roofy

1417 Prospect Avenue

Bronx, NY 10459BBL 2-02962-0040Map

Owner of record: 1417 Prospect LLC.

1417 Prospect Avenue is a walk-up apartment building built in 1905 in Bronx, 10459. It has 20 residential units across 5 floors. The owner of record is 1417 Prospect LLC.. HPD has recorded 1,286 housing violations here, most recently on October 21, 2026. 49 of the 50 most recent violations are still open.

HPD violations
1,286
DOB violations
17
ECB violations
18
HPD complaints
1,650

What to know

Concern
24 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,286

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • C

    Trace and repair the source and abate the visible mold condition... greater then 30 sqft at ceiling,north, east, south and west walls in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 sqft at sink cabinet floor in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • B

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Oct 21, 2026

    Open — Violation open
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Oct 21, 2026 · Apt 3D

    Open — Violation open
  • B

    Properly repair with similar material the broken or defective fire retardant material at west wall public hall , 1st story

    Oct 21, 2026

    Open — Violation open
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Oct 21, 2026

    Open — Violation open
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story

    Oct 21, 2026

    Open — Violation open
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Oct 20, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story

    Oct 20, 2026

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Oct 20, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south

    Oct 20, 2026 · Apt 2A

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Oct 20, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Oct 20, 2026 · Apt 1A

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective defective hinges at building entrance door from street to vestibule , 1st story

    Sep 22, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective heavy duty lock and its assemblies at building entrance door from street to vestibule , 1st story

    Sep 22, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective metal cornice at building front at cornice

    Sep 22, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective shattered glass pane at lower sash at building entrance door. at public hall, 1st story

    Sep 22, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story

    Sep 22, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 22, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 22, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lifting flashing at parapet at east exterior wall

    Sep 16, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft inside base cabinet at sink in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Notice of issuance sent to tenant
  • C

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • C

    Replace the broken or defective washbasin in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • C

    Trace and repair the source and abate the visible mold condition... greater than 30 sq.ft at all walls and ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective bell buzzer intercom return system from building entrance to panel at north wall in the private hallway located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 5D

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 5D

    Open — Notice of issuance sent to tenant
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Sep 16, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Sep 16, 2026 · Apt 5A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Sep 16, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling and window casing in the bathroom located at apt 5a, 5th story, 1st apartment from east at south

    Sep 16, 2026 · Apt 5A

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south

    Sep 16, 2026 · Apt 5A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and east wall at 1st public hall bulkhead from north, 5th story

    Sep 16, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at 1st public hall bulkhead from north, 5th story

    Sep 16, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction materials at 1st public hall bulkhead from north, 5th story

    Sep 16, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story

    Sep 16, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lower sash glass pane at vestible door , 1st story

    Sep 16, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of range connected to extension chord in the kitchen located at apt 3d, 3rd story, 2nd apartment from south at west

    Sep 16, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 5a, 5th story, 1st apartment from east at south

    Sep 16, 2026 · Apt 5A

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock and assembly at vestibule door , 1st story

    Sep 6, 2026

    Open — Nov certified on time

DOB building violations · 17

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 13, 2022

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 17, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
Show 7 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Feb 7, 2000

    Dob violation - active

ECB violations · 18

  • Class - 2

    28-305.1. failure to maintain retaining wall. as noted: at time of inspection, observed retaining wall(rw) along exposure #1 of the subject address(1417 prospect ave bronx). the rw was observed to be along a pu

    Jan 3, 2026 · Penalty $6,250

    Active
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not received a retaining wall condition assess

    Feb 25, 2025 · Penalty $6,250

    Active
  • Class - 1

    Cease use rockmills mp-40 boiler, due to "co" reading, in bsmt, 45ppm. do not operate boiler until all hazardous condition are corrected and dob is notified in order to re inspect to lift the cease use order. r

    Jan 18, 2022 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#39033778p issued on 12/16/20 &to file a cert of correction pursuant to 28-201 .1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c

    Feb 25, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Residence converted maintained or occupied as a dwelling for more than the legally approved number of families authorized by c of o. c/o #21598 indicates premises to be 21 family with 1 cellar supt. apt. at tim

    Dec 16, 2020 · Penalty $2,500

    Active
  • Class - 2

    Work without a permit. at time of inspection, observed, installed water & waste line for 2 piece of bathroom inside the cellar., obtain all permits

    Dec 16, 2020

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspection, observed, exit passageway from rear yard to the street is blocked by chain-link fence which is affecting all 11 apartment's (1b, 2b, 3b, 4

    Dec 16, 2020 · Penalty $625

    Active
  • Class - 2

    Found holes in walls and ceiling, seal all openings, also exposed wiring, flue pipe not properly supported and corroded, replace flue pipe and support properly. remove all combustible storage from boiler room.

    Apr 10, 2020 · Penalty $625

    Active
  • Class - 2

    Uncapped water piping in boiler room-piping hung with prohibited material-control siphons, metal not to code-leaking sewer piping over boiler; correct all violating conditions, submit a certificate of correctio

    Nov 19, 2019 · Penalty $625

    Active
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35297146k issued 01/19/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maitain building

    Mar 16, 2018 · Penalty $3,125

    Resolve
Show 8 more ↓
  • Class - 2

    Failure to maintain bldg wall(s)or appurtenances.noted:at exp#1,metal cornice at parapet wall rusted,deteriorating and missing in several areas.rem:maintain exterior bldg.

    Jan 19, 2018 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building wall(s)or appurtenances.rusted and deteriorating aluminium cornice observed at front of building.rem:obtain permit if feasible to make all necessary repairs.

    Dec 15, 2017 · Penalty $250

    Resolve
  • Class - 2

    Failure to maintain building in code-compliant manner. on 4/22/16 at 11:40am at above address i observed that combination stove,and oven not working properly, not lighting and burning correctly.needs to be s

    Apr 22, 2016

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner. noted: at 2nd sty,apt 2a bathroom ceiling has a hole approx 2ft x 1ft evidence of a concealed leak. remedy: repair &/or replace.

    Jun 18, 2015 · Penalty $100

    Active
  • Class - 2

    B254,15,40,50. 50- no shut off value between tank and anti sydhan.

    Jun 27, 2011 · Penalty $1,250

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order.remedy:comply w/code.

    Nov 28, 2008 · Penalty $4,800

    Resolve
  • Class - 2

    Failed to notify dept/obtain permit prior to use/inst. off c-hooks outrigger beams to connection with suspended scaffold. (no c-hook notification) remedy: notify the department.

    Nov 14, 2008 · Penalty $800

    Resolve
  • Class - 2

    Supervision or use of rigging equipment w/o a rigger's license. remedy: comply with code.

    Nov 14, 2008

    Resolve

Complaints

  • Flooring/stairs

    Floor

    Oct 22, 2026 · Apt 2D

    Open
  • Door/window

    Door

    Oct 22, 2026 · Apt 2D

    Open
  • Water leak

    Heavy flow

    Oct 22, 2026 · Apt 2D

    Open
  • General

    Cabinet

    Oct 22, 2026 · Apt 2D

    Open
  • Paint/plaster

    Ceiling

    Oct 22, 2026 · Apt 2D

    Open
  • Heat/hot water

    Apartment only

    Oct 20, 2026 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Oct 19, 2026 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2026 · Apt 1A

    Close
  • Plumbing

    Water supply

    Sep 18, 2026 · Apt 5A

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Sep 18, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Sep 15, 2026 · Apt 2D

    Close
  • Water leak

    Heavy flow

    Sep 15, 2026 · Apt 2D

    Close
  • Plumbing

    Water supply

    Sep 15, 2026 · Apt 5A

    Close
  • Plumbing

    Bathtub/shower

    Sep 15, 2026 · Apt 1D

    Close
  • Appliance

    Electric/gas range

    Sep 15, 2026 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    Sep 15, 2026 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2026 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Sep 15, 2026 · Apt 3D

    Close
  • Plumbing

    Bathtub/shower

    Sep 15, 2026 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Sep 15, 2026 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Sep 15, 2026 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Sep 15, 2026 · Apt 1D

    Close
  • Heat/hot water

    Apartment only

    Sep 15, 2026 · Apt 1D

    Close
  • Door/window

    Door

    Jul 19, 2026 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Jun 3, 2026 · Apt 1D

    Close
  • Paint/plaster

    Ceiling

    Jun 3, 2026 · Apt 1D

    Close
  • Appliance

    Electric/gas range

    Jun 3, 2026 · Apt 1D

    Close
  • Plumbing

    Basin/sink

    May 1, 2026 · Apt 1B

    Close
  • Water leak

    Slow leak

    May 1, 2026 · Apt 1B

    Close
  • Appliance

    Electric/gas range

    May 1, 2026 · Apt 1B

    Close
  • Plumbing

    Radiator

    May 1, 2026 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    May 1, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 1, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Apr 14, 2026 · Apt BASEME

    Close
  • Appliance

    Electric/gas range

    Apr 14, 2026 · Apt BASEME

    Close
  • Plumbing

    Basin/sink

    Apr 14, 2026 · Apt BASEME

    Close
  • Unsanitary condition

    Mold

    Apr 14, 2026 · Apt BASEME

    Close
  • Electric

    Power outage

    Mar 30, 2026 · Apt 1A

    Close
  • Plumbing

    Basin/sink

    Feb 19, 2026 · Apt 4C

    Close
  • Plumbing

    Water supply

    Jan 5, 2026 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Oct 14, 2025 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Oct 14, 2025 · Apt 4A

    Close
  • Safety

    Smoke detector

    Oct 14, 2025 · Apt 4A

    Close
  • General

    Cabinet

    Oct 14, 2025 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Oct 14, 2025 · Apt 4A

    Close
  • Safety

    Carbon monoxide detector

    Oct 14, 2025 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Oct 14, 2025 · Apt 4A

    Close
  • Electric

    Outlet/switch

    Oct 14, 2025 · Apt 4A

    Close
  • Plumbing

    Toilet

    Oct 4, 2025 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1905
Floors
5
Residential units
20
Building area
18,200 ft²
Lot area
5,910 ft²
Zoning
R6
Community board
203
Council district
17
Block / lot
2962 / 40
Assessed value
$330,300
Landmark / historic district
No

HPD registration #208867, last renewed Sep 11, 2025.

Questions about 1417 Prospect Avenue

Who owns 1417 Prospect Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1417 Prospect LLC..

Does 1417 Prospect Avenue have violations?

Yes. NYC HPD has recorded 1,286 housing violations at this property.

Is 1417 Prospect Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1417 Prospect Avenue built?

City records list 1905 as the year it was built.

How many apartments are in 1417 Prospect Avenue?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.