909 Beck Street
Bronx, NY 10459BBL 2-02711-0128Map
Owner of record: Tiffany Beck Housing Development Fund Co Rporation
909 Beck Street is an elevator apartment building built in 2018 in Bronx, 10459. It has 89 residential units across 8 floors. The owner of record is Tiffany Beck Housing Development Fund Co Rporation. HPD has recorded 17 housing violations here, most recently on May 8, 2026. 9 of the 17 most recent violations are still open.
- HPD violations
- 17
- DOB violations
- 14
- ECB violations
- 15
- HPD complaints
- 37
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 17
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 5th apartment from north at east
Nov 19, 2025 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective silicone caulking around around tiles at floor in shower stall in the bathroom located at apt 5k, 5th story, 1st apartment from north at east
Oct 17, 2025 · Apt 5K
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5k, 5th story, 1st apartment from north at east
Oct 17, 2025 · Apt 5K
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light switch at north wall in the bathroom located at apt 5k, 5th story, 1st apartment from north at east
Oct 17, 2025 · Apt 5K
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 5k, 5th story, 1st apartment from north at east
Oct 17, 2025 · Apt 5K
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room at boiler room
Oct 17, 2025
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Jun 18, 2025 · Apt 2C
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 2nd apartment from east at south
Jun 18, 2025 · Apt 2C
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 17, 2024
Closed — Violation dismissed
Show 7 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective bell buzzer intercom system in the entrance located at apt 5m, 5th story, 2nd apartment from south at west
Apr 29, 2023 · Apt 5M
Open — First no access to re- inspect violation - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 23, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jan 23, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed
Show 4 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 17, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 17, 2019
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jan 17, 2019
Vp*-violation unserved ecb- dismissed
ECB violations · 15
- Class - 2
Documents to be kept on site (sidewalk shed locs) @the time of my inspection, i observed that there were no installation & reripple inspection letter for the sidewalk shed @exp 1. also, there was no daily log
May 13, 2020
Resolve - Class - 1
Failure to maintain/display on site doc required by bc chapter 33 (supported scaffold insp log) @the time of my inspection on a active jobs ite of an 8 sty building. i observed supported scaffold erected @all
Oct 9, 2019 · Penalty $625
Resolve - Class - 1
Bc 3314.9.2 (supported scaffold netting) failure to erct and maintain supported scaffold as per code. @the time of my inspection on an active job site of a 8 sty building, i observed @expo2#1 debris netting was
Oct 9, 2019
Resolve - Class - 1
3301.1.2 failure to comply with nyc fire code no permit. note: at the time of my inspection i observed on jobsite at exposure #2 a diesel opperated generator to provide heat with no permit on site upon requres
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection on an active jobsite of an 8 story building. the permit holder failed to ensure each work successfully completed the required training under bc3321.1;
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection the permit holder failed to ensure each worker successfully completed the required training under bc3321.1. i observed jose mejia working at a buildin
Jan 17, 2019
Resolve - Class - 1
3301.1 failure to comply with osha standards:full body harness.at the time of my inspection on an active jobsite i observed several contractors working on pipe scaffold with inadequate and expired safety harnes
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection on an active jobsite of an 8 story building, the owner failed to ensure each worker successfully completed the required training under bc 3321.1. i ob
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection on an active jobsite of an 8 story buiding the employer failed to ensure each worker successfully completed required training under bc3321.1. i observ
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection on an active jobsite of an 8 story building the employer failed to ensure each worker successfully completed required training under bc3321.1. i obser
Jan 17, 2019
Resolve
Show 5 more ↓
- Class - 1
Work does not conform to approved construction documents and or approved amendments. at the time of inspection i observed "anti-hydro"being added to the mortar mix for cmu installation of a 8 story building
Jan 17, 2019
Resolve - Class - 1
Failure to provide osha training. at the time of inspection of an active jobsite of an 8 story building proposed, the owner failed to ensure each worker successfully completed the required traiining under bc331
Jan 17, 2019
Resolve - Class - 1
Failure to institute/maintain safety measures guardrails at the time of my inspection of an 8 story nb at 1st flr deck,i observed 4 men doing layout.there is a lack of guardrails at expo 1 having approximize 8t
Nov 1, 2018 · Penalty $2,500
Resolve - Class - 2
Sec: bc 3309.3. failure to perform insp & document conditions of existing structures adjoining a construction or demo site in a pre-construction survey. @ time of insp observed an active construction site w/ dr
Jun 13, 2018 · Penalty $625
Resolve - Class - 2
Sec: bc 3301.2. no guard rails. @ time of insp observed an active construction site w/ drilling operation on progress. during insp noted there were not guardrails @ exp#3 wide opening & unprotect as required by
Jun 13, 2018
Resolve
Complaints
- General
Ventilation system
Aug 24, 2026 · Apt 4K
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt 8B
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 17, 2025 · Apt 2F
Close - Door/window
Door
Nov 14, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 2F
Close - Door/window
Door
Nov 13, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2F
Close
Show 27 more ↓
- Door/window
Door
Nov 7, 2025 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Nov 7, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Nov 7, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 21, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 2F
Close - Plumbing
Radiator
Oct 15, 2025 · Apt 2F
Close - Unsanitary condition
Sewage
Oct 15, 2025 · Apt 2F
Close - Unsanitary condition
Mold
Oct 10, 2025 · Apt 5K
Close - Heat/hot water
Apartment only
Jun 17, 2025 · Apt 2C
Close - Plumbing
Radiator
May 27, 2025 · Apt 2F
Close - Door/window
Door
May 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2025 · Apt BLDG
Close - Door/window
Door
Feb 12, 2025 · Apt 2I
Close - Door/window
Door
Feb 8, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 5, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 25, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 11, 2024 · Apt APT4K
Close - Unsanitary condition
Pests
Apr 14, 2023 · Apt 3C
Close - Unsanitary condition
Pests
Mar 20, 2023 · Apt 3B
Close - General
Bell/buzzer/intercom
Feb 17, 2023 · Apt 5M
Close - Heat/hot water
Apartment only
Feb 4, 2023 · Apt 2S
Close - Heat/hot water
Apartment only
Jan 27, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 25, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 22, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 19, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 6, 2022 · Apt 2F
Close - Heat/hot water
Entire building
Jan 5, 2022 · Apt 2F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2018
- Floors
- 8
- Residential units
- 89
- Building area
- 76,264 ft²
- Lot area
- 11,897 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2711 / 128
- Assessed value
- $4,642,200
- Landmark / historic district
- No
HPD registration #228279, last renewed Oct 7, 2025.
Questions about 909 Beck Street
Who owns 909 Beck Street?
The owner of record in NYC Department of City Planning PLUTO data is Tiffany Beck Housing Development Fund Co Rporation.
Does 909 Beck Street have violations?
Yes. NYC HPD has recorded 17 housing violations at this property.
Is 909 Beck Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 909 Beck Street built?
City records list 2018 as the year it was built.
How many apartments are in 909 Beck Street?
It has 89 residential units and 90 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.