680 Beck Street
Bronx, NY 10455BBL 2-02684-0062Map
Owner of record: Beck St. LLC
680 Beck Street is an elevator apartment building built in 1912 in Bronx, 10455. It has 27 residential units across 5 floors. The owner of record is Beck St. LLC. HPD has recorded 385 housing violations here, most recently on October 16, 2026. 29 of the 50 most recent violations are still open.
- HPD violations
- 385
- DOB violations
- 65
- ECB violations
- 15
- HPD complaints
- 333
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 385
- BHazardous
Properly repair or replace the broken or defective bell-buzzer/intercom at north wall in the foyer located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet floor at east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall, east wall, west wall and ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at wash basin in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, west wall and ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 2nd room from east at south located at apt 3d, 3rd story, 1st apartment from east at south
Oct 16, 2026 · Apt 3D
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Oct 14, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Oct 14, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Oct 14, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Oct 14, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper at public hall, 2nd story
Sep 28, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Sep 18, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective glass pane ( 1 lite) at vestible door , 1st story
Sep 18, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective glass pane ( 1 lite) at building entrance door , 1st story
Sep 18, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock and assembly at building entrance door at lobby, 1st story
Sep 11, 2026
Open — Nov certified on time - ANon-hazardous
§ 62 m/d law rearrange television and/or radio antenna to be at least 10 feet above roof and not attached to any fire escape or soil or vent line tv antena at 4th story balcony at north exterior wall
Aug 2, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective latch and assembly's at vestibule to public hall door , 1st story
Jul 15, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vewstibule to public hall door , 1st story
Jul 15, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of cones holding street to vestibule door open , 1st story
Jul 15, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly's at street to vestibule door , 1st story
Jul 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at street to vestibule door , 1st story
Jul 3, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... yard
Jun 20, 2026
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the construction debris at basement
Jun 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Jun 20, 2026
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at dropings yard
Jun 20, 2026
Open — Defect letter issued - BHazardous
Abate the nuisance consisting of pests. evidence of flies yard
Jun 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughtout in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story
Jun 10, 2026
Closed — Violation closed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard
Jun 10, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in water closet bowl in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective connection drain pipe at bathtub in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Jun 10, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and its assembly at building entrance door from vestibule to public hall at public hall, 1st story
Feb 10, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set and its assembly at building entrance door from street to vestibule at public hall, 1st story
Feb 10, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door from vestibule to public hall at public hall, 1st story
Feb 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door from street to vestibule at public hall, 1st story
Feb 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and its assembly at staircase door leading to basement at public hall, 1st story
Feb 10, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at staircase door leading to basement at public hall, 1st story
Feb 10, 2026
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at boiler room
Jan 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Jan 26, 2026 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Jan 5, 2026 · Apt 1E
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1e, 1st story, 1st apartment from south at west
Jan 5, 2026 · Apt 1E
Open — Nov sent out
DOB building violations · 65
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Dec 17, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 27, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2017
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 21, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 30, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 7, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 13, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 3, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
2p5216
Jul 25, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 15
- Class - 2
Summons issued for failure to maintain due cracked and missing brick at right side of window at the 5th floor level, repair and/or replace
Jun 15, 2026
Resolve - Class - 2
Remove water from pit, ensure pump is working properly.
Jul 6, 2021 · Penalty $312
Resolve - Class - 1
97x17,99m07,98bb05,56y13,60b10,42q03,68b07,61t07,59m05-return to service aggravated 1 as per 1rcny.the only device in the building remains out of service creating hazardous condition for tenants,visitor and eme
Sep 3, 2019
Resolve - Class - 1
97x10 failure to maintain building in code compliant manner: service equipment elevator per bc 5001; 2; 27-987. dob records shows the only elevator device in building is active. upon inspection the device is
Aug 7, 2019
Resolve - Class - 1
97-x-17 upon inspection the device is found to be out of service creating a hazardous condition as oer 1rcny 11-02 remedy:restore to service immediately and notify nyc dob the device has been returned to servic
Jul 17, 2019 · Penalty $1,250
Resolve - Class - 1
97x10 failure to maintain building in code-compliant manner: service equipment. elevator per bc 3001.2:27 987 dob records shows the only elevator device in building as active. upon inspection the device is
Feb 27, 2019
Resolve - Class - 2
8v1;64t7;70o2:floor stops not level-adjust;nyc device # not labeled in car-provide.
Nov 21, 2017
Resolve - Class - 1
07l10,10h11,08v01,17h11,41d06. 07l- repair safety edge call dob elevator division fore reinspection 212-566-5544.
Apr 5, 2010 · Penalty $1,000
Resolve - Class - 2
17h7.41d6.17h7. provide new gibs 1st,2nd, fls as needed 41d6 secure door
Sep 4, 2009 · Penalty $250
Resolve - Class - 2
08v1015m0717h1170o0239o0298bb0540p16. 08v10 adjust flr stops were needed. 17h11 hoistway doors gibs are worn replace were needed. 40p16 provide access to motor room so that a full inspection can be done by this
Jun 12, 2009
Resolve
Show 5 more ↓
- Hazardous
08v,15l,15r,16h,22m,22l,39h,37u,50u,35o,48b. not self closing, car top run box, city id tags call 212-312-8732 when returning to service.
Oct 30, 1998 · Penalty $2,500
Resolve - Non-hazardous
74x. restore elevator service so proper inspection can be made by thisdept.
Oct 4, 1996
Resolve - Non-hazardous
02l,14m,35p,57z ,43#. 43 install pump in pit if non is already
Aug 21, 1995
Resolve - Non-hazardous
14m,15r,(15)remove dead bolt from basement door.
Apr 6, 1992
Resolve - Non-hazardous
14m,01l,57o,57z
May 28, 1991 · Penalty $1,000
Resolve
Complaints
- Paint/plaster
Ceiling
Oct 19, 2026 · Apt 5E
Close - Paint/plaster
Wall
Oct 19, 2026 · Apt 5E
Close - Plumbing
Basin/sink
Oct 16, 2026 · Apt 2D
Open - Plumbing
Bathtub/shower
Oct 16, 2026 · Apt 2D
Open - Unsanitary condition
Pests
Oct 6, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Oct 6, 2026 · Apt 1E
Close - Plumbing
Basin/sink
Oct 6, 2026 · Apt 1E
Close - Plumbing
Bathtub/shower
Oct 6, 2026 · Apt 1E
Close - Heat/hot water
Apartment only
Oct 6, 2026 · Apt 1E
Close - Unsanitary condition
Garbage/recycling storage
Sep 28, 2026 · Apt 3D
Close
Show 40 more ↓
- Heat/hot water
Entire building
Sep 28, 2026 · Apt 3D
Close - Safety
Smoke detector
Sep 28, 2026 · Apt 3D
Close - Unsanitary condition
Pests
Sep 28, 2026 · Apt 3D
Close - Plumbing
Bathtub/shower
Sep 28, 2026 · Apt 3D
Close - General
Bell/buzzer/intercom
Sep 28, 2026 · Apt 3D
Close - General
Cabinet
Sep 28, 2026 · Apt 3D
Close - Paint/plaster
Wall
Sep 28, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Sep 25, 2026 · Apt 1E
Close - Plumbing
Basin/sink
Sep 22, 2026 · Apt 1E
Close - General
Cabinet
Sep 22, 2026 · Apt 1E
Close - Plumbing
Bathtub/shower
Sep 22, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 22, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1E
Close - General
Cabinet
Sep 14, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 1E
Close - General
Ventilation system
Jul 20, 2026 · Apt 1E
Close - Door/window
Door
Jul 8, 2026 · Apt BLDG
Close - Elevator
Maintenance
Jun 15, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 5A
Close - Unsanitary condition
Garbage/recycling storage
Jun 15, 2026 · Apt 5A
Close - Unsanitary condition
Pests
May 27, 2026 · Apt 5C
Close - Unsanitary condition
Pests
May 12, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
Feb 22, 2026 · Apt 1E
Close - Plumbing
Basin/sink
Feb 22, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Feb 22, 2026 · Apt 1E
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Feb 4, 2026 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1912
- Floors
- 5
- Residential units
- 27
- Building area
- 21,150 ft²
- Lot area
- 6,776 ft²
- Zoning
- R7-1
- Community board
- 202
- Council district
- 17
- Block / lot
- 2684 / 62
- Assessed value
- $861,750
- Landmark / historic district
- No
HPD registration #202896, last renewed Aug 20, 2025.
Questions about 680 Beck Street
Who owns 680 Beck Street?
The owner of record in NYC Department of City Planning PLUTO data is Beck St. LLC.
Does 680 Beck Street have violations?
Yes. NYC HPD has recorded 385 housing violations at this property.
Is 680 Beck Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 680 Beck Street built?
City records list 1912 as the year it was built.
How many apartments are in 680 Beck Street?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.