roofy

777 Prospect Avenue

Bronx, NY 10455BBL 2-02676-0073Map

Owner of record: Westchester Plaza LLC

777 Prospect Avenue is a walk-up apartment building built in 1915 in Bronx, 10455. It has 4 residential units across 3 floors. The owner of record is Westchester Plaza LLC. HPD has recorded 194 housing violations here, most recently on April 30, 2026. 44 of the 50 most recent violations are still open.

HPD violations
194
DOB violations
1
ECB violations
8
HPD complaints
106

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 194

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall

    Sep 27, 2025

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at 1st story at public hall

    Sep 27, 2025

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing at 1st story

    Sep 27, 2025

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall

    Sep 27, 2025

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Sep 27, 2025

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at 1st story at public hall

    Sep 27, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 2nd story

    Sep 27, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story

    Sep 27, 2025

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak above the ceiling at public hall, 2nd story

    Sep 27, 2025

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 5th room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective cracked ceramic tiles at floor approximately 4sqft in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective sagging wood subfloor underneath the floor in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 4th room from north at east located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Sep 27, 2025 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department fire retardant material at east and west wall at public hall stairs, 1st story

    Sep 26, 2025

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective heavy duty lock at building entrance door at public hall, 1st story

    Sep 26, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective fire retardant material at east and west wall at public hall stairs, 1st story

    Sep 26, 2025

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective wooden treads 1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17 from the bottom up. at public hall stairs, 1st story

    Sep 26, 2025

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective at south and north wall fire rtardant material at public hall, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color window stool at west wall in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles treads bottom, up at public hall stairs, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective handrail from 1st floor to 2nd floor at public hall stairs, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at south and north fire retardant material at public hall, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective at ceiling fire retardant material at public hall, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling fire retardant material at public hall, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective concrete tread at court, 1st story

    Mar 3, 2025

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at north wall in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color window stool at north wall in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 3, 2025

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at east wall window sill in the 3rd room from east located at apt 2, 2nd story, 1st apartment from south at west

    Mar 3, 2025 · Apt 2

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective cracked 7th concrete tread up from bottom at building front stoop( creating a trip hazard)

    Jan 8, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective cracked 1st concrete tread up from bottom at building front stoop

    Jan 8, 2025

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Dec 10, 2024

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Dec 10, 2024 · Apt 2

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall

    Dec 10, 2024

    Open — Nov sent out
  • B

    Cleanse and disinfect to the satisfaction of this department after removing the heating oil spilled at floor in oil tank storage room and at boiler room

    Dec 10, 2024

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of refrigerator cardboard boxes garbage bags at public hall stairs, 2nd story

    Dec 10, 2024

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Dec 10, 2024 · Apt 2

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Dec 10, 2024 · Apt 2

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of uncapped gas supply pipe in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Dec 10, 2024 · Apt 2

    Open — Nov sent out

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 9, 2011

    Dob violation - active

ECB violations · 8

  • Class - 2

    Failure to comply w/the comm's order to file a cofc w/the dob for openecb nov#34745221l,34891411h,34745221l & 34850866n.rem:comply w/the co mm's order file cofcompliance

    Feb 26, 2011 · Penalty $800

    Resolve
  • Class - 1

    Unlawful acts.failure to comply w/ an order of the commissioner respondent failed to file a cert of correction w/ the dob for open ecb nov#34850866n.occupancy contrary to cert of occupancy.converted class a dwe

    Dec 10, 2010 · Penalty $2,400

    Resolve
  • Class - 1

    Unlawful acts.failure to comply w/ an order of the commissioner.respondent failed to correct conditions in prior nov#34850867p-altered entrance to apts on 1,2,3flrs & converted class 'a' apt to sro's.no permits

    Dec 10, 2010

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by the certificate of occupancy or bldg dept records 3rd story class 'a' apt is now being used as single room occupancy a total of 5-rooms being rented out. rem:discontinue il

    Jul 19, 2010 · Penalty $1,200

    Active
  • Class - 1

    Occupancy contrary to that allowed by the bldg dept records hpd records indicating bldg occupancy as 3family #214691 multiple dwelling registration present occupancy created 4 illegal single rooms occupancy at

    Jun 4, 2010 · Penalty $2,400

    Active
  • Class - 1

    Work w/o a permit. work noted: erected illegal partitions at 3,2,1st flrs of bldg creating 10 sros (total) w/4 sros at 3rd flr, 3 sros at 2nd flr 3 sros at 1st flr and relocated entry doors to apts at every

    Jun 4, 2010

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by the cert of occupancy or bldg. dept records, bsmt converted from ordinary use into a class "a" apt w/full kit and bath, thereby increasing bldg occupancy. rem: discontinue

    Feb 17, 2010 · Penalty $2,400

    Active
  • Non-hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families department records. from legal occupancy: (3) three family dwelling to illegal occupancy 2ndfloor one s.r.o 1s

    Aug 27, 2003 · Penalty $4,900

    Active

Complaints

  • Plumbing

    Toilet

    Sep 25, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    Sep 25, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Sep 25, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Aug 20, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Aug 20, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Apr 12, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2025 · Apt 2

    Close
  • Water leak

    Slow leak

    Mar 2, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Mar 2, 2025 · Apt 2

    Close
  • Flooring/stairs

    Stairs

    Mar 2, 2025 · Apt STAIRS

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 6, 2025 · Apt 2NDFLO

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2024 · Apt SECOND

    Close
  • Door/window

    Door

    Dec 9, 2024 · Apt SECOND

    Close
  • Door/window

    Window pane

    Dec 9, 2024 · Apt SECOND

    Close
  • Flooring/stairs

    Floor

    Dec 9, 2024 · Apt SECOND

    Close
  • Safety

    Smoke detector

    Dec 9, 2024 · Apt SECOND

    Close
  • Paint/plaster

    Wall

    Nov 18, 2024 · Apt 2NDFL

    Close
  • Unsanitary condition

    Pests

    Nov 18, 2024 · Apt 2NDFL

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2024 · Apt 2NDFL

    Close
  • Flooring/stairs

    Floor

    Nov 18, 2024 · Apt 2NDDLO

    Close
  • Door/window

    Door

    Nov 18, 2024 · Apt 2NDFL

    Close
  • Plumbing

    Toilet

    Nov 18, 2024 · Apt 2NDFL

    Close
  • Water leak

    Slow leak

    Feb 13, 2023 · Apt FL

    Close
  • Heat/hot water

    Apartment only

    Feb 13, 2023 · Apt FL

    Close
  • Electric

    No lighting

    Sep 11, 2020 · Apt 1

    Close
  • Appliance

    Electric/gas range

    Apr 12, 2019 · Apt 2

    Close
  • Appliance

    Electric/gas range

    Apr 12, 2019 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Apr 12, 2019 · Apt 2

    Close
  • Water leak

    Damp spot

    Apr 12, 2019 · Apt 2

    Close
  • Water leak

    Slow leak

    Apr 12, 2019 · Apt 2

    Close
  • Unsanitary condition

    Pests

    Apr 12, 2019 · Apt 2

    Close
  • Paint/plaster

    Wall

    Apr 12, 2019 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Apr 12, 2019 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Dec 1, 2018 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Dec 1, 2018 · Apt 2

    Close
  • Unsanitary condition

    Mold

    Dec 1, 2018 · Apt 2

    Close
  • Water leak

    Heavy flow

    Dec 1, 2018 · Apt 2

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2018 · Apt 1

    Close
  • Plumbing

    Radiator

    Nov 20, 2012 · Apt 2

    Close
  • General

    Mold

    Nov 20, 2012 · Apt 2

    Close
  • General

    Mold

    Nov 20, 2012 · Apt 2

    Close
  • Heating

    Heat related

    Dec 30, 2010 · Apt 1

    Close
  • Electric

    Electric-supply

    Jul 18, 2010 · Apt 3

    Close
  • Electric

    Electric-supply

    Jul 9, 2010 · Apt BLDG

    Close
  • General

    Locks

    Feb 16, 2010 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Feb 16, 2010 · Apt BSMT

    Close
  • Paint/plaster

    Ceiling

    Feb 16, 2010 · Apt BSMT

    Close
  • Heating

    Heat related

    Feb 16, 2010 · Apt BSMT

    Close
  • Plumbing

    Sewer

    Feb 16, 2010 · Apt BSMT

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C3)
Year built
1915
Floors
3
Residential units
4
Building area
3,078 ft²
Lot area
2,000 ft²
Zoning
R6
Community board
201
Council district
17
Block / lot
2676 / 73
Assessed value
$269,550
Landmark / historic district
No

HPD registration #214691, last renewed Jul 18, 2025.

Questions about 777 Prospect Avenue

Who owns 777 Prospect Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Westchester Plaza LLC.

Does 777 Prospect Avenue have violations?

Yes. NYC HPD has recorded 194 housing violations at this property.

Is 777 Prospect Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 777 Prospect Avenue built?

City records list 1915 as the year it was built.

How many apartments are in 777 Prospect Avenue?

It has 4 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.