA
Close - Paint/plaster
Wall
Sep 26, 2025 · Apt BA
Close - Unsanitary condition
Mold
Sep 26, 2025 · Apt BA
Close - Electric
Power outage
Sep 26, 2025 · Apt BA
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1929
- Floors
- 6
- Residential units
- 50
- Building area
- 50,000 ft²
- Lot area
- 9,789 ft²
- Zoning
- R1-2
- Community board
- 203
- Council district
- 17
- Block / lot
- 2967 / 6
- Assessed value
- $2,025,450
- Landmark / historic district
- No
HPD registration #202797, last renewed Jul 23, 2019.
Questions about 1574 Boston Road
Who owns 1574 Boston Road?
The owner of record in NYC Department of City Planning PLUTO data is 1555 Seabury Pl Hsing.
Does 1574 Boston Road have violations?
Yes. NYC HPD has recorded 638 housing violations at this property.
Is 1574 Boston Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1574 Boston Road built?
City records list 1929 as the year it was built.
How many apartments are in 1574 Boston Road?
It has 50 residential units and 54 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.