199 Mt Eden Parkway
Bronx, NY 10457BBL 2-02824-0019Map
Owner of record: Bronx Lebanon Hospital
199 Mt Eden Parkway is a hospital / health built in 2010 in Bronx, 10457. The owner of record is Bronx Lebanon Hospital. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 40
- ECB violations
- 21
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 40
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed
Show 30 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2017
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2016
Feb 16, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 16, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
Inadequate details on approved plans for embedment of soldier piles fo r contilevel shoring along exposure 2 (mt eden pkwy) and exp 1 (morris ave) where raker bracing is not designed noted also that rock enecoun tered along morris ave at approx 20
Sep 14, 2009
Dob violation - dismissed - Construction other optional
Failure to provide approved accepted plans at job site at time of insp ection noted at time of inspection contractor failed to provide a full set of approved plans excavation in progress no support of excavation plan provided remedy: provide plans stop all work call dob 212 442-15 44 for reinspection
Sep 10, 2009
Dob violation - dismissed - Construction other optional
Miscellaneous violations failure to provide a adequate construction fe nce in adequaces noted upon inspection no 8ft high solid construction at exposure 2 approx 60ft missing or inadequate stop all work! entire site remedy: comply with notice of violations install construction fen ce make safe call for re-inspection excavation unti 212 442-1544
Aug 18, 2009
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Aug 12, 1992
Dob violation - dismissed
ECB violations · 21
- Class - 2
Building or open lot occupied without a valid certificate of occupancy. noted: at time of inspection observed 'bronx care wellness center' fully operational & occupied with tco # 201095215t005 having expired on
May 18, 2026 · Penalty $620
Active - Class - 2
Failure to submit an acceptable required cycle 8a and 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#918343.rem:submit acceptable req
Dec 9, 2022
Resolve - Class - 2
3314 partial swo:supported scaffold does not meet dob specifications.1-supported scaffold on morris ave has bend base frame 2-fax sheet "appointment request" for reinspection 3-make repairs.rem:comply w/code.sw
Jun 13, 2012
Resolve - Class - 1
Sec. 3303.12. hoist - failure to have elevator in a state of readiness. noted: 9 sty steel (framed) bldg under construction has no elevator in state of readiness. bldg code states a working hoist/elevator must
May 3, 2012 · Penalty $1,600
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: at 9 sty steelframe bldg a sidewalk shed has been erected at exp 1 & exp 4 under appl #220078699-01-eq-sh has lally column tube steel leaning approx
May 3, 2012 · Penalty $2,400
Resolve - Class - 1
Sec. 3316.4. temporary use certificate expired. noted: at time of inspection at active job site observed temporary hoist in operation w/expired use cert on 1.18.12. partial stop work order - issued pursuant to
Feb 6, 2012
Resolve - Class - 1
Sec. 3308.3. vertical safety netting not per code damaged or inadequate. noted: at time of inspection at active job site observed defective not as per code vertical netting at roof location - next to temporary
Feb 6, 2012 · Penalty $1,600
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate at a 9 story nb under construction,the following was observed w/a scaffold permit #220085333-eq-sf 3 men found working on(supported) pipe scaffold at
Jan 3, 2012 · Penalty $8,000
Resolve - Class - 2
Failure to post dot permit for street/sidewalk closing at above active jobsite,the following was observed: at exposure 1 construction container is in front of site w/no valid dot permit,last dot permit
Jan 3, 2012
Resolve - Class - 2
Job site fence not constructed pursuant to subsection.noted:@ time of inspec.@ active job site observed sections of side fence is pulling away,sticking out to public sidewalk area,creating unsafe conditions for
Oct 3, 2011
Resolve
Show 11 more ↓
- Class - 2
Failure to maintain adequate housekeeping per section requirements.noted:@ time of insp @ active job site observed excessive accumulations of const debris scattered under metal scaffoldings & @ various location
Oct 3, 2011
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.excessive amount of construction debris observed throughout the bldg & around the site.also noted two (2)small plastic containers overflown wit
Sep 1, 2010
Resolve - Class - 1
3308.3)failure to institute/maintain safety equipment measures or temporary construction-no vertical safety netting.@ time of inspection on active construction site,bldg constructed up to 6th flr level.approx 7
Aug 18, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to provide sidewalk shed where required.@ time of inspection on active construction site,bldg up to 6th flr level approx 70'high.sidewalk shed not provided around perimeter of the site along mount eden
Aug 18, 2010 · Penalty $4,800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guard rails.@ time of inspection on active construction site,bldg up to 6th flr level.there were guardrails missing on elevat
Aug 18, 2010 · Penalty $1,200
Resolve - Class - 2
Sec. 3301.2. failure to safeguard all persons and property affected byconstruction operations. at time of inspection on active construction site bldg constructed up to 6th flr level approx 70'high. several
Aug 18, 2010 · Penalty $400
Resolve - Class - 1
3313.1)failure to provide fdny permit for storage & use of all flammable & combustible mixtures.@ time of inspection on active construction site,bldg constructed up to 6th flr level.noted:oxygen & acetylene tan
Aug 18, 2010 · Penalty $1,600
Resolve - Class - 2
Sec. 3307.7;27-1021. failure to provide an adequate construction fence. inadequacies noted: upon inspection no solid 8'high construction fence in place at exp 2 approx 60' missing or inadequate. remedy: comply
Aug 18, 2009 · Penalty $400
Resolve - Class - 1
Sec. 3304.3.1;27-195. failure to notify dob w/i 24-48 hrs of start of excavation. noted: upon inspection excavator on site/dirt removed and earth ramp in place, no notification given to dob. remedy: comply
Aug 18, 2009 · Penalty $1,200
Resolve - Hazardous
Dumping debris off side of building from the 4th floor. noted 2 heaps of debirs 31/2 stories high on east side of building remedy: remove debris as per code on the inside of the building
Apr 1, 1997
Resolve - Hazardous
Failure to safeguard public and proerty affected by construction operations a portion of the sidewalk shed bulkhead has collapsed onto the sidewalk injuring a pedestion remedy make sidewalk shed safe
Sep 17, 1996 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 19, 2025 · Apt 1FL
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I1)
- Year built
- 2010
- Floors
- 9
- Residential units
- —
- Building area
- 66,070 ft²
- Lot area
- 6,700 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 15
- Block / lot
- 2824 / 19
- Assessed value
- $10,287,900
- Landmark / historic district
- No
Questions about 199 Mt Eden Parkway
Who owns 199 Mt Eden Parkway?
The owner of record in NYC Department of City Planning PLUTO data is Bronx Lebanon Hospital.
Does 199 Mt Eden Parkway have violations?
NYC HPD has no housing violations on record for this property.
Is 199 Mt Eden Parkway rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 199 Mt Eden Parkway built?
City records list 2010 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.