882 East 156 Street
Bronx, NY 10455BBL 2-02687-0022Map
Owner of record: Emma Group LLC
882 East 156 Street is a two-family home built in 1901 in Bronx, 10455. It has 2 residential units across 2 floors. The owner of record is Emma Group LLC. HPD has recorded 77 housing violations here, most recently on March 19, 2026. 19 of the 50 most recent violations are still open.
- HPD violations
- 77
- DOB violations
- 0
- ECB violations
- 8
- HPD complaints
- 272
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 77
- CImmediately hazardous
Properly repair the source and abate the evidence of a water leak active drip at ceiling in the 6th room from north located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from south at west original violation 18721743 issued 19-mar-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Mar 19, 2026 · Apt 1
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective missing/broken (ceramic wall tiles) at east wall (bathtub) in the bathroom located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective missing/broken (cement board) at east wall(bathtub) in the bathroom located at apt 1, 1st story, 2nd apartment from south at west
Mar 19, 2026 · Apt 1
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2018
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical light switch cover plate in the bathroom located at apt 2, 2nd story
Feb 28, 2017 · Apt 2
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and wall. in the kitchen located at apt 2, 2nd story
Feb 28, 2017 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling. in the kitchenette located at apt 1, 1st story
Feb 28, 2017 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles. in the kitchenette located at apt 1, 1st story
Feb 28, 2017 · Apt 1
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of scalding hot water in the entire apartment located at apt 2fl, 2nd story
Feb 26, 2017 · Apt 2FL
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2016
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2ndfl, 2nd story, 1st apartment from west at north
Nov 22, 2016 · Apt 2NDFL
Closed — Violation closed - CImmediately hazardous
Provide temporarty seal up of all accessible openings on the building
Feb 19, 2015
Closed — Violation closed - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Feb 9, 2015
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures at all apartment fixture located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at all apartment fixture located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 1st room from east at south located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 3rd room from east located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the 2nd room from east located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Open — Not complied with - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Open — Not complied with - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2, 2nd story
Feb 6, 2015 · Apt 2
Open — Not complied with - ANon-hazardous
Refit apt. # 2 wood door in the entrance located at apt 2, 1st story
Feb 6, 2015 · Apt 2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Jan 22, 2015 · Apt 2
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures ,, in the 2nd room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood frame to entrance door of the building , 1st story
Jan 6, 2015
Open — Not complied with - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Open — Not complied with - BHazardous
Provide a safe and adequate supply of electric service to the fixtures in the 3rd room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at the closet ceiling in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked 1st,2nd and 3rd up from bottom concrete steps at front areaway
Jan 6, 2015
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective concrete landing at front areaway
Jan 6, 2015
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents (rats) at front areaway
Jan 6, 2015
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the skylight in the bathroom located at apt 2fl, 2nd story, apartment at south
Jan 6, 2015 · Apt 2FL
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, apartment at south
Jan 6, 2015 · Apt 2
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak thru the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Open — Not complied with - CImmediately hazardous
Abate the nuisnace consisting of rodents (rats) at front areaway
Jan 2, 2015
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 4th room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Open — Not complied with - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 3rd room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 2nd room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Closed — Violation closed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceilings & wall outlets thru-out in the 1st room from east at south located at apt 2fl, 2nd story, apartment at south
Jan 2, 2015 · Apt 2FL
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 8
- Hazardous
Failure to maintain.noted:entrance steps all severely cracked creatinga trip hazard.chimneys are leaning out of plumb with missing bricks & spalling masonry, joints. remedy:make all repairs/make it safe.
Jun 9, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to maintain:defect noted:main entrance steps all severely cracked creating a trip hazard.chimneys are leaning out of plumb with missing brick & spalling masonry joints.remedy:make all repairs/make safe
Jan 4, 2006 · Penalty $10,000
Resolve - Hazardous
Occupancy contrary to that allowed by bldg dept records, two family (2)private dwelling being use as multiple dwelling 1st and 2nd stories apts, being use as rooming unit eight (8) rooms being rented separtely.
Nov 30, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain: defect noted-1)main entry steps are severely cracked creating a trip hazard. 2)chimney has missing,spalling,brick & masonry joints. remedy: make all repairs//make safe
Aug 18, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior building wall note a large hole approximately 18'in diameter has opened i nthe floor of the rear deck the deck is at the first level this the hole is permitting rain /snow to enter
Apr 7, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain note on the 2nd floor in the front room a large section of the plaster has fallen of the lath work of the wall and ceiling the lath work and wooden beams are this exposed without any fire pr
Apr 7, 2005 · Penalty $2,500
Resolve - Hazardous
Failure to maintain.defect is:1)at second floor front room is missing drywall throughout leaving wood beams exposed without any fire profing.2)at 1st floor apartment the bathroom floor is missing entirely.3)at
Dec 1, 2004 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit work noted cosntruction of a 13footx20foot wood extension of first story at rear of premises remedy obtian permit if feasible or restore premises to prior legal condition
Nov 27, 1998 · Penalty $250
Resolve
Complaints
- Water leak
Slow leak
Mar 18, 2026 · Apt 1
Close - Paint/plaster
Wall
Mar 18, 2026 · Apt 1
Close - Plumbing
Toilet
Mar 18, 2026 · Apt 1
Close - Paint/plaster
Ceiling
Mar 18, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Jan 10, 2023 · Apt 1
Close - Electric
No lighting
May 30, 2017 · Apt PH
Close - Appliance
Refrigerator
May 30, 2017 · Apt PH
Close - Unsanitary condition
Pests
May 30, 2017 · Apt PH
Close - Electric
Power outage
Apr 24, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 23, 2017 · Apt 2FL
Close
Show 40 more ↓
- Unsanitary condition
Pests
Nov 18, 2016 · Apt 2NDFL
Close - Unsanitary condition
Pests
Nov 18, 2016 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Nov 18, 2016 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Dec 31, 2015 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Dec 30, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Dec 28, 2015 · Apt 2NDFL
Close - Electric
No lighting
Mar 2, 2015 · Apt FLR2
Close - Plumbing
Water supply
Mar 2, 2015 · Apt FLR2
Close - Door/window
Door
Mar 2, 2015 · Apt FLR2
Close - Unsanitary condition
Pests
Mar 2, 2015 · Apt FLR2
Close - Heat/hot water
Apartment only
Mar 2, 2015 · Apt FLR2
Close - Unsanitary condition
Garbage/recycling storage
Feb 19, 2015 · Apt BLDG
Close - Electric
Power outage
Jan 30, 2015 · Apt 2FL
Close - Electric
Outlet/switch
Jan 30, 2015 · Apt 2FL
Close - Heat/hot water
Apartment only
Jan 24, 2015 · Apt 2FL
Close - Heat/hot water
Entire building
Jan 20, 2015 · Apt 2FL
Close - Door/window
Door
Jan 17, 2015 · Apt 2
Close - Unsanitary condition
Pests
Jan 17, 2015 · Apt 2
Close - Water leak
Slow leak
Jan 17, 2015 · Apt 2
Close - Water leak
Slow leak
Jan 17, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Jan 17, 2015 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Jan 17, 2015 · Apt 2
Close - Electric
No lighting
Jan 17, 2015 · Apt 2
Close - Water leak
Heavy flow
Jan 17, 2015 · Apt 2
Close - Heat/hot water
Apartment only
Jan 15, 2015 · Apt 1
Close - Heat/hot water
Entire building
Jan 8, 2015 · Apt 2NDFL
Close - Heat/hot water
Entire building
Jan 6, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2015 · Apt 2
Close - Water leak
Slow leak
Jan 2, 2015 · Apt 2FL
Close - Plumbing
Radiator
Jan 2, 2015 · Apt 2FL
Close - Door/window
Door frame
Jan 2, 2015 · Apt 2FL
Close - Water leak
Slow leak
Jan 2, 2015 · Apt 2FL
Close - Water leak
Slow leak
Jan 2, 2015 · Apt 2FL
Close - Electric
No lighting
Jan 2, 2015 · Apt 2FL
Close - Flooring/stairs
Floor
Jan 2, 2015 · Apt 2FL
Close - Unsanitary condition
Pests
Jan 2, 2015 · Apt 2FL
Close - Appliance
Electric/gas range
Jan 2, 2015 · Apt 2FL
Close - Heat/hot water
Apartment only
Dec 10, 2014 · Apt 2NDFL
Close - Heat/hot water
Entire building
Dec 8, 2014 · Apt BLDG
Close - Electric
Outlet/switch
Dec 7, 2014 · Apt 2FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 2,236 ft²
- Lot area
- 2,030 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2687 / 22
- Assessed value
- $55,320
- Landmark / historic district
- No
HPD registration #712280, last renewed Jul 17, 2026.
Questions about 882 East 156 Street
Who owns 882 East 156 Street?
The owner of record in NYC Department of City Planning PLUTO data is Emma Group LLC.
Does 882 East 156 Street have violations?
Yes. NYC HPD has recorded 77 housing violations at this property.
Is 882 East 156 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 882 East 156 Street built?
City records list 1901 as the year it was built.
How many apartments are in 882 East 156 Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.