Violations at 1701 Weeks Avenue
Bronx, NY 10457 · BBL 2-02793-0028 · Back to the property
HPD housing violations
No HPD violations on record
DOB building violations
35 DOB violations, newest first.
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 30, 1994
Dob violation - dismissed
ECB violations
The newest 50 of 64 ECB violations. The city keeps the complete history.
- Class - 2
Failure to maintain building in code-compliant manner. use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: on 5th flr-rm #504 has kick-stop on classroom door. remedy: provide legal hardwar
Apr 2, 2026 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code-compliant manner. noted: interiorfire-proof doors do not self-close properly at 5th flr-staircase "b". 3rd flr-staircase "b", "d". 2nd flr-staircase "d", classroom doors do
Apr 2, 2026 · Penalty $1,250
Active - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. at time of inspection, job permitted under job # x01077789-i1-sh issued on 9/4/25 expires on
Dec 2, 2025
Resolve - Class - 2
Exit door not self-closing properly at the time of inspection when tested at the time of inspection observed and noted at 2nd floor auditorium 2 exit door, 1st fl main entrance 2 exit doors, at 1st floor cafete
May 22, 2025 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner. illumination for exits, exit discharges and public corridors per bc 1006.1; 27-381. at the time of inspection observed and noted 1st at right side play yar
May 22, 2025 · Penalty $1,250
Resolve - Class - 1
Work without a permit: workers were erecting overhead protection at exposure 2 due an immediate emergency condition of exterior masonry, obtain permit
Jun 12, 2024
Resolve - Class - 2
Re-issue #35553637p exit door not self-closing.noted:observed at 1st fl exit 2/stair 'b' & exit 3/stair 'c' & exit 8/stair 'h' 3rd fl exit 2/stair 'b' & exit 3/stair 'c' doors not working properly due to defect
Mar 23, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue35495201l noted:exit door@gym entrance not working properly.repair &/or replace.
Mar 3, 2021 · Penalty $1,562
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at mini school boys & girls bathroom doors do not close property due to defective hardware. remedy: repair/replace door.
May 20, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. illumination for exits,exit discharges & public corridors per bc 1006.1;27-381. noted: atmini school,5 emergency exit lighting in operative. remedy: repair/rep
May 20, 2020 · Penalty $625
Resolve - Class - 2
Exit door not self closing. noted: exit door at ecxit 8 stair h in front of gym entrance do not close due to defective hsrdware. remedy: repair/replace door.
May 20, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. noted: at 1st fl,inter door at main entrance & exit 2 stair b door do not close properly due to defective hardware. remedy: repair/replace door.
May 20, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3; 27-345. note: at cellar in electrical room fire stopping missing in various areas. remedy: provide/maintain fire stopping
Mar 19, 2019
Resolve - Class - 2
Failure to maintain building in code-compliant manner:lack of emergency lighting for exits,exit discharges and public corridors per bc 1006.1;27-542. note:emergency lights at the rear of auditorium main exits.
Mar 19, 2019
Resolve - Class - 2
Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). note: kick stops installed on doors# 514,504,311 and 309. remedy: provide legal hardware
Mar 19, 2019
Resolve - Class - 2
Reissue: 35093938y failure to maintain bldg in code-compliant manner.note interior pool steel framing rusting at skylight. rmdy:comply withnotice of violation.
Mar 23, 2017 · Penalty $2,500
Resolve - Class - 2
Failure to maintain building in code-compliant manner. note: at 1st story stair 'b' between exits 2 and 3 door missing glazing panels. rem:repair defect noted.
Sep 29, 2015
Resolve - Class - 2
Exit doors not self-closing.note:at 1st story exit 8 discharge door, at 2nd story auditorium exit doors at front and rear. at 5th story stair 'd' and stair 'e'. rem:repair and/or replace doors notes.
Sep 29, 2015
Resolve - Class - 2
Racked doors. double doors near room #7. single door #5. single door near room 14. double doors near room 19. remedy: maintain all doors as per code.
Apr 28, 2014
Resolve - Class - 2
Oil tank room -missing fire proofing on columns & beams. remedy: maintain all fire proofing as per code.
Apr 28, 2014
Resolve - Class - 3
Corridor ceiling decorations. 4th floor, 3rd floor, 2nd floor. remedy: remove all ceiling decoration.
Apr 25, 2014
Resolve - Class - 2
Interior pool steel framing rusting at skylight. remedy: maintain pool area as per code.
Apr 25, 2014
Resolve - Class - 2
Spalling of walls & ceilings throughout in rooms: 511,510,509,508,507,413,412,411,410,409,408,313,311,310,309,212,213, rear auditorium c-08a. remedy: maintain bldg as per code.
Apr 25, 2014
Resolve - Class - 2
Re-issue # 34986631l. exterior mortar joints & masonry. bands deteriorating at roof parapet (outside court yard), bands facing east 174 st at the 4th & 5th floors, cracked bands on weeks st 4th & 5th floors.
Apr 25, 2014
Resolve - Class - 2
Re-issue # 34987114h. bricks spalling & mortar joints deteriorated at various locations throughout the facade. remedy: maintain facade as per code.
Apr 25, 2014
Resolve - Class - 2
Reissue: #34987114h. exterior mortar joints is deteriorating at the roof parapet (outside courtyard) facing east 174 st. remedy: replace missing mortar.
Apr 3, 2013
Resolve - Class - 2
Reissue #34987116l. exit doors are self-closing located @stair b,c,f,g @3rd fl lvl & 4th fl lvl. remedy: repair and/or replace doors.
Apr 3, 2013
Resolve - Class - 2
Doors not closing at: 3rd story stair b,c,f & g at: 4th story stair b,c,f & g at: 5th story stair b,c,f & g. remedy: repair &/or replace doors noted.
Jul 11, 2012
Resolve - Class - 2
Re-issue #34934227p plaster ceiling spalling at 5th story room #521. remedy: repair defect noted.
Jul 11, 2012
Resolve - Class - 2
Bricks spalling & mortar joints deteriorated. at various loccations throughout facade. remedy: repair defects noted.
Jul 11, 2012
Resolve - Class - 2
Interior wooden flr has buckled causing a tripping hazard in rm 407 onthe 4th flr level. remedy: repair/replace wooden flr.
Sep 1, 2011
Resolve - Class - 2
Reissue: 34856021z. the plaster on the ceiling is spalling located in rm 521 on the 5th flr level. remedy: repair/replace plaster on ceiling.
Sep 1, 2011
Resolve - Class - 2
Interior plaster on the ceiling is spalling located in room 521 on the 5th fl level remedy: repair / replace plaster on ceiling
Jun 23, 2010
Resolve - Class - 3
Failure to maintain bldg in code compliant manner note:defective jammong exit doors & frames not opening closing properly locations 4th fl exit 2/3 2 doors 1st fl exit 6/7 to street 3 vestible doors remedy:repl
Feb 10, 2009
Resolve - Class - 3
Reissue #34607506j failure to maintain bldg in code compliant manner note:water leaking into boys locker rm from radiator pipes in suspended ceiling remedy:repair leak maintain bldg
Feb 10, 2009
Resolve - Non-hazardous
Exterior brick wall has become(porous) and allowing rain water to enter the bldg causing interior damages in rooms 411,417,419,513 & 515 andstairway d & e on 3,4, 5th flrs. remedy: water proof exterior facade.
Mar 12, 2008
Resolve - Non-hazardous
Interior plaster is spalling and cracked located at rooms 411,417,419 on the 4th flr room 513,515 on the 5th flr, all staircase on 2nd through the 5th flr. remedy: repair all damaged plaster.
Mar 12, 2008
Resolve - Non-hazardous
Classroom door is missing a door closer located at room 514 on the 5th flr. remedy: replace missing door closer.
Mar 12, 2008
Resolve - Non-hazardous
Reissue: 34607504x the gas meter does not have fresh-air intake on cellar level. remedy: supply fresh air intake.
Mar 12, 2008
Resolve - Hazardous
Exit doors not self closing.vestibule doors (2 sets of 2) on each end of the corridor are racked & do not close properly.remedy;repair/repl ace doors
Sep 10, 2007
Resolve - Hazardous
Reissue #34508766m failure to maintain interior water leaking from pipes in boys pool locker room causing water to puddle on the floor.remedy:repair pipes
Sep 10, 2007
Resolve - Hazardous
Sec-27-392 floor numbering signs numerous areas have no floor or stairway indentification.remedy:install floor & stairway indentification signs.
Sep 10, 2007
Resolve - Hazardous
Failure to maintain interior gas meter room has no light or ventilation.remedy install light and fresh air ventalation.
Sep 10, 2007
Resolve - Hazardous
Exit doors not self closing-1st fl gym vestibule stairway 4-door rackedstair way b 1door racked 4th fl stairway f 1 door racked, stairway g 1 door racked,stairway b 1 door closer broken stairway c 1 door closer
Sep 10, 2007
Resolve - Hazardous
Noted: waster is leaking from pipes at basement in boiler room & boys locker room. remedy: repair pipes (water)
Mar 22, 2006
Resolve - Hazardous
Re-issue vio# 34466452 z. noted:basement exit j vestibule doors are missing at two places. remedy: install doors.
Mar 21, 2006
Resolve - Non-hazardous
Exit passageway or corridor required width decreased by obstruction noted:corridors on all floors occupied by classes outside of each classroom from end to end. also blocking access to stairwells. remedy:remove
Feb 3, 2005
Resolve - Non-hazardous
Failure to maintain building. defects noted: basement exit j vestibuletwo doors missing at two places. remedy: maintain building. install doors as per bldg. code.
Feb 3, 2005
Resolve - Non-hazardous
Failure to maintain defect roof leaking causing damage to ceiling walls roof is worn deteriating location minischool entry remedy: make all necessary repairs or provide new roof
Feb 25, 2003
Resolve - Non-hazardous
Reissue failure to maintain defect roof leaks causing plaster to spall bldg location 2 sub roofs at 1st fl main roof thruout 5 th fl classrms remedy: make all necessary repair
Feb 25, 2003
Resolve