roofy

850 Intervale Avenue

Bronx, NY 10459BBL 2-02722-0030Map

Owner of record: Hernandez Diana

850 Intervale Avenue is a walk-up apartment building built in 1910 in Bronx, 10459. It has 8 residential units across 4 floors. The owner of record is Hernandez Diana. HPD has recorded 102 housing violations here, most recently on April 30, 2026. 48 of the 50 most recent violations are still open.

HPD violations
102
DOB violations
30
ECB violations
1
HPD complaints
65

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 102

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7, 4th story, 1st apartment from north at east

    Nov 23, 2025 · Apt 7

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room at boiler room

    Nov 23, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Nov 23, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing

    Nov 23, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Nov 23, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign posted, no info

    Nov 23, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing

    Nov 23, 2025

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 23, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Open — Info nov sent out
Show 40 more ↓
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 22, 2024

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2024

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Open — Info nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st private hallway from east located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the bathroom located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jul 31, 2023

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom connection from building entrance to intercom panel at south wall in the 2nd private hallway from east located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 4, 2nd story, 2nd apartment from north at east

    Jul 31, 2023 · Apt 4

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 31, 2023

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 3, 2022

    Open — Info nov sent out
  • C

    Properly repair the broken or defective lock at building front entrance door at public hall, 1st story

    Jul 6, 2022

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 17, 2022

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 17, 2022

    Open — Info nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 2, 2021

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 2, 2021

    Open — Info nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Open — Info nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall, 1st riser from east at south wall in the 3rd room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective metal cornice building front at east

    Nov 24, 2017

    Closed — Violation closed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at north wall in the 5th room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of expose electrical wire at north wall in the 2nd private hallway located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall in the 3rd room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 3rd room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door frame from west at north wall in the 4th room from east located at apt 4, 2nd story, 2nd apartment from north at east

    Nov 24, 2017 · Apt 4

    Open — Nov sent out

DOB building violations · 30

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - active
Show 20 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - active

ECB violations · 1

  • Class - 2

    B265 as per class 2 (b265) 28.303.7 failure to file a complete boilerinspection as per dob record submit a current bo9 report.

    Feb 7, 2017 · Penalty $2,500

    Active

Complaints

  • Heat/hot water

    Entire building

    Nov 22, 2025 · Apt 7

    Close
  • Plumbing

    Toilet

    Nov 8, 2024 · Apt 6

    Close
  • Water leak

    Heavy flow

    Jul 22, 2023 · Apt 4

    Close
  • Door/window

    Door

    Jun 13, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2019 · Apt 8

    Close
  • Appliance

    Electric/gas range

    Feb 23, 2018 · Apt 8

    Close
  • Flooring/stairs

    Floor

    Dec 15, 2017 · Apt 4

    Close
  • Paint/plaster

    Wall

    Dec 15, 2017 · Apt 4

    Close
  • Paint/plaster

    Wall

    Dec 15, 2017 · Apt 4

    Close
  • Water leak

    Slow leak

    Dec 15, 2017 · Apt 4

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Dec 15, 2017 · Apt 4

    Close
  • Unsanitary condition

    Mold

    Dec 15, 2017 · Apt 4

    Close
  • Water leak

    Slow leak

    Dec 12, 2017 · Apt 4

    Close
  • Flooring/stairs

    Floor

    Dec 12, 2017 · Apt 4

    Close
  • Unsanitary condition

    Mold

    Dec 12, 2017 · Apt 4

    Close
  • Unsanitary condition

    Mold

    Nov 21, 2017 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2017 · Apt 4

    Close
  • Heat/hot water

    Apartment only

    Nov 21, 2017 · Apt 4

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2017 · Apt 6

    Close
  • Appliance

    Refrigerator

    Jul 9, 2012 · Apt 4

    Close
  • Heating

    Heat related

    Jan 16, 2012 · Apt 7

    Close
  • Heating

    Heat related

    Aug 2, 2011 · Apt 2

    Close
  • Heating

    Heat related

    May 31, 2011 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Feb 10, 2011 · Apt 1

    Close
  • Nonconst

    Vermin

    Feb 10, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Feb 10, 2011 · Apt 1

    Close
  • Nonconst

    Vermin

    Feb 10, 2011 · Apt 1

    Close
  • Nonconst

    Vermin

    Feb 10, 2011 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Feb 10, 2011 · Apt 1

    Close
  • Plumbing

    Toilet

    Feb 10, 2011 · Apt 1

    Close
  • Plumbing

    Toilet

    Feb 10, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Feb 10, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    Feb 10, 2011 · Apt 1

    Close
  • Appliance

    Refrigerator

    Feb 10, 2011 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Feb 10, 2011 · Apt 1

    Close
  • General

    Windows

    Feb 10, 2011 · Apt 1

    Close
  • General

    Floor

    Feb 10, 2011 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Feb 10, 2011 · Apt 1

    Close
  • Plumbing

    Basin/sink

    Feb 10, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Feb 10, 2011 · Apt 1

    Close
  • General

    Doors

    Feb 10, 2011 · Apt 1

    Close
  • General

    Locks

    Feb 10, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    Feb 10, 2011 · Apt 1

    Close
  • Heating

    Heat related

    Nov 19, 2008 · Apt 6

    Close
  • Paint/plaster

    Wall

    Oct 18, 2007 · Apt 6

    Close
  • Paint/plaster

    Wall

    Oct 18, 2007 · Apt 6

    Close
  • Nonconst

    Vermin

    Dec 15, 2006 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Dec 15, 2006 · Apt 1

    Close
  • General

    Floor

    Dec 15, 2006 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1910
Floors
4
Residential units
8
Building area
8,164 ft²
Lot area
2,931 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2722 / 30
Assessed value
$611,100
Landmark / historic district
No

HPD registration #204959, last renewed Jul 13, 2018.

Questions about 850 Intervale Avenue

Who owns 850 Intervale Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Hernandez Diana.

Does 850 Intervale Avenue have violations?

Yes. NYC HPD has recorded 102 housing violations at this property.

Is 850 Intervale Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 850 Intervale Avenue built?

City records list 1910 as the year it was built.

How many apartments are in 850 Intervale Avenue?

It has 8 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.