695 East 163 Street
Bronx, NY 10456BBL 2-02639-0001Map
Owner of record: NYC Housing Authority
695 East 163 Street is an elevator apartment building built in 1957 in Bronx, 10456. It has 804 residential units across 9 floors. The owner of record is NYC Housing Authority. HPD has recorded 51 housing violations here, most recently on June 16, 2009. 50 of the 50 most recent violations are still open.
- HPD violations
- 51
- DOB violations
- 147
- ECB violations
- 71
- HPD complaints
- 6
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 51
- BHazardous
Properly repair the broken or defective lock at door in the entire apartment located at apt 6a, 6th story, 2nd apartment from south at west
Jun 16, 2009 · Apt 6A
Open — Nov sent out - BHazardous
Replace with new the missing cover at electical outlet at north wall in the kitchen located at apt 6a, 6th story, 2nd apartment from south at west
Jun 16, 2009 · Apt 6A
Open — Nov sent out - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 6a, 6th story, 2nd apartment from south at west
Jun 16, 2009 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 6a, 6th story, 2nd apartment from south at west
Jun 16, 2009 · Apt 6A
Open — Nov sent out - BHazardous
Replace with new the missing waste line connection pipe to drain under sink in the kitchen located at apt 6a, 6th story, 2nd apartment from south at west
Jun 16, 2009 · Apt 6A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at kitchen in the kitchen located at apt 4b, 4th story, apartment at east
Apr 19, 2005 · Apt 4B
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the private hallway located at apt 4b, 4th story, apartment at east
Apr 19, 2005 · Apt 4B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the foyer located at apt 4b, 4th story, apartment at east
Apr 19, 2005 · Apt 4B
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective closet door hindges in the foyer located at apt 4b, 4th story, apartment at east
Apr 19, 2005 · Apt 4B
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 4b, 4th story, apartment at east
Apr 19, 2005 · Apt 4B
Open — Nov sent out
DOB building violations · 147
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed
ECB violations · 71
- Class - 1
Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection i observed at ex #3, east elevation at 12th floor and at #4, south elevation at 14th floor, cracked/broken glass wi
Sep 18, 2026 · Penalty $5,000
Active - Class - 1
Failure to maintain building exterior wall(s)or appurtenances.note:at the time of inspection observe at expo#1 west elevation broken window glass at 4th floor level.rem:maintain building exterior wall(s)or appu
Jun 16, 2026 · Penalty $5,000
Resolve - Class - 1
Failure to maintain building facade and appurtenances. note: observed at time of inspection at exposure 1(northeast) an object sits precariously on 9th floor window sill. as well as exposure 4(north) at 14th fl
Apr 30, 2026 · Penalty $5,000
Active - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907708.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907709.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907710.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907711.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907712.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907713.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#907714.remedy:submit acceptable require
Dec 2, 2022 · Penalty $1,250
Resolve
Complaints
- Water leak
Heavy flow
Feb 14, 2025 · Apt 7G
Close - Appliance
Electric/gas range
Sep 25, 2020 · Apt 4G
Close - Plumbing
Basin/sink
Apr 4, 2018 · Apt 3G
Close - Water leak
Heavy flow
Apr 4, 2018 · Apt 3G
Close - Unsanitary condition
Pests
Aug 31, 2015 · Apt 11A
Close - Paint/plaster
Wall
Aug 31, 2015 · Apt 11A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 1957
- Floors
- 9
- Residential units
- 804
- Building area
- 880,000 ft²
- Lot area
- 438,850 ft²
- Zoning
- R6
- Community board
- 203
- Council district
- 17
- Block / lot
- 2639 / 1
- Assessed value
- $20,239,650
- Landmark / historic district
- No
Questions about 695 East 163 Street
Who owns 695 East 163 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC Housing Authority.
Does 695 East 163 Street have violations?
Yes. NYC HPD has recorded 51 housing violations at this property.
Is 695 East 163 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 695 East 163 Street built?
City records list 1957 as the year it was built.
How many apartments are in 695 East 163 Street?
It has 804 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.