632 Faile Street
Bronx, NY 10474BBL 2-02766-0133Map
Owner of record: 632 Faile Street LLC
632 Faile Street is a two-family home built in 1915 in Bronx, 10474. It has 2 residential units across 2 floors. The owner of record is 632 Faile Street LLC. HPD has recorded 70 housing violations here, most recently on September 22, 2025. 27 of the 50 most recent violations are still open.
- HPD violations
- 70
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 54
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 70
- BHazardous
Properly repair with similar material the broken or defective metal cornice at building front , 2nd story
Sep 22, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the furniture household items court
Aug 17, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metalcornice at building front
Aug 17, 2025
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at vestibule at ceiling at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and its assembles at building entrance door at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of live flies at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 17, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 17, 2025
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch building entrance door, court to vestibule at public hall, 1st story
Aug 17, 2025
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Aug 17, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents ... rats in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 28, 2023 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the nuisance consisting of uncapped gas line at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Feb 28, 2023 · Apt 2
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 5th room from east located at apt 2, 2nd story, 1st apartment from north at east
Nov 14, 2022 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Feb 2, 2022 · Apt 1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 7th room from east at south located at apt 2, 1st story, 2nd apartment from north at east
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Oct 8, 2021 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 7th room from east at south, the kitchen located at apt 2, 1st story, 2nd apartment from north at east
Oct 8, 2021 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Oct 14, 2020 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective facucet handle at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east
Oct 14, 2020 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Oct 14, 2020 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 7th room from east located at apt 2, 2nd story, 1st apartment from north at east
Oct 14, 2020 · Apt 2
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2, 2nd story, 1st apartment from north at east
Oct 14, 2020 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 11, 2019
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of scalding hot water exceed 130f (found 166f) in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 7, 2019 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east
Feb 7, 2019 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective ligth fixture at ceiling in the 3rd room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Apr 17, 2018 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the missing outlet covers at east wall in the 2nd room from north located at apt 2, 2nd story, 1st apartment from west at north
Apr 17, 2018 · Apt 2
Open — Nov sent out - BHazardous
Properly repair the broken or defective outlet at east wall in the kitchen located at apt 2, 2nd story, 1st apartment from west at north
Apr 17, 2018 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from west at north
Apr 17, 2018 · Apt 2
Open — Nov sent out - BHazardous
Replace with new the broken or defective lower sash glass window in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from west at north
Apr 17, 2018 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of mice located at apt 2, 2nd story, 2nd apartment from east at south
Apr 5, 2017 · Apt 2
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rat in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Aug 20, 2015 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the 7th room from east at north located at apt 2, 2nd story
Aug 13, 2015 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 2, 2nd story
Aug 13, 2015 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color ceiling in the bathroom located at apt 2, 2nd story
Aug 13, 2015 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Refit lower sash window in the 1st room from east located at apt 2, 2nd story
Aug 13, 2015 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective door leading to scuttle ladder in the private hallway located at apt 2, 2nd story
Aug 13, 2015 · Apt 2
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Pests
Aug 2, 2025 · Apt 2FL
Close - Safety
Fire escape
Aug 2, 2025 · Apt 2FL
Close - Unsanitary condition
Mold
Aug 2, 2025 · Apt 2FL
Close - Door/window
Door
Aug 2, 2025 · Apt 2FL
Close - Unsanitary condition
Pests
Aug 2, 2025 · Apt 2FL
Close - Unsanitary condition
Pests
Aug 2, 2025 · Apt 2FL
Close - Safety
Carbon monoxide detector
Aug 2, 2025 · Apt 2FL
Close - Unsanitary condition
Garbage/recycling storage
Jul 29, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Feb 22, 2023 · Apt 2
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 2
Close
Show 40 more ↓
- Unsanitary condition
Pests
Nov 5, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Jan 28, 2022 · Apt 1
Close - Heat/hot water
Apartment only
Jan 16, 2022 · Apt 1
Close - Water leak
Heavy flow
Sep 1, 2021 · Apt 2
Close - Paint/plaster
Ceiling
Jan 8, 2021 · Apt 2
Close - Door/window
Door
Jan 8, 2021 · Apt 2
Close - Water leak
Slow leak
Jan 8, 2021 · Apt 2
Close - Paint/plaster
Ceiling
Jan 8, 2021 · Apt 2
Close - Plumbing
Bathtub/shower
Jan 8, 2021 · Apt 2
Close - Unsanitary condition
Pests
Nov 13, 2020 · Apt 2
Close - Plumbing
Bathtub/shower
Nov 13, 2020 · Apt 2
Close - Water leak
Heavy flow
Nov 13, 2020 · Apt 2
Close - Water leak
Slow leak
Oct 10, 2020 · Apt 2
Close - Plumbing
Bathtub/shower
Oct 10, 2020 · Apt 2
Close - Safety
Carbon monoxide detector
Oct 10, 2020 · Apt 2
Close - Paint/plaster
Ceiling
Oct 10, 2020 · Apt 2
Close - Unsanitary condition
Pests
Oct 10, 2020 · Apt 2
Close - Heat/hot water
Apartment only
Feb 1, 2019 · Apt 2
Close - Heat/hot water
Apartment only
Jan 22, 2019 · Apt 2
Close - Unsanitary condition
Pests
Sep 23, 2016 · Apt 2
Close - Plumbing
Water supply
May 15, 2015 · Apt 2
Close - Unsanitary condition
Pests
May 14, 2015 · Apt 1
Close - Water leak
Slow leak
May 14, 2015 · Apt 1
Close - Plumbing
Water supply
May 14, 2015 · Apt 1
Close - Paint/plaster
Wall
May 14, 2015 · Apt 1
Close - Plumbing
Bathtub/shower
May 14, 2015 · Apt 1
Close - Plumbing
Water supply
May 14, 2015 · Apt 1
Close - Plumbing
Radiator
Apr 19, 2015 · Apt 1
Close - Unsanitary condition
Pests
Apr 19, 2015 · Apt 1
Close - Unsanitary condition
Pests
Apr 19, 2015 · Apt 1
Close - Paint/plaster
Ceiling
Apr 19, 2015 · Apt 1
Close - Paint/plaster
Ceiling
Apr 19, 2015 · Apt 1
Close - Paint/plaster
Wall
Apr 19, 2015 · Apt 1
Close - Unsanitary condition
Pests
Apr 19, 2015 · Apt 1
Close - Plumbing
Bathtub/shower
Apr 19, 2015 · Apt 1
Close - Plumbing
Water supply
Apr 19, 2015 · Apt 1
Close - Heat/hot water
Entire building
Apr 19, 2015 · Apt 1
Close - Heat/hot water
Entire building
Nov 16, 2014 · Apt 2
Close - Nonconst
Vermin
May 16, 2009 · Apt 1
Close - General
Windows
May 16, 2009 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1915
- Floors
- 2
- Residential units
- 2
- Building area
- 2,480 ft²
- Lot area
- 2,067 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2766 / 133
- Assessed value
- $53,520
- Landmark / historic district
- No
HPD registration #713491, last renewed Oct 6, 2025.
Questions about 632 Faile Street
Who owns 632 Faile Street?
The owner of record in NYC Department of City Planning PLUTO data is 632 Faile Street LLC.
Does 632 Faile Street have violations?
Yes. NYC HPD has recorded 70 housing violations at this property.
Is 632 Faile Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 632 Faile Street built?
City records list 1915 as the year it was built.
How many apartments are in 632 Faile Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.