1080 Intervale Avenue
Bronx, NY 10459BBL 2-02705-0026Map
Owner of record: Phantom Fund LLC
1080 Intervale Avenue is a mixed residential and retail building built in 1910 in Bronx, 10459. It has 5 residential units across 3 floors. The owner of record is Phantom Fund LLC. HPD has recorded 102 housing violations here, most recently on April 7, 2026. 17 of the 50 most recent violations are still open.
- HPD violations
- 102
- DOB violations
- 3
- ECB violations
- 8
- HPD complaints
- 101
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 102
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioners protruding 6'' from window sil, at 3rd story, 1st fire escape from north at east exterior wall at fire escape
Apr 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door coliding with frame at building entrance (street to vestibule) , 1st story
Apr 7, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 27, 2024
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 27, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from west at north
Sep 27, 2024 · Apt 2
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from north located at apt 2, 2nd story, 1st apartment from west at north
Sep 27, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 3rd story, 1st apartment from north at east
Mar 6, 2024 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 6, 2024
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
Mar 6, 2024 · Apt 5
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 5, 3rd story, 1st apartment from south at west
Mar 6, 2024 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
Mar 6, 2024 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
Feb 12, 2024 · Apt 5
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective deteriorating base of cabinet in the kitchen located at apt 5, 3rd story, 1st apartment from south at west
Feb 12, 2024 · Apt 5
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 5, 3rd story, 1st apartment from south at west
Feb 12, 2024 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 12, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 3rd story, 1st apartment from south at west
Feb 12, 2024 · Apt 5
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5, 3rd story, 1st apartment from south at west
Feb 12, 2024 · Apt 5
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder affixed with appropriate nuts and bolts on first fire escape feom north at west (building front) at fire escape
Dec 18, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 4, 3rd story, 1st apartment from north at east
Apr 24, 2019 · Apt 4
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2, 2nd story, 1st apartment from north at east
Apr 24, 2019 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at and or near mailboxes at public hall, 1st story
Jun 11, 2018
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at bldg front balcony at fire escape
Jun 11, 2018
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 11, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jun 11, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Jun 11, 2018
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 11, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 11, 2018
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). ..defective located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the smoke detector ...defective located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance at lower sash at window in the kitchen located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Properly secure the loose doors at wall cabinet at west wall in the kitchen located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Properly repair the broken or defective electrical outlet at west wall in the kitchen located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchen located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective striker plate at door in the entrance located at apt 2, 2nd story, apartment at east
Apr 29, 2018 · Apt 2
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2017 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1, 1st story, 1st apartment from north at east
Sep 14, 2017 · Apt 1
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 7, 2017
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 7, 2021
Dob violation - dismissed - Plumbing none
The borough commissioner intends to revoke all plumbing permit and approvals issued under job #220698127 due to revocation of license master plumber #1762 , all plumbing work in connection with above mentioned permit number has been ordered stopped immediately.
Mar 16, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 11, 2010
Dob violation - dismissed
ECB violations · 8
- Class - 2
Failure to comply with commissioner's order contained in summons/violation #39039515k issued 4/15/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no c of c on file.remedy:comply with
Dec 16, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/v39039515k issued4/15/21 &to file c/c pursuant to28-201.1&1rcny102-01.failure to obey vacate order235/2010 comply w/commissioner's order &/or file c
Oct 20, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#39039515k issued on 04/15/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a cert of c
Sep 10, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39039515k issued on 4/15/2021 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with comm
Jul 27, 2021 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#39039515r issued on 4/15/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissio
Jun 7, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to obey vacate order#235/2010, issued at 9-11-2010 for entire house. alt-2 permit issued to repair (job # 220698127) is expired. at inspection time, observed, building was fully occupied and barber shop
Apr 15, 2021 · Penalty $4,800
Resolve - Non-hazardous
Air pancy contrary to that allowed by the departmnent records records nb 718-1899 alt 150-1037 bn 472-69 all records indicate store on first floor which is grandfuthered use group 6 first floor now used for aut
Apr 18, 1996 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain building. defect (1) brickwork missing broken, defective roof level (2) hole in ceiling approx 4' x 5' 1st story radiator repair shop (3) make necessary repairs at fire escapes immediatley.
Jul 15, 1994 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Apr 6, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Feb 18, 2026 · Apt 4
Close - Unsanitary condition
Pests
Feb 18, 2026 · Apt 4
Close - Electric
Wiring
Feb 18, 2026 · Apt 4
Close - Flooring/stairs
Floor
Feb 18, 2026 · Apt 4
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 26, 2024 · Apt BLDG
Close - Plumbing
Radiator
Apr 16, 2024 · Apt 5
Close - Heat/hot water
Apartment only
Apr 16, 2024 · Apt 5
Close - Heat/hot water
Entire building
Mar 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2024 · Apt 2
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt 2
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2024 · Apt BLDG
Close - Safety
Smoke detector
Feb 12, 2024 · Apt THIRDF
Close - Water leak
Heavy flow
Feb 12, 2024 · Apt THIRDF
Close - Unsanitary condition
Pests
Feb 12, 2024 · Apt THIRDF
Close - Door/window
Door frame
Feb 12, 2024 · Apt THIRDF
Close - Flooring/stairs
Floor
Feb 12, 2024 · Apt THIRDF
Close - Paint/plaster
Wall
Feb 12, 2024 · Apt THIRDF
Close - Paint/plaster
Ceiling
Feb 12, 2024 · Apt THIRDF
Close - Unsanitary condition
Pests
Feb 12, 2024 · Apt THIRDF
Close - Safety
Carbon monoxide detector
Feb 12, 2024 · Apt THIRDF
Close - General
Cabinet
Feb 12, 2024 · Apt THIRDF
Close - Plumbing
Basin/sink
Feb 12, 2024 · Apt THIRDF
Close - Plumbing
Radiator
Feb 12, 2024 · Apt THIRDF
Close - Heat/hot water
Apartment only
Feb 12, 2024 · Apt THIRDF
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 12, 2024 · Apt BLDG
Close - Safety
Sprinkler
Feb 12, 2024 · Apt THIRDF
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 19, 2023 · Apt APT1
Close - Heat/hot water
Entire building
Dec 18, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2023 · Apt 1
Close - Heat/hot water
Entire building
Dec 17, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2023 · Apt BLDG
Close - Outside building
Porch/balcony
Jul 10, 2023 · Apt 1
Close - Flooring/stairs
Floor
Jul 10, 2023 · Apt 1
Close - Electric
Lighting
Jul 10, 2023 · Apt 1
Close - Electric
Outlet/switch
Jul 10, 2023 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1910
- Floors
- 3
- Residential units
- 5
- Building area
- 3,999 ft²
- Lot area
- 2,142 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2705 / 26
- Assessed value
- $466,200
- Landmark / historic district
- No
HPD registration #214481, last renewed Nov 13, 2025.
Questions about 1080 Intervale Avenue
Who owns 1080 Intervale Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Phantom Fund LLC.
Does 1080 Intervale Avenue have violations?
Yes. NYC HPD has recorded 102 housing violations at this property.
Is 1080 Intervale Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1080 Intervale Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 1080 Intervale Avenue?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.