873 Bruckner Boulevard
Bronx, NY 10459BBL 2-02732-0043Map
Owner of record: Kevin Ellison
873 Bruckner Boulevard is a walk-up apartment building built in 1925 in Bronx, 10459. It has 3 residential units across 3 floors. The owner of record is Kevin Ellison. HPD has recorded 128 housing violations here, most recently on July 22, 2026. 46 of the 50 most recent violations are still open.
- HPD violations
- 128
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 69
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 128
- BHazardous
Repair the broken or defective connection water riser under kitchen sink shut off on left in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window counter balance at south window lower sash in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at north located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective woodbase sink cabinet in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective connection at sink wast line in the kitchen located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floors in the 1st room from east located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from east at south
Jul 22, 2026 · Apt 3
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the 1st floor at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 18, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Open — Info nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceilings and walls at all stories at public hall
Oct 16, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at 3rd story public hall at public hall, 3rd story
Oct 16, 2025
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain bathtub enamel in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx.:30 sq. ft. in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective caulking surrounding bathtub in the bathroom located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3, 3rd story, 1st apartment from west at north
Oct 16, 2025 · Apt 3
Open — Notice of issuance sent to tenant - BHazardous
Remove all encumbrances consisting of household items at scuttle ladder at public hall, 3rd story
Oct 16, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 7, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective door at building entrance at public hall, 1st story
Oct 7, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective side glass pane at vestibule at public hall, 1st story
Oct 7, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective mortar joints at rear west exterior wall
Sep 9, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective roof membrane throughout entire roof
Sep 9, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective mortar joints at rear south exterior wall
Sep 9, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system at vestibule at public hall, 1st story
Feb 28, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at public hall, 3rd story
Feb 19, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at vestibule door at right on entering at public hall, 1st story
Feb 19, 2025
Open — First no access to re- inspect violation - BHazardous
M/d law abate the nuisance consisting of washing machine at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Feb 19, 2025
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling and south wall at public hall, 3rd story
Feb 19, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant msterial at the ceiling and south wall at public hall, 3rd story
Feb 19, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 14, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from south at west
Feb 14, 2025 · Apt 1
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of househod items blocking scuttle ladder at public hall, 3rd story
Feb 14, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective right side glass pane of side light at 1st story public hall at public hall, 3rd story
Feb 14, 2025
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Feb 8, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 1, 1st story, 1st apartment from east at south
Feb 8, 2025 · Apt 1
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Found boiler not working at time of inspection, spill switch disconnect, missing aquastat reset , safety need to be pipe to ground., maintain boiler; correct all violating conditions and submit a certificate of
Nov 28, 2023 · Penalty $3,125
Active
Complaints
- Plumbing
Steam pipe/riser
Jul 20, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 3
Close - General
Cabinet
Jul 20, 2026 · Apt 3
Close - Water leak
Heavy flow
Jul 20, 2026 · Apt 3
Close - Door/window
Window frame
Jul 20, 2026 · Apt 3
Close - Unsanitary condition
Mold
Jul 20, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Jul 20, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 3
Close - Unsanitary condition
Mold
Jun 29, 2026 · Apt 3
Close - Flooring/stairs
Floor
Jun 29, 2026 · Apt 3
Close
Show 40 more ↓
- Plumbing
Basin/sink
Jun 29, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jun 29, 2026 · Apt 3
Close - Plumbing
Bathtub/shower
Jun 29, 2026 · Apt 3
Close - General
Cabinet
Jun 29, 2026 · Apt 3
Close - Unsanitary condition
Pests
Jun 29, 2026 · Apt 3
Close - Water leak
Heavy flow
Jun 29, 2026 · Apt 3
Close - Unsanitary condition
Mold
Oct 2, 2025 · Apt 3
Close - Unsanitary condition
Pests
Oct 2, 2025 · Apt 3
Close - Electric
Outlet/switch
Oct 2, 2025 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Oct 2, 2025 · Apt 3
Close - Heat/hot water
Entire building
Feb 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Dec 19, 2024 · Apt 2
Close - Heat/hot water
Entire building
Nov 25, 2023 · Apt BLDG
Close - Water leak
Slow leak
Apr 17, 2018 · Apt 2
Close - Outside building
Roofing
Apr 17, 2018 · Apt 2
Close - Door/window
Door
Apr 17, 2018 · Apt 2
Close - Door/window
Door
Apr 17, 2018 · Apt 2
Close - Plumbing
Water supply
Apr 17, 2018 · Apt 2
Close - Unsanitary condition
Mold
Apr 17, 2018 · Apt 2
Close - Unsanitary condition
Pests
Apr 13, 2018 · Apt 2
Close - Water leak
Heavy flow
Apr 13, 2018 · Apt 2
Close - Outside building
Roof door/hatch
Apr 13, 2018 · Apt 2
Close - Door/window
Door
Apr 13, 2018 · Apt 2
Close - Plumbing
Water supply
Apr 13, 2018 · Apt 2
Close - Unsanitary condition
Mold
Apr 13, 2018 · Apt 2
Close - Nonconst
Vermin
Sep 15, 2012 · Apt 6
Close - Nonconst
Vermin
Sep 15, 2012 · Apt 6
Close - Nonconst
Smoke detector
Sep 15, 2012 · Apt 6
Close - Nonconst
Rubbish
Sep 15, 2012 · Apt 6
Close - General
Fire-escape
Sep 15, 2012 · Apt 6
Close - Nonconst
Rubbish
Sep 15, 2012 · Apt 6
Close - Nonconst
Vermin
Apr 7, 2010 · Apt PH
Close - Nonconst
Vermin
Apr 7, 2010 · Apt PH
Close - Heating
Heat related
Feb 2, 2009 · Apt 3
Close - Nonconst
Vermin
Sep 30, 2008 · Apt 2
Close - Plumbing
Sewer
Sep 30, 2008 · Apt 2
Close - Appliance
Electric/gas range
Oct 5, 2007 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C0)
- Year built
- 1925
- Floors
- 3
- Residential units
- 3
- Building area
- 4,095 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2732 / 43
- Assessed value
- $70,920
- Landmark / historic district
- No
HPD registration #210618, last renewed Apr 1, 1993.
Questions about 873 Bruckner Boulevard
Who owns 873 Bruckner Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Kevin Ellison.
Does 873 Bruckner Boulevard have violations?
Yes. NYC HPD has recorded 128 housing violations at this property.
Is 873 Bruckner Boulevard rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 873 Bruckner Boulevard built?
City records list 1925 as the year it was built.
How many apartments are in 873 Bruckner Boulevard?
It has 3 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.