906 Simpson Street
Bronx, NY 10459BBL 2-02723-0028Map
Owner of record: 906 Simpson St H F D C
906 Simpson Street is a walk-up apartment building built in 1925 in Bronx, 10459. It has 31 residential units across 5 floors. The owner of record is 906 Simpson St H F D C. HPD has recorded 548 housing violations here, most recently on October 11, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 548
- DOB violations
- 31
- ECB violations
- 5
- HPD complaints
- 322
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 548
- BHazardous
Properly repair with similar material the broken or defective wood base cabinet at south wall in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base cebinet at north wall in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallway located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall and north wall in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at bathtube in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from north located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective south door frame in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more then 10 sq. ft. at east wall in the 1st room from north located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the missing upper wood cabinet at north wall in the kitchen located at apt 4e, 4th story, 1st apartment from north at east
Oct 11, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective lower window sash spring balance in the 1st room from north at east located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective lower window sash spring balance in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe under the sink in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1a, 1st story, 2nd apartment from west at north
Oct 11, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 26, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
Sep 26, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east
Sep 10, 2026 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Sep 10, 2026 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Sep 10, 2026 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east
Sep 10, 2026 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Sep 10, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Aug 2, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bed mattress at public hall, 3rd story
Aug 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling approx 10sq.ft in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from west at north
Aug 2, 2026 · Apt 1A
Open — Nov sent out
DOB building violations · 31
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2022
Dob violation - active
Show 21 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 5
- Class - 1
At rear of property retaining wall has water seepage going onto adjacent property 907 southern blvd. water appears to be sewage discharge., repair and/replace
Sep 25, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain building in code compliant manner. accumulation of garbage & debris stored at lobby floor observed obstructing clear passage to rear exit door: creating an egress & fire hazard., repair and/
Oct 23, 2025 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioners order contained in summons/violation #32098053k issued on 11-02-2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).an acceptible ce
Aug 12, 2019 · Penalty $3,125
Resolve - Class - 2
B254,201,15,32a
Nov 2, 2018 · Penalty $625
Active - Class - 2
Failure to maintain bldg in code compliant manner. upon inspection i observed raw sewage overflowing through area drain and leader line on to rear courtyard and the side of bldg on to adj bldg location is swarm
Aug 6, 2009 · Penalty $2,500
Active
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt 1F
Open - Unsanitary condition
Mold
Oct 10, 2026 · Apt 4E
Close - General
Cabinet
Oct 10, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Oct 3, 2026 · Apt 4E
Close - Unsanitary condition
Mold
Oct 3, 2026 · Apt 4E
Close - Paint/plaster
Ceiling
Oct 3, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Aug 20, 2026 · Apt 1D
Close
Show 40 more ↓
- General
Cooking gas
Aug 20, 2026 · Apt 1D
Close - Door/window
Window frame
Aug 20, 2026 · Apt 1D
Close - Unsanitary condition
Mold
Aug 20, 2026 · Apt 1D
Close - Heat/hot water
Entire building
Jul 31, 2026 · Apt 1A
Close - Water leak
Damp spot
Jul 31, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jul 31, 2026 · Apt 1A
Close - Plumbing
Toilet
Jun 9, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jun 9, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Jun 9, 2026 · Apt 1A
Close - Door/window
Door
Jun 9, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jun 9, 2026 · Apt 1A
Close - Appliance
Electric/gas range
Jun 9, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jun 8, 2026 · Apt 2E
Close - Paint/plaster
Wall
Jun 8, 2026 · Apt 2E
Close - Water leak
Heavy flow
Mar 22, 2026 · Apt 3E
Close - Paint/plaster
Ceiling
Mar 22, 2026 · Apt 3E
Close - Plumbing
Toilet
Mar 3, 2026 · Apt 1A
Close - Plumbing
Toilet
Mar 3, 2026 · Apt 1A
Close - Water leak
Heavy flow
Mar 3, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Water leak
Slow leak
Dec 13, 2025 · Apt 2F
Close - Water leak
Heavy flow
Dec 13, 2025 · Apt 2F
Close - Paint/plaster
Wall
Jul 31, 2025 · Apt 1D
Close - Plumbing
Toilet
Jul 31, 2025 · Apt 1D
Close - Flooring/stairs
Floor
Jul 31, 2025 · Apt 1D
Close - Door/window
Door
Jul 31, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Jul 31, 2025 · Apt 1D
Close - Water leak
Slow leak
Jul 31, 2025 · Apt 1D
Close - Plumbing
Radiator
Jul 31, 2025 · Apt 1D
Close - Door/window
Window frame
Jul 31, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Jul 31, 2025 · Apt 1D
Close - Plumbing
Bathtub/shower
Jul 31, 2025 · Apt 1D
Close - Paint/plaster
Ceiling
Jun 27, 2025 · Apt 5D
Close - Electric
Wiring
Jun 27, 2025 · Apt 5D
Close - Electric
Lighting
Jun 27, 2025 · Apt 5D
Close - Water leak
Slow leak
May 6, 2025 · Apt 5E
Close - Water leak
Damp spot
May 6, 2025 · Apt 5E
Close - Water leak
Heavy flow
Nov 11, 2024 · Apt 3E
Close - Unsanitary condition
Mold
Nov 11, 2024 · Apt 3E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1925
- Floors
- 5
- Residential units
- 31
- Building area
- 34,875 ft²
- Lot area
- 7,875 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2723 / 28
- Assessed value
- $764,550
- Landmark / historic district
- No
HPD registration #204747, last renewed Aug 31, 2025.
Questions about 906 Simpson Street
Who owns 906 Simpson Street?
The owner of record in NYC Department of City Planning PLUTO data is 906 Simpson St H F D C.
Does 906 Simpson Street have violations?
Yes. NYC HPD has recorded 548 housing violations at this property.
Is 906 Simpson Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 906 Simpson Street built?
City records list 1925 as the year it was built.
How many apartments are in 906 Simpson Street?
It has 31 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.