1082 Hall Place
Bronx, NY 10459BBL 2-02700-0038Map
Owner of record: 1082 Hall Am LLC
1082 Hall Place is a walk-up apartment building built in 2019 in Bronx, 10459. It has 8 residential units across 4 floors. The owner of record is 1082 Hall Am LLC. HPD has recorded 75 housing violations here, most recently on September 13, 2026. 32 of the 50 most recent violations are still open.
- HPD violations
- 75
- DOB violations
- 12
- ECB violations
- 25
- HPD complaints
- 63
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 75
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of motion sensor at ceiling light fixtures at public hall, 1st story
Sep 13, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 13, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st bathroom from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 13, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling and behind west wall in the 1st bathroom from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 13, 2026 · Apt 1A
Open — Nov sent out
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of sensor at ceiling light fixtures at public hall stairs, 1st story
Sep 13, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line at sink in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Sep 13, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at wash basin in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Sep 13, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly secure the loose wash basin at west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Sep 13, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Sep 13, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall at public hall, 1st story
Jul 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at fire retardant material at south wall at public hall, 1st story
Jul 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective bell buzzer intercom system from the building entrance door to panel in the entire apartment located at apt 3b, 1st story
Jul 29, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at north wall in the 1st room from east at south located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from east at center located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly secure the loose wash basin at west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from north at east
Mar 4, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass panel at building entrance door , 1st story
Mar 4, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective closer arm at building entrance door , 1st story
Mar 4, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Aug 17, 2025 · Apt 1B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
Aug 17, 2025 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture in the 2nd room from east located at apt 1b, 1st story, 1st apartment from east at south
Aug 17, 2025 · Apt 1B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Apr 29, 2025 · Apt 1A
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Apr 29, 2025 · Apt 1A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 17, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective ceramic floor tiles in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... at the east wall and ceiling, approximately 4 sq. ft in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective ceramic floor tiles in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Oct 25, 2017 · Apt 1
Closed — Violation closed
DOB building violations · 12
- Construction other optional
: notice of order to stop work immediately due to general contractor withdrawal application #220152983nb.
Sep 28, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 23, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 4, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed
Show 2 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 7, 2018
Dob violation - dismissed - Construction other optional
Due to fire
Nov 17, 2017
Dob violation - dismissed
ECB violations · 25
- Class - 2
Storage on shed at the time of my inspection at a 4 story building under construction i observed the sws in place at expo 1 after inspectingthe sws i observed construction equipment debris and bricks on the sws
Mar 23, 2021 · Penalty $5,000
Resolve - Class - 1
Documents to be kept onsite.sws drawing at the time of my inspection at a 4 story building under construction i observed sidewalk shed in place at exp#1.request to see the sws drawing.none was provide inspectio
Mar 23, 2021 · Penalty $6,250
Resolve - Class - 1
3309.10 roof protection-adjacent property at the time of my inspectionat a 4 story building under construction i observed construction operations also inadequate roof protection for adjacent property expo 2 & 4
Mar 23, 2021 · Penalty $6,250
Resolve - Class - 1
Inadequate housekeeping at the time of my inspection at a 4 story building under construction i observed inadequate housekeeping at expo 3 multiple debris and garbage is pilled up and scatter at expo 3 make it
Mar 23, 2021 · Penalty $6,250
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel not provided.noted:at the time of my inspection of 4 story new building construction jobsite i observed missing project information panel and missing sidewa
Nov 9, 2020 · Penalty $3,125
Resolve - Class - 1
Failure to institute safety measure/equipment on active job site/construction-no guard rails.at the time of inspection at a 4 story nb,i observed the ground 2nd-3rd-4th floor mising guard rails on window and le
Mar 20, 2020 · Penalty $12,500
Resolve - Class - 1
Failure to institute safety measures-egress and housekeeping on activeconstruction site.at the time of inspection of a 4 story nb,i observedmany violating conditions all over job site all expo's.temporary woode
Mar 20, 2020 · Penalty $12,500
Resolve - Class - 1
No superintendent/no competent person failure to perform their duties on active job site.at the time of inspection at a 4 story nb,i obsevedmany unsafe conditions on site.logs were not sign for over 2 months by
Mar 20, 2020 · Penalty $12,500
Resolve - Class - 2
Bc33149-supported scaffold shall meet its requirements per section 3314.9.1 thru 3314.9.4.at the time of inspection at a 4 story nb,i observed on a active job site facade work in progress workers working on a s
Mar 20, 2020 · Penalty $3,125
Resolve - Class - 1
Protection of roof(neighboring properties)at the time of inspeciton ata 4 story nb,i observed on the roof level expo 2&4 mp roof protection on neighboring properties and parapet wall & facade was no compelled o
Mar 20, 2020 · Penalty $6,250
Resolve
Show 15 more ↓
- Class - 1
Competent person not on site @time of an active jobsite w/approx 7 workers on site installing the sidewalk shed & installing open web joist within the site, i requested from a worker with the site for the compe
Dec 12, 2019 · Penalty $12,500
Resolve - Class - 1
Failure to maintain/display on site documents required by bc chapter 33."site safety plans"at time of inspection i observed an active construction site with excavation work"p"backfil work on progrress,during in
Oct 23, 2019 · Penalty $1,250
Resolve - Class - 1
Unsafe storage of combustible material and equipment.at time of inspection i observed an active construction site with excavation & backfillwork on progress,during inspection i observed 6 plastic container with
Oct 23, 2019 · Penalty $2,500
Resolve - Class - 1
Construction superintendent fialed to perform duties as per rule.at time of inspection i observed active construction site with excavation and backfill work on progress,during inspection i asked for superintend
Oct 23, 2019 · Penalty $10,000
Resolve - Class - 2
Lack of egress.at time of inspection i observed an active constructionsite with excavation backfield & rebar on progress,during inspection noted the jobsite dont have any egress for public.dob inspector & worke
Oct 23, 2019 · Penalty $5,000
Resolve - Class - 1
No guard rails.at time of inspection i observed an active constructionsite with excavation & backfill on progress,during inspection i observed worker doing backfill and no guard rails system install to prevent
Oct 23, 2019 · Penalty $2,500
Resolve - Class - 2
Job site fence not constructed or maintained pursuant to subjection"inadaquate".at time of inspectoin i observed an active construction sitewith excavation & rebar work on progress,during inspection noted at ex
Oct 23, 2019 · Penalty $400
Resolve - Class - 1
No demoliton notification upon review of dept rocords (d.o.b b.i.s)@ the time of my inspection of building under full demolition-building down i observed that the lot was graded/back filled no notifcation date
Nov 3, 2018 · Penalty $6,250
Resolve - Class - 2
No veiwing panels @ the time of inspection of building under full demolition- building down. i observed that the jobsite fence @ exp 1+4 ha d no vewing panels as required by code.rem:provide dode compliant view
Nov 3, 2018 · Penalty $2,000
Resolve - Class - 1
Failure to provide required notification prior to the commencement of demolition. noted: a check of department records at the time of inspection indicates that notification was not given. rem: comply with code.
Oct 20, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35263115m issued on 11/17/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rmdy: comply with commissione
Feb 13, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35263111p issued on 11/17/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.rem:comply w/comm's order &/or a cert of correction
Dec 22, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio #35263115m issued on 11/17/17 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01.rem:comply w/comm's order &/or a cert of correction
Dec 22, 2017
Resolve - Class - 1
Occupancy contrary to bldg dept records in that cellar has been converted from boiler room & storage into an illegal class'b'apt w/3pc bathroom & bathroom. remedy: discontinue illegal occupancy.
Nov 17, 2017 · Penalty $2,400
Resolve - Class - 1
Work without a permit in that at cellar level, interior partitions erected to create an illegal class b apartmetn with 3 piece bathroom bedroom. illegal electrical wiring and plumbing lines installed. rem: obta
Nov 17, 2017
Resolve
Complaints
- Unsanitary condition
Pests
Aug 14, 2026 · Apt 1A
Close - Water leak
Heavy flow
Aug 14, 2026 · Apt 1A
Close - General
Bell/buzzer/intercom
Aug 9, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Aug 9, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Aug 9, 2026 · Apt 2B
Close - Paint/plaster
Wall
Aug 9, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Aug 9, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Jul 7, 2026 · Apt 2B
Close - Paint/plaster
Wall
Jun 25, 2026 · Apt BLDG
Close
Show 40 more ↓
- General
Bell/buzzer/intercom
Jun 25, 2026 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Jun 25, 2026 · Apt BLDG
Close - Electric
Power outage
Mar 4, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1BHEAT
Close - Paint/plaster
Ceiling
Dec 3, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Dec 3, 2025 · Apt 2B
Close - Electric
No lighting
Dec 3, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Dec 3, 2025 · Apt 2B
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 2B
Close - Door/window
Door
Dec 3, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Dec 3, 2025 · Apt 2B
Close - Electric
Outlet/switch
Dec 3, 2025 · Apt 2B
Close - Paint/plaster
Wall
Dec 3, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Jun 16, 2025 · Apt 1B
Close - Appliance
Refrigerator
Jun 16, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jun 16, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
Apr 27, 2025 · Apt 1A
Close - Door/window
Window frame
Feb 14, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Feb 14, 2025 · Apt 1B
Close - Plumbing
Toilet
Feb 14, 2025 · Apt 1B
Close - General
Cabinet
Feb 14, 2025 · Apt 1B
Close - Appliance
Refrigerator
Feb 14, 2025 · Apt 1B
Close - Paint/plaster
Wall
Feb 14, 2025 · Apt 1B
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt 4A
Close - Door/window
Door
Dec 14, 2024 · Apt 4A
Close - Appliance
Electric/gas range
Dec 14, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Feb 2, 2018 · Apt 1FL
Close - Heat/hot water
Apartment only
Nov 12, 2017 · Apt 2FL
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt 2
Close - Heat/hot water
Apartment only
Nov 8, 2017 · Apt 1
Close - Electric
No lighting
Oct 17, 2017 · Apt 1
Close - Plumbing
Water supply
Sep 27, 2017 · Apt BSMNT
Close - Plumbing
Water supply
Sep 27, 2017 · Apt BSMNT
Close - Door/window
Door
Sep 27, 2017 · Apt BSMNT
Close - Electric
No lighting
Sep 27, 2017 · Apt BSMNT
Close - General
Mailbox
Sep 27, 2017 · Apt 1
Close - General
Cooking gas
Sep 27, 2017 · Apt 1
Close - Heat/hot water
Entire building
Sep 27, 2017 · Apt 1
Close - Electric
Power outage
Sep 27, 2017 · Apt 1
Close - Electric
No lighting
Mar 12, 2015 · Apt 2ND
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Mar 2, 2026 | $10 | Rentals - walkup apartments | 8 |
| Feb 17, 2026 | $100 | Rentals - walkup apartments | 8 |
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2019
- Floors
- 4
- Residential units
- 8
- Building area
- 5,909 ft²
- Lot area
- 2,128 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2700 / 38
- Assessed value
- $524,250
- Landmark / historic district
- No
HPD registration #229181, last renewed May 28, 2026.
Questions about 1082 Hall Place
Who owns 1082 Hall Place?
The owner of record in NYC Department of City Planning PLUTO data is 1082 Hall Am LLC.
Does 1082 Hall Place have violations?
Yes. NYC HPD has recorded 75 housing violations at this property.
Is 1082 Hall Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1082 Hall Place built?
City records list 2019 as the year it was built.
How many apartments are in 1082 Hall Place?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.