roofy

305 East 170 Street

Bronx, NY 10456BBL 2-02784-0038Map

Owner of record: 170th Street Properties LLC

305 East 170 Street is a mixed residential and retail building built in 1925 in Bronx, 10456. It has 5 residential units across 3 floors. The owner of record is 170th Street Properties LLC. HPD has recorded 248 housing violations here, most recently on May 21, 2026. 20 of the 50 most recent violations are still open.

HPD violations
248
DOB violations
3
ECB violations
1
HPD complaints
147

What to know

Concern
12 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation May 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 248

  • C

    Remove device preventing door from being self-closing consisting of a combination lock box attached to handle at front entrance door to building

    May 21, 2026

    Open — Not complied with
  • A

    Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall, east wall, west wall, 2nd window frame from east at south wall, 1st window frame from east at south wall in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 4th room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall, west wall, 2nd window frame from east at south wall, 1st window frame from east at south wall in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 6, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective door at vestibule , 1st story

    May 6, 2026

    Closed — Violation closed
Show 40 more ↓
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story

    May 1, 2026

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Open — Defect letter issued
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective silicone caulking around the wash basin (sink) in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective warped wooden base cabinet in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective door frame in the 4th room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective door frame in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Open — Defect letter issued
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder tack welded, secure using the appropriate nuts and bolts at south wall fire escape, building's front at fire escape

    May 1, 2026

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective lockset at door in the 4th room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective south wall electrical outlet in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door (from vestibule to public hall) , 1st story

    May 1, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 1, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective hinges at entry door in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective spring balance at lower sash, at 2nd window from east at south wall in the 3rd room from north located at apt 3b, 3rd story, 1st apartment from west at north

    May 1, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing lifting metal saddle, preventing door from self closing at door from vestibule to 1st sty at public hall, 1st story

    Mar 1, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective metal saddle at vestibule door

    Jan 21, 2026

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of garbage cans at building entrance door , 1st story

    Aug 10, 2025

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective cylinder deadbolt lock at door in the entrance located at apt 1, 1st story, 1st apartment from west at north

    May 24, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective vinyl floor tile in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    May 24, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    May 24, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door

    May 24, 2025

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 1st room from north at west located at apt 1, 1st story, 1st apartment from north at east

    Apr 14, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Mar 17, 2025 · Apt 2B

    Closed — Violation closed
  • B

    Refit closet door in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north

    Mar 17, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north

    Mar 17, 2025 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Mar 17, 2025 · Apt 2B

    Open — Not complied with
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall, north wall, south wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Feb 28, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective ceramic wall tiles at north and east walls at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the foyer in the entrance located at apt 1, 1st story, 1st apartment from west at north

    Feb 26, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Open — First no access to re- inspect violation
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate ... in the 1st room from north at west located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north

    Jan 13, 2025 · Apt 1

    Closed — Violation dismissed

DOB building violations · 3

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Jul 13, 1994

    Vp*-violation unserved ecb- dismissed

ECB violations · 1

  • Class - 2

    Work w/o a permit. at time of inspection noted new store front installed. new electrical wiring outlets,switches and ceiling lights. new sheetrock installed on walls and ceiling in bathroom w/ new electrical wi

    Mar 20, 2019

    Resolve

Complaints

  • General

    Cabinet

    Oct 5, 2026 · Apt 3B

    Close
  • Water leak

    Heavy flow

    Oct 5, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Oct 5, 2026 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    May 19, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 19, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    May 15, 2026 · Apt 1

    Close
  • Water leak

    Heavy flow

    May 15, 2026 · Apt 1

    Close
  • Electric

    Outlet/switch

    Apr 20, 2026 · Apt 3B

    Close
  • Door/window

    Door

    Apr 20, 2026 · Apt 3B

    Close
  • Door/window

    Door frame

    Apr 20, 2026 · Apt 3B

    Close
Show 40 more ↓
  • Unsanitary condition

    Mold

    Apr 20, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Apr 20, 2026 · Apt 3B

    Close
  • Door/window

    Window frame

    Apr 20, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Apr 20, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Apr 20, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Mar 5, 2026 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Mar 5, 2026 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Mar 5, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Mar 5, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Mar 5, 2026 · Apt 3B

    Close
  • Flooring/stairs

    Floor

    Jan 15, 2026 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Jan 15, 2026 · Apt 3B

    Close
  • Paint/plaster

    Wall

    Jan 15, 2026 · Apt 3B

    Close
  • Plumbing

    Basin/sink

    Jan 15, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Jan 15, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    Jan 15, 2026 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Aug 9, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jul 29, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jul 29, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jun 23, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 23, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    May 27, 2025 · Apt 3A

    Close
  • Door/window

    Window frame

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    May 27, 2025 · Apt 3A

    Close
  • Plumbing

    Water supply

    May 27, 2025 · Apt 3A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Apr 13, 2025 · Apt 1

    Close
  • Paint/plaster

    Wall

    Apr 13, 2025 · Apt 1

    Close
  • Flooring/stairs

    Floor

    Jan 11, 2025 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Jan 11, 2025 · Apt 1

    Close
  • Plumbing

    Toilet

    Jan 11, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Jan 11, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Jan 11, 2025 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Jan 11, 2025 · Apt 1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    May 20, 2024 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1925
Floors
3
Residential units
5
Building area
5,250 ft²
Lot area
2,270 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2784 / 38
Assessed value
$480,600
Landmark / historic district
No

HPD registration #209777, last renewed Aug 24, 2025.

Questions about 305 East 170 Street

Who owns 305 East 170 Street?

The owner of record in NYC Department of City Planning PLUTO data is 170th Street Properties LLC.

Does 305 East 170 Street have violations?

Yes. NYC HPD has recorded 248 housing violations at this property.

Is 305 East 170 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 305 East 170 Street built?

City records list 1925 as the year it was built.

How many apartments are in 305 East 170 Street?

It has 5 residential units and 6 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.