roofy

1688 Morris Avenue

Bronx, NY 10457BBL 2-02794-0039Map

Owner of record: Martinez, Hector L

1688 Morris Avenue is a two-family home built in 1920 in Bronx, 10457. It has 2 residential units across 2 floors. The owner of record is Martinez, Hector L. HPD has recorded 5 housing violations here, most recently on August 9, 2006. 5 of the 5 most recent violations are still open.

HPD violations
5
DOB violations
2
ECB violations
4
HPD complaints
16

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Aug 9, 2006

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 5

  • C

    Repair the broken or defective plastered surfaces and paint in uniform color ceiling . in the kitchen located at apt 1, 1st story, apartment at east

    Aug 9, 2006 · Apt 1

    Open — Certification postponment denied
  • B

    Properly repair the broken or defective electric wall outlet at east wall . in the kitchen located at apt 1, 1st story, apartment at east

    Aug 9, 2006 · Apt 1

    Open — Certification postponment granted
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and east wall . in the kitchen located at apt 1, 1st story, apartment at east

    Aug 9, 2006 · Apt 1

    Open — Certification postponment granted
  • B

    Remove all obstructions and repair all defects in drain line at bathtub. in the bathroom located at apt 1, 1st story, apartment at east

    Aug 9, 2006 · Apt 1

    Open — Certification postponment granted
  • C

    Abate the nuisance consisting of rodents rats . in the entire apartment located at apt 1, 1st story, apartment at east

    Aug 9, 2006 · Apt 1

    Open — Certification postponment denied

DOB building violations · 2

  • Construction other optional

    Ftc w/commissioner's order#348218(050825pi20405sb)dated 05/08/25 requiring owner to start bldg repairs under permit. as of 06/26/25 there are no jobs filed in bis or dobnow to repair bldg. immed comply w/commissioner's order#348218(050825pi20405sb)to repair the bldg under permit

    Jun 26, 2025

    Dob violation - dismissed
  • Construction other optional

    Ftm bldg in a code compliant manner. obsvd @ exp1 deteriorated/bowing lintels & missing mortar joints. @ exp3 obsvd cracked stucco @ mult locations. owner to immed retain nyspe to eval the entire bldg roof incl to determine the struct stab & prepare/file repair dwgs.bldg t/be repaired under permit starting june 12 2025&compl/signed of by 6/12/25

    May 8, 2025

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Residence converted from a 2 to 4 family nfp dwelling. noted: at bsmt - 2 addl't class 'a' apts were observed created & occupied front & rear: each with a 3 pc bthrm; kitchen with residential sink, gas stove at

    Sep 18, 2025 · Penalty $50,000

    Active
  • Class - 1

    W/o a permit. noted: at bsmt - water & waste lines installed for (2) 3 pc bthrms (toilet, sink, shower, tub); 2 residential sinks at kitchen area's. gas line installed for stove at front., obtain permit

    Sep 18, 2025 · Penalty $2,500

    Active
  • Class - 1

    W/o a permit. noted: at bsmt - electrical wiring installed: 220v line for stove outlet at front; 110v lines installed in an unsafe condition for addl't lights, outlets, switches., obtain permit

    Sep 18, 2025 · Penalty $1,600

    Active
  • Class - 2

    W/o a permit. noted: at bsmt - full height partition walls erected at various locations: to sub-divide level front & rear; to create 2 bthrms, closets, kitchen area, 3 bdrms., obtain all permits

    Sep 18, 2025 · Penalty $1,250

    Active

Complaints

  • Electric

    Lighting

    Jun 19, 2012 · Apt BLDG

    Close
  • Plumbing

    Water-leaks

    Oct 2, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Oct 2, 2010 · Apt 2

    Close
  • Electric

    Lighting

    Oct 2, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Oct 2, 2010 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Oct 2, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 29, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 29, 2010 · Apt 2

    Close
  • Plumbing

    Water-leaks

    Sep 29, 2010 · Apt 2

    Close
  • Heating

    Heat related

    Nov 19, 2006 · Apt 1

    Close
Show 6 more ↓
  • Electric

    Wiring

    Nov 19, 2006 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Aug 2, 2006 · Apt 1

    Close
  • Electric

    Wiring

    Aug 2, 2006 · Apt 1

    Close
  • General

    Mold

    Aug 2, 2006 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Aug 2, 2006 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 2, 2006 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B1)
Year built
1920
Floors
2
Residential units
2
Building area
4,095 ft²
Lot area
2,068 ft²
Zoning
R8
Community board
204
Council district
15
Block / lot
2794 / 39
Assessed value
$55,500
Landmark / historic district
No

Questions about 1688 Morris Avenue

Who owns 1688 Morris Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Martinez, Hector L.

Does 1688 Morris Avenue have violations?

Yes. NYC HPD has recorded 5 housing violations at this property.

Is 1688 Morris Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1688 Morris Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 1688 Morris Avenue?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.