857 Bruckner Boulevard
Bronx, NY 10459BBL 2-02732-0051Map
Owner of record: 857 Bruckner Partners LLC
857 Bruckner Boulevard is a walk-up apartment building built in 1925 in Bronx, 10459. It has 3 residential units across 3 floors. The owner of record is 857 Bruckner Partners LLC. HPD has recorded 118 housing violations here, most recently on June 16, 2026. 43 of the 50 most recent violations are still open.
- HPD violations
- 118
- DOB violations
- 4
- ECB violations
- 2
- HPD complaints
- 229
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 118
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 16, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective window frame on east wall in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 16, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 16, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 16, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
May 23, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story
May 23, 2026
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 23, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 23, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 23, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 20, 2026 · Apt 1E
Open — Notice of issuance sent to tenant
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 20, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the kitchenette located at b-room 1e, 1st story, 4th b-room from east at south
May 20, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 30sq ft at ceiling and east wall at community bathroom, 1st story
Apr 29, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall at community bathroom, 1st story
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall at community bathroom, 1st story
Apr 29, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 30sq ft at ceiling and east wall at community bathroom, 1st story original violation 18823422 issued 29-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 29, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling at community bathroom, 1st story
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at building entrance , 1st story
Apr 29, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3f, 3rd story, 1st apartment from south at west
Sep 6, 2025 · Apt 3F
Open — Nov sent out - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that missing at public hall, 1st story
Aug 8, 2025
Open — Nov sent out - BHazardous
Provide approved type wire screen under skylight at 1st public hall bulkhead from north, 3rd story
Aug 8, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing
Dec 15, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance door(not self closing)
Dec 15, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 15, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Dec 15, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing frame at public hall, 1st story
Nov 19, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Nov 19, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (from street to vestibule) at public hall, 1st story
Nov 19, 2024
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures (at range) in the kitchen located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked radiator/leaking in the 4th room from east located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl floor covering in the kitchen located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at closet in kitchen (greater than 20sq ft) (bsmt. apt.) in the kitchen located at apt bsmt, 1st apartment from south at west
Aug 2, 2024 · Apt BSMT
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and north walls (bsmt. apt.) in the 1st room from east located at apt bsmt, 1st apartment from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective mortise locking device at entrance door located at bsmt-apt bsmt, 1st bsmt-apt from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Provide provide cover for house trap (bsmt. apt.) in the kitchen located at apt bsmt, 1st apartment from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Repair the broken or defective connection wasteline pipe (bsmt. apt.) in the kitchen located at apt bsmt, 1st apartment from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant (metal) ceiling (bsmt. apt.) in the kitchen located at apt bsmt, 1st apartment from south at west
Aug 2, 2024 · Apt BSMT
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... aprox 1sq ft at east wall 1sq ft at west wall 1sq ft at south wall in the kitchen located at apt thebas, 1st apartment from south at west
Mar 6, 2023 · Apt THEBAS
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate .. in the entire apartment located at bsmt-apt thebas, 1st bsmt-apt from south at west
Mar 6, 2023 · Apt THEBAS
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... aprox 1sq ft at east wall 1sq ft at west wall 1sq ft at south wall in the kitchen located at apt thebas, 1st apartment from south at west original violation 15757536 issued 06-mar-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 6, 2023 · Apt THEBAS
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in closet in the kitchen located at apt thebas, 1st apartment from south at west
Mar 6, 2023 · Apt THEBAS
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east located at bsmt-apt thebas, 1st bsmt-apt from south at west
Mar 6, 2023 · Apt THEBAS
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt thebas, 1st apartment from south at west
Mar 6, 2023 · Apt THEBAS
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active
ECB violations · 2
- Class - 2
Oil leak at oil filter near burner-no designated sign on boiler room door; correct all violating conditions, submit a certificate of correction.
Nov 23, 2020 · Penalty $3,125
Active - Class - 3
Failure to maintain building in code compliant manner. defect noted:entrance door & vestibule door missing door knobs. rem:repair/replace.
Dec 2, 2011
Resolve
Complaints
- Water leak
Slow leak
May 31, 2026 · Apt 1E
Close - Paint/plaster
Wall
May 31, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 31, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 31, 2026 · Apt 1E
Close - Door/window
Window frame
May 28, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 1E
Close - Safety
Window guard broken/missing
May 20, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 20, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 20, 2026 · Apt 1E
Close
Show 40 more ↓
- Paint/plaster
Wall
May 20, 2026 · Apt 1E
Close - Safety
Window guard broken/missing
May 18, 2026 · Apt 1E
Close - Unsanitary condition
Pests
May 18, 2026 · Apt 1E
Close - Electric
No lighting
Mar 1, 2026 · Apt 1B
Close - Door/window
Door
Mar 1, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Mar 1, 2026 · Apt 1B
Close - Water leak
Heavy flow
Mar 1, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Aug 29, 2025 · Apt 3F
Close - Door/window
Window pane
Aug 29, 2025 · Apt 3F
Close - Unsanitary condition
Mold
Aug 27, 2025 · Apt 3F
Close - Door/window
Window pane
Aug 27, 2025 · Apt 3F
Close - Unsanitary condition
Mold
Jun 28, 2025 · Apt 3F
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt 2A
Close - Paint/plaster
Wall
Dec 12, 2024 · Apt 3B
Close - Paint/plaster
Ceiling
Dec 12, 2024 · Apt 3B
Close - Water leak
Slow leak
Dec 12, 2024 · Apt 3B
Close - Unsanitary condition
Mold
Dec 12, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Nov 17, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt 2A
Close - Unsanitary condition
Pests
Nov 13, 2024 · Apt 2A
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 30, 2024 · Apt BSMT
Close - Unsanitary condition
Mold
Jul 30, 2024 · Apt BSMT
Close - Unsanitary condition
Mold
Jul 30, 2024 · Apt BSMT
Close - Plumbing
Basin/sink
Jul 30, 2024 · Apt BSMT
Close - Flooring/stairs
Floor
Jul 30, 2024 · Apt BSMT
Close - Plumbing
Radiator
Jul 30, 2024 · Apt BSMT
Close - Door/window
Door
Jul 30, 2024 · Apt BSMT
Close - Unsanitary condition
Pests
Jul 30, 2024 · Apt BSMT
Close - Unsanitary condition
Pests
Jul 30, 2024 · Apt BSMT
Close - Paint/plaster
Ceiling
Jul 30, 2024 · Apt BSMT
Close - Water leak
Damp spot
Jul 30, 2024 · Apt BSMT
Close - Water leak
Heavy flow
Feb 4, 2023 · Apt THEBAS
Close - Door/window
Door
Feb 4, 2023 · Apt THEBAS
Close - Safety
Fire escape
Feb 4, 2023 · Apt THEBAS
Close - Unsanitary condition
Sewage
Feb 4, 2023 · Apt THEBAS
Close - Unsanitary condition
Mold
Feb 4, 2023 · Apt THEBAS
Close - Electric
Power outage
Feb 4, 2023 · Apt THEBAS
Close - General
Cooking gas
Feb 4, 2023 · Apt THEBAS
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt THEBAS
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 3
- Residential units
- 3
- Building area
- 4,095 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2732 / 51
- Assessed value
- $67,800
- Landmark / historic district
- No
HPD registration #204298, last renewed Sep 15, 2025.
Questions about 857 Bruckner Boulevard
Who owns 857 Bruckner Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 857 Bruckner Partners LLC.
Does 857 Bruckner Boulevard have violations?
Yes. NYC HPD has recorded 118 housing violations at this property.
Is 857 Bruckner Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 857 Bruckner Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 857 Bruckner Boulevard?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.