roofy

882 East 156 Street

Bronx, NY 10455BBL 2-02687-0022Map

Owner of record: Emma Group LLC

882 East 156 Street is a two-family home built in 1901 in Bronx, 10455. It has 2 residential units across 2 floors. The owner of record is Emma Group LLC. HPD has recorded 77 housing violations here, most recently on March 19, 2026. 19 of the 50 most recent violations are still open.

HPD violations
77
DOB violations
0
ECB violations
8
HPD complaints
272

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 77

  • C

    Properly repair the source and abate the evidence of a water leak active drip at ceiling in the 6th room from north located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from south at west original violation 18721743 issued 19-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Mar 19, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective missing/broken (ceramic wall tiles) at east wall (bathtub) in the bathroom located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective missing/broken (cement board) at east wall(bathtub) in the bathroom located at apt 1, 1st story, 2nd apartment from south at west

    Mar 19, 2026 · Apt 1

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 27, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 31, 2018

    Closed — Violation dismissed
  • B

    Replace with new the missing electrical light switch cover plate in the bathroom located at apt 2, 2nd story

    Feb 28, 2017 · Apt 2

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and wall. in the kitchen located at apt 2, 2nd story

    Feb 28, 2017 · Apt 2

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling. in the kitchenette located at apt 1, 1st story

    Feb 28, 2017 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles. in the kitchenette located at apt 1, 1st story

    Feb 28, 2017 · Apt 1

    Open — Nov sent out
  • C

    Abate the nuisance consisting of scalding hot water in the entire apartment located at apt 2fl, 2nd story

    Feb 26, 2017 · Apt 2FL

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2016

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from west at north

    Nov 22, 2016 · Apt 2NDFL

    Closed — Violation closed
  • C

    Provide temporarty seal up of all accessible openings on the building

    Feb 19, 2015

    Closed — Violation closed
  • A

    Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Feb 9, 2015

    Closed — Violation closed
  • C

    Provide adequate supply of cold water for the fixtures at all apartment fixture located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • C

    Provide adequate supply of hot water for the fixtures at all apartment fixture located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from east at south located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from east located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from east located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Open — Not complied with
  • B

    Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Open — Not complied with
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story

    Feb 6, 2015 · Apt 2

    Open — Not complied with
  • A

    Refit apt. # 2 wood door in the entrance located at apt 2, 1st story

    Feb 6, 2015 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Jan 22, 2015 · Apt 2

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures ,, in the 2nd room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood frame to entrance door of the building , 1st story

    Jan 6, 2015

    Open — Not complied with
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Open — Not complied with
  • B

    Provide a safe and adequate supply of electric service to the fixtures in the 3rd room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at the closet ceiling in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective cracked 1st,2nd and 3rd up from bottom concrete steps at front areaway

    Jan 6, 2015

    Open — Not complied with
  • B

    Properly repair with similar material the broken or defective concrete landing at front areaway

    Jan 6, 2015

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures .. in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Closed — Violation closed
  • C

    Abate the nuisnace consisting of rodents (rats) at front areaway

    Jan 6, 2015

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the skylight in the bathroom located at apt 2fl, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2FL

    Open — Not complied with
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, apartment at south

    Jan 6, 2015 · Apt 2

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak thru the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Open — Not complied with
  • C

    Abate the nuisnace consisting of rodents (rats) at front areaway

    Jan 2, 2015

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Open — Not complied with
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 3rd room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 2nd room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Closed — Violation closed
  • B

    Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south

    Jan 2, 2015 · Apt 2FL

    Closed — Violation closed

DOB building violations · 0

No DOB violations on record

ECB violations · 8

  • Hazardous

    Failure to maintain.noted:entrance steps all severely cracked creatinga trip hazard.chimneys are leaning out of plumb with missing bricks & spalling masonry, joints. remedy:make all repairs/make it safe.

    Jun 9, 2006 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain:defect noted:main entrance steps all severely cracked creating a trip hazard.chimneys are leaning out of plumb with missing brick & spalling masonry joints.remedy:make all repairs/make safe

    Jan 4, 2006 · Penalty $10,000

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by bldg dept records, two family (2)private dwelling being use as multiple dwelling 1st and 2nd stories apts, being use as rooming unit eight (8) rooms being rented separtely.

    Nov 30, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain: defect noted-1)main entry steps are severely cracked creating a trip hazard. 2)chimney has missing,spalling,brick & masonry joints. remedy: make all repairs//make safe

    Aug 18, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain exterior building wall note a large hole approximately 18'in diameter has opened i nthe floor of the rear deck the deck is at the first level this the hole is permitting rain /snow to enter

    Apr 7, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain note on the 2nd floor in the front room a large section of the plaster has fallen of the lath work of the wall and ceiling the lath work and wooden beams are this exposed without any fire pr

    Apr 7, 2005 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain.defect is:1)at second floor front room is missing drywall throughout leaving wood beams exposed without any fire profing.2)at 1st floor apartment the bathroom floor is missing entirely.3)at

    Dec 1, 2004 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work without a permit work noted cosntruction of a 13footx20foot wood extension of first story at rear of premises remedy obtian permit if feasible or restore premises to prior legal condition

    Nov 27, 1998 · Penalty $250

    Resolve

Complaints

  • Water leak

    Slow leak

    Mar 18, 2026 · Apt 1

    Close
  • Paint/plaster

    Wall

    Mar 18, 2026 · Apt 1

    Close
  • Plumbing

    Toilet

    Mar 18, 2026 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Mar 18, 2026 · Apt 1

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2023 · Apt 1

    Close
  • Electric

    No lighting

    May 30, 2017 · Apt PH

    Close
  • Appliance

    Refrigerator

    May 30, 2017 · Apt PH

    Close
  • Unsanitary condition

    Pests

    May 30, 2017 · Apt PH

    Close
  • Electric

    Power outage

    Apr 24, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 23, 2017 · Apt 2FL

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Nov 18, 2016 · Apt 2NDFL

    Close
  • Unsanitary condition

    Pests

    Nov 18, 2016 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2016 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2015 · Apt 2NDFL

    Close
  • Heat/hot water

    Apartment only

    Dec 30, 2015 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2015 · Apt 2NDFL

    Close
  • Electric

    No lighting

    Mar 2, 2015 · Apt FLR2

    Close
  • Plumbing

    Water supply

    Mar 2, 2015 · Apt FLR2

    Close
  • Door/window

    Door

    Mar 2, 2015 · Apt FLR2

    Close
  • Unsanitary condition

    Pests

    Mar 2, 2015 · Apt FLR2

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2015 · Apt FLR2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 19, 2015 · Apt BLDG

    Close
  • Electric

    Power outage

    Jan 30, 2015 · Apt 2FL

    Close
  • Electric

    Outlet/switch

    Jan 30, 2015 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2015 · Apt 2FL

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2015 · Apt 2FL

    Close
  • Door/window

    Door

    Jan 17, 2015 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Jan 17, 2015 · Apt 2

    Close
  • Water leak

    Slow leak

    Jan 17, 2015 · Apt 2

    Close
  • Water leak

    Slow leak

    Jan 17, 2015 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2015 · Apt 2

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 17, 2015 · Apt 2

    Close
  • Electric

    No lighting

    Jan 17, 2015 · Apt 2

    Close
  • Water leak

    Heavy flow

    Jan 17, 2015 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2015 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2015 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2015 · Apt 2

    Close
  • Water leak

    Slow leak

    Jan 2, 2015 · Apt 2FL

    Close
  • Plumbing

    Radiator

    Jan 2, 2015 · Apt 2FL

    Close
  • Door/window

    Door frame

    Jan 2, 2015 · Apt 2FL

    Close
  • Water leak

    Slow leak

    Jan 2, 2015 · Apt 2FL

    Close
  • Water leak

    Slow leak

    Jan 2, 2015 · Apt 2FL

    Close
  • Electric

    No lighting

    Jan 2, 2015 · Apt 2FL

    Close
  • Flooring/stairs

    Floor

    Jan 2, 2015 · Apt 2FL

    Close
  • Unsanitary condition

    Pests

    Jan 2, 2015 · Apt 2FL

    Close
  • Appliance

    Electric/gas range

    Jan 2, 2015 · Apt 2FL

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2014 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2014 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Dec 7, 2014 · Apt 2FL

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
1901
Floors
2
Residential units
2
Building area
2,236 ft²
Lot area
2,030 ft²
Zoning
R7-1
Community board
202
Council district
17
Block / lot
2687 / 22
Assessed value
$55,320
Landmark / historic district
No

HPD registration #712280, last renewed Jul 17, 2026.

Questions about 882 East 156 Street

Who owns 882 East 156 Street?

The owner of record in NYC Department of City Planning PLUTO data is Emma Group LLC.

Does 882 East 156 Street have violations?

Yes. NYC HPD has recorded 77 housing violations at this property.

Is 882 East 156 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 882 East 156 Street built?

City records list 1901 as the year it was built.

How many apartments are in 882 East 156 Street?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.