919 Bruckner Boulevard
Bronx, NY 10459BBL 2-02733-0026Map
Owner of record: 919 Bruckner Blvd LLC
919 Bruckner Boulevard is a walk-up apartment building built in 1901 in Bronx, 10459. It has 3 residential units across 3 floors. The owner of record is 919 Bruckner Blvd LLC. HPD has recorded 181 housing violations here, most recently on September 25, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 181
- DOB violations
- 0
- ECB violations
- 2
- HPD complaints
- 247
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 181
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling north east south and south wall at basement
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at public hall
Sep 25, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective mesh wired skylight glass , 3rd story
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof hatch , 3rd story
Sep 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch roof door hatch , 3rd story
Sep 25, 2026
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the the floors staircase and all wall at all storys at public hall
Sep 25, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage can recycle stored at basement
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at boiler room
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective fire rated door at rear building leading to basement at basement
Sep 25, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of garbage cans at fire passage way
Sep 25, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Provide adequate lighting at all wall outlets and ceiling electrical fixtures at basement
Sep 25, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the mattress and chairs at rear yard
Sep 25, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door , 3rd story
Jun 29, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of house hold items at bulkhead , 3rd story
Jun 29, 2026
Open — Nov sent out - CImmediately hazardous
Remove all obstructions from water closet toilet bowl in the bathroom located at apt 3, 3rd story, 1st apartment from south at west
Jun 29, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Jun 1, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Jun 1, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 3, 3rd story, 1st apartment from south at west
Jun 1, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sinking, wood tread,1st from bottem up, 1st story public hall stairs, leading to intermediate landing at public hall stairs, 1st story
Jun 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of black bags (construction material) at north wall at public hall, 1st story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Jun 1, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags at east yard
Jun 1, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 1, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge (closure arm) at door (leading to 1st story from vestibule) at public hall, 1st story
Jun 1, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at building front , 1st story
Apr 28, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Apr 28, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 8, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Feb 8, 2026 · Apt 3
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Feb 8, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Feb 8, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 8, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west
Feb 8, 2026 · Apt 3
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall south wall and ceiling ceiling in the 4th room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door jamb and casing at south wall in the 4th room from east at north located at apt 1, 1st story, 1st apartment from south at west
Jan 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Remove all obstructions and repair all defects in at wasteline at washbasin in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak above the ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the 1st room from north at east located at apt 1, 1st story, 1st apartment from west at north original violation 18489842 issued 07-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 7, 2025 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in at wasteline at bathtub in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Dec 7, 2025 · Apt 1
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 2
- Class - 3
B354 32a.19b.15.36.50a.50b.50c.50d.50e 50a flue pipe not properly sealed to chimney 50b remove oil from boiler rm 50c no fuseable limit firedamper on fresh air intake 50d boiler rm not a storage rm 50e no check
Jul 8, 2009 · Penalty $250
Resolve - Class - 3
B301 50a.50b 50a work w/o a permit 28.145.1 50b no work permit filed w/dob for the replacement oil fired boiler weil alumin
Jul 8, 2009 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Sep 14, 2026 · Apt 1
Close - Safety
Smoke detector
Sep 14, 2026 · Apt 1
Close - Safety
Carbon monoxide detector
Sep 14, 2026 · Apt 1
Close - Plumbing
Basin/sink
Sep 14, 2026 · Apt 1
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt BLDG
Close - Outside building
Roof door/hatch
Sep 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2026 · Apt BLDG
Close - Door/window
Door
Sep 14, 2026 · Apt BLDG
Close - Door/window
Door
Sep 14, 2026 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Sep 14, 2026 · Apt BLDG
Close - Door/window
Door
Sep 14, 2026 · Apt BLDG
Close - Door/window
Door
Sep 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 14, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1
Close - Outside building
Skylight
Sep 14, 2026 · Apt BLDG
Close - Safety
Fire escape
Sep 14, 2026 · Apt BLDG
Close - Door/window
Door
Sep 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 21, 2026 · Apt BLDG
Close - Plumbing
Toilet
Jun 22, 2026 · Apt 3
Close - Unsanitary condition
Mold
May 23, 2026 · Apt 3
Close - Water leak
Heavy flow
May 23, 2026 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
May 19, 2026 · Apt BLDG
Close - Water leak
Heavy flow
May 6, 2026 · Apt 1
Close - Heat/hot water
Entire building
May 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 25, 2026 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Apr 8, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Mar 28, 2026 · Apt 1
Close - Unsanitary condition
Pests
Mar 28, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1901
- Floors
- 3
- Residential units
- 3
- Building area
- 3,814 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2733 / 26
- Assessed value
- $60,300
- Landmark / historic district
- No
HPD registration #205824, last renewed Nov 8, 2024.
Questions about 919 Bruckner Boulevard
Who owns 919 Bruckner Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 919 Bruckner Blvd LLC.
Does 919 Bruckner Boulevard have violations?
Yes. NYC HPD has recorded 181 housing violations at this property.
Is 919 Bruckner Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 919 Bruckner Boulevard built?
City records list 1901 as the year it was built.
How many apartments are in 919 Bruckner Boulevard?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.