1275 Lafayette Avenue
Bronx, NY 10474BBL 2-02740-0039Map
Owner of record: New 1275 Lafayette
1275 Lafayette Avenue is a walk-up apartment building built in 1925 in Bronx, 10474. It has 40 residential units across 5 floors. The owner of record is New 1275 Lafayette. HPD has recorded 1,366 housing violations here, most recently on September 26, 2026. 45 of the 50 most recent violations are still open.
- HPD violations
- 1,366
- DOB violations
- 12
- ECB violations
- 15
- HPD complaints
- 2,345
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,366
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, ceiling, south wall, west wall in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, baseboard at south wall, 1st door frame from north at east wall, 1st door frame from west at north wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at west wall, west wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the bathroom located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, 1st window frame from east at south wall in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the kitchen located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall, baseboard at east wall, baseboard at west wall, 1st window frame from west at north wall, 1st door frame from north at east wall, baseboard at north wall, baseboard at south wall in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from west at north , section ''east''
Sep 26, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the private hallway located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at south wall in the bathroom located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the foyer located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, east wall in the foyer located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 3rd room from east at south located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at north wall, 1st door frame from west at north wall in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, north wall, south wall in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door frame, south wall in the private hallway located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, north wall in the private hallway located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at 1st window from south at west in the bathroom located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective 1st window frame ( jamb) from north at east in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from east at south located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock at 1st window ( fire escape) from south at west in the 3rd room from east at south located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the kitchen located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall, baseboard at east wall, baseboard at west wall, west wall, north wall in the 3rd room from east at south located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, 1st window frame from east at south wall in the kitchen located at apt 3e, 3rd story, 1st apartment from south at west , section ''north''
Aug 23, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 30, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch court
Jun 30, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assembily court
Jun 30, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall in the foyer located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north at west located at apt 3e, 3rd story, 1st apartment from west at north , section at east
Apr 10, 2026 · Apt 3E
Closed — Violation closed
DOB building violations · 12
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Construction other optional
C-construction other optional
Mar 11, 2019
Dob violation - active - Construction other optional
C-construction other optional
Mar 11, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 18, 2014
Dob violation - dismissed - Construction other optional
@time of inspection, loose brick @fl4 of exp#4 wall. mortar cracks @n& s end of exp#4 wall. step cracking of brick wall@ exp#2 wall
Mar 21, 2014
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Mar 21, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2011
Dob violation - dismissed
Show 2 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 15
- Class - 1
Noted at time of inspection observed multiple cracks over doorways and celling of apartment 3e in living room area and kitchen area, repair and/replace
Sep 21, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain building in code compliant manner. at time of inspection observed at apartment 2h minor cracks over doorways and ceilings, windows. also slopping floors., repair and/or replace
Oct 20, 2024 · Penalty $625
Active - Class - 2
Work w/o permit.note:at time of inspection of above premises observed on roof level new antenna installation,new exterior cabinet on bulkhead & new sectors of antennas on roof.as per dob no permits on file.work
Apr 6, 2023 · Penalty $625
Resolve - Class - 2
Found boiler drain in rear of boiler is leaking. need air gap and discharge pipe for back flow preventer.
Mar 5, 2021 · Penalty $3,125
Active - Class - 2
Work w/o a permit:at time of inspection,observed 4 condensers at exp 2wall installed. and wired protruding at said wall into building. as per dob records,no permits on file for this scope of electrical work. re
Dec 28, 2019 · Penalty $6,250
Active - Class - 2
Failure to maintain bld in a code compliant manner-at time of inspection,observe exhaust fan at exp 2 approx 1' from fire escape drop ladder. and approx 1' from 1st fl bedroom window. this condition is non comp
Dec 28, 2019 · Penalty $3,125
Active - Class - 2
Work w/out a permit noted:advertising business sign attached to the bldg w/out a permit.1-sign reads deli grocery size 2.5 x 44' ft approx 2-sign reads boost (moblie) size 3 by 20 ft approx 3-de cache barbersho
Apr 29, 2018 · Penalty $6,250
Active - Class - 3
Work w/out a permit. noted: @ flr 3 apt#d, erected full height partition wall w/ door creating an additional room in the living room. partition wall approx 10' x 9'. no permit on file. rem: obtain permit or res
Jul 28, 2016 · Penalty $250
Resolve - Class - 1
Work w/o a permit.noted:at 5th story apt 5f,corner apt,south east section of bldg,erected full height partitions and subdivided room.rem:restore premises to prior legal condition.
Mar 21, 2014 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner defect noted:at exposure 4,along hunts point ave,east side ext brick wall,bricks dislodging,and bowing out at 3rd story,apt 3f,window to the left of bathroom an
Mar 21, 2014 · Penalty $2,500
Resolve
Show 5 more ↓
- Class - 1
28.301.1/1b154/3b-51/28b/15/16/32a/34b/50/50a/cease use/50ab/50c/51-boiler sealed due to water in chamber and making fumes when boiler is operating coming out of flue pipe.repair immediately!then call for reins
Apr 26, 2011 · Penalty $5,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: at 3rd & 4th sty of ne tower exit passageway obstructed by various objects severelyaffecting the life & safety of public & property. remedy: remove
Mar 24, 2010 · Penalty $1,200
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner. noted: at ne tower,5th sty water damaged ceilings in various locations throughout severely affecting the life health & safety of public & property. remedy:
Mar 24, 2010 · Penalty $1,000
Resolve - Class - 2
Illegal use in a commercial district c1-4 (local retail district) noted operated auto parts (new & used) & auto glass business at 1st fl of bldg occupancy group 7 which is not permitted group use in c1-4
Dec 22, 2008 · Penalty $800
Resolve - Hazardous
Work w/o a permit-hazardous-work noted:at interior of premises at 1st floor area apt 1b major renovation in progress:at kitchen area major demolition removed all partitions.ceiling electrical wire,floor,plumbin
Oct 22, 2003 · Penalty $800
Resolve
Complaints
- Paint/plaster
Wall
Oct 19, 2026 · Apt 3A
Open - Appliance
Electric/gas range
Oct 19, 2026 · Apt 3A
Open - General
Cabinet
Oct 19, 2026 · Apt 3A
Open - Paint/plaster
Ceiling
Sep 23, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 23, 2026 · Apt 3E
Close - Door/window
Door
Sep 23, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Sep 23, 2026 · Apt 3E
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 3E
Close - Unsanitary condition
Mold
Sep 23, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Sep 22, 2026 · Apt 4I
Open
Show 40 more ↓
- Unsanitary condition
Pests
Sep 22, 2026 · Apt 4I
Open - Paint/plaster
Ceiling
Aug 18, 2026 · Apt 3E
Close - Paint/plaster
Radiator
Aug 18, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Aug 18, 2026 · Apt 3E
Close - Door/window
Door frame
Aug 18, 2026 · Apt 3E
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 3E
Close - Appliance
Refrigerator
Aug 18, 2026 · Apt 3E
Close - Door/window
Window frame
Aug 18, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Aug 18, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Aug 3, 2026 · Apt 3E
Close - Appliance
Refrigerator
Aug 3, 2026 · Apt 3E
Close - Door/window
Window frame
Aug 3, 2026 · Apt 3E
Close - Door/window
Window frame
Aug 3, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 3E
Close - Paint/plaster
Wall
Aug 3, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Aug 3, 2026 · Apt 3E
Close - Plumbing
Bathtub/shower
Jul 27, 2026 · Apt 2F
Close - Plumbing
Bathtub/shower
Jul 27, 2026 · Apt 2F
Close - Plumbing
Bathtub/shower
Jul 24, 2026 · Apt 4I
Close - Unsanitary condition
Pests
Jul 24, 2026 · Apt 4I
Close - Unsanitary condition
Pests
Jul 24, 2026 · Apt 4I
Close - Heat/hot water
Apartment only
Jul 4, 2026 · Apt 5I
Close - Door/window
Door
Jun 25, 2026 · Apt 5I
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2026 · Apt 5I
Close - Appliance
Refrigerator
Jun 12, 2026 · Apt APT3E
Close - Flooring/stairs
Floor
Jun 12, 2026 · Apt APT3E
Close - Paint/plaster
Wall
Jun 12, 2026 · Apt APT3E
Close - Paint/plaster
Ceiling
Jun 12, 2026 · Apt APT3E
Close - Door/window
Window frame
Jun 12, 2026 · Apt APT3E
Close - Plumbing
Toilet
Jun 12, 2026 · Apt APT3E
Close - Heat/hot water
Entire building
Apr 6, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Mar 31, 2026 · Apt 3E
Close - Paint/plaster
Wall
Mar 31, 2026 · Apt 3E
Close - Paint/plaster
Wall
Mar 31, 2026 · Apt 3E
Close - Door/window
Window frame
Mar 10, 2026 · Apt 3E
Close - Paint/plaster
Wall
Mar 10, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Mar 10, 2026 · Apt 3E
Close - Door/window
Window frame
Mar 10, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Mar 10, 2026 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 5
- Residential units
- 40
- Building area
- 32,580 ft²
- Lot area
- 8,352 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2740 / 39
- Assessed value
- $1,402,650
- Landmark / historic district
- No
HPD registration #204340, last renewed Oct 8, 2025.
Questions about 1275 Lafayette Avenue
Who owns 1275 Lafayette Avenue?
The owner of record in NYC Department of City Planning PLUTO data is New 1275 Lafayette.
Does 1275 Lafayette Avenue have violations?
Yes. NYC HPD has recorded 1,366 housing violations at this property.
Is 1275 Lafayette Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1275 Lafayette Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 1275 Lafayette Avenue?
It has 40 residential units and 44 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.