roofy

1140 Franklin Avenue

Bronx, NY 10456BBL 2-02613-0001Map

Owner of record: NYC Department Of Homeless Services

1140 Franklin Avenue is a care facility built in 1911 in Bronx, 10456. The owner of record is NYC Department Of Homeless Services. HPD has recorded 11 housing violations here, most recently on November 29, 2017.

HPD violations
11
DOB violations
46
ECB violations
83
HPD complaints
16

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 29, 2017

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • C

    Provide hot water at all hot water fixtures at community bathroom, 4th story

    Nov 29, 2017

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Nov 29, 2017

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl at stalls 1 and 4, at community bathroom, 5th story, section at south

    Jan 9, 2016

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical air vents at ceiling at community bathroom, 5th story, section at south

    Jan 9, 2016

    Closed — Violation closed
  • B

    Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling light fixture, at community bathroom, 5th story, section at south

    Jan 9, 2016

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical air vents at ceiling at community bathroom, 4th story, section at north

    Jan 9, 2016

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl at stalls 2 and 4 at community bathroom, 4th story, section at north

    Jan 9, 2016

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical air vents at community bathroom, 5th story, section at north

    Jan 9, 2016

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at bulkhead ceiling and walls , 6th story, section at south

    Jan 9, 2016

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the bulkhead ceiling and walls , 6th story, section at south

    Jan 9, 2016

    Closed — Violation closed
Show 1 more ↓
  • B

    Properly repair the broken or defective radiator shut off knob at public hall stairs, 5th story, section at north

    Jan 9, 2016

    Closed — Violation closed

DOB building violations · 46

  • Construction other optional

    Ftc w/commissioner's order control#348224 dob#051525pi20303sb dated 05/15/25 requiring owner to submit a corrective action plan w/in 30 days of date of inspection.aso f today 03/20/26 the req'd cap was not rec'd. immed comply w/commissioner's order control#348244 vio#051525pi20303sb

    Mar 20, 2026

    Dob violation - active
  • Construction other optional

    Corrective action plan req'd. obsvd @ exp1 on franklin ave 2 cracked/ spalled window sills on 3fl. @ exp4 on 166 st obsvd 2 cracked glass windows btwn flr 2-3 a vert masonry cracks btwn 2-4. immed retain reg design prof to eval entire bldg & to sumbit corrective action plan to [email protected] w/in 30 days addressing all conitions

    May 15, 2025

    Dob violation - active
  • Construction other optional

    Emergency work order req'd. obsvd severly hazardous contions @ exp4 such as masonry cracks 2 cracked glass windows deteriorated mortar joints @ window stoneheaders & cracked/spalling @ decorative coping stones @ mult locations. immed provide safety measures to secure/prot the public.install s/w shed @ exp4 on 166 st to cover full length

    May 15, 2025

    Dob violation - active
  • Plumbing none

    The dob has issued a notice to revoke laa #240223904 due to failure to comply with laa open issues. all work in connection with this application has been ordered stopped immediately

    Jun 1, 2018

    Dob violation - dismissed
  • Plumbing none

    The borough commissioner has issued a 15 day letter of intent to revok e all sprinkler work under laa #240220499 due to audit objections

    May 2, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 5, 2016

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 24, 2015

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2012 inspection/test

    Mar 31, 2014

    Dob violation - dismissed
Show 36 more ↓
  • Elevator elevatorrequired

    Nyc department of citywide services ipis agency

    Mar 11, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    This pvt replaces pvt 496106

    Dec 17, 2013

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2010 cat 1 insp/tst

    Aug 15, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 9, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Vcat1-elevator annual inspection / test elevatorrequired

    Oct 8, 2010

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 12, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 24, 2007

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 15, 2006

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2005

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Jan 20, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 83

  • Class - 2

    Observed fire department connection cap outside not properly installed with debris inside. plastic piping on 2 and 3 floors on waste lines under the sinks. throughout building not using open ended toilet seats.

    Oct 20, 2025 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1.8 (2014 code); 27-371; bc 1008.1.9 (2014 code); bc 1010.1.8 (2022 code); bc 1010.1.9 (2022 code). at t

    Oct 20, 2025 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. building is a 5story asylum corner lot. observed at exposure 1, 2 cracked window sills between floors 2-3. at exposure 4, on 166 st, observed 2 cracked win

    May 15, 2025 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. denial of access into shelter. cleaning staff stated no one was on site with keys to utility's, roof and exit doors., repair and/or replace

    Apr 2, 2025 · Penalty $1,250

    Resolve
  • Class - 3

    Observed 2 jim caps at hallway on the 2nd floor and 1 installed on the cast iron pipe in the boiler room. as per 102.3 maintenance. installations, both existing and new, and parts thereof shall be maintained in

    Apr 25, 2024 · Penalty $500

    Resolve
  • Class - 2

    -fire stop need on sieling located at (a side) stairwell., provide/maintain fire stopping; provide/maintain fire stopping

    Mar 23, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    Observed active water leak in the boiler room located at basement/cellar ( cast iron storm drain)., repair and/or replace

    Mar 23, 2023 · Penalty $625

    Active
  • Class - 2

    -both emergency exit doors do not self-close located at (a side) stairwell, exposure #1. violation no.39059662z date:04/06/2022, repair/replace door

    Mar 23, 2023 · Penalty $1,562

    Resolve
  • Class - 2

    -signs of water penetration and structural deterioration on walls, ceiling, and on floor located at 4th floor emergency exit corner walls leading to roof, (a side) stairwell/coirridor leading to storage closets

    Mar 23, 2023 · Penalty $1,562

    Active
  • Class - 3

    Observed in basement/cellar and in kitchen jim caps installed on cast iron piping., repair and or replace

    Mar 23, 2023 · Penalty $500

    Resolve
Show 40 more ↓
  • Class - 2

    Flame glass missing-gas regulator vent not capped-prv disch pipes missing, blrs 1 and 2-threads on discharge pipe for prv on hw tank-exposed elect on motorized damper-control covers missing on hw return pipes-n

    Mar 22, 2023 · Penalty $625

    Active
  • Class - 1

    Unsafe unsuitable electrical wiring & equipment in use.observed throughout building exit lights/emergency light not operable even the one at main entrance observed at 1st floor lobby exposed airing tapped from

    May 20, 2022 · Penalty $4,000

    Resolve
  • Class - 2

    Noted: roofing material over "drill room" has become porous at various locations allowing water to enter the building into the "drill room", repair and/or replace

    Apr 6, 2022 · Penalty $625

    Active
  • Class - 2

    Noted: exterior fpsc exit doors at stair "a" (post 3) do not self close properly., repair/replace door

    Apr 6, 2022 · Penalty $625

    Resolve
  • Class - 2

    Noted: observed existing emergency lights on 3rd. floor(approx.90%) and various other locations throughout building were not operational when tested., repair/replace lighting

    Apr 6, 2022 · Penalty $1,562

    Resolve
  • Class - 2

    Noted: observed a crack at exposure #4 exterior bricks at (southeast elevation) going from arch up to the second story., maintain exterior building wall

    Apr 6, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Noted: observed at roof, parapet wall bricks are missing mortar at the joint and coping stones., repair and/or replace

    Apr 6, 2022 · Penalty $625

    Active
  • Class - 2

    Noted: observed at generator room, cracks, spalling and missing cement throughout ceiling., repair and/or replace

    Apr 6, 2022 · Penalty $625

    Active
  • Class - 2

    Noted: observed at main entrance, exterior wall has become porous allowing water to enter into the lobby into small office on the left of entrance doors., repair and/or replace

    Apr 6, 2022 · Penalty $1,562

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner.noted at time ofmy inspection,i observed at cellar level in storage by boxes in sprinkler riim in roof column cracks in masonrywork.no water damage observe

    Jan 21, 2022 · Penalty $3,125

    Active
  • Class - 1

    Unlawful acts.failure to comply w/an order of the commissioner.failureto correct & certify summons ecb#39011944y,ecb#39011945x & ecb#35583878n.an unlawful acts.failure to comply w/code.miscellaneous violation o

    Oct 8, 2021 · Penalty $2,500

    Active
  • Class - 2

    Failure to maintain building in code compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.noted:observed at various locations throughout building,existing emergency l

    Oct 6, 2021 · Penalty $1,562

    Resolve
  • Class - 2

    I observed caps missing from the fdny connection at exposure 1., repair and/or replace

    Oct 6, 2021 · Penalty $625

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances.noted:observed cracks through bricks at exposure#4(south east elevation)over arch up to the 2nd story window.remedy:maintain exterior building wall.

    Oct 6, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.noted:observed at exposure#1,above main entrance(franklin avenue),exterior wall has become porous allowing water to penetrate into building.remedy:repair an

    Oct 6, 2021 · Penalty $625

    Resolve
  • Class - 2

    I observed active water leak in the basement., repair and/or replace

    Oct 6, 2021 · Penalty $625

    Resolve
  • Class - 1

    Reissue:35587055k date of issue:08/18/21 failure to maintain building in code compliant manner.note:at cellar level in storage by boxes al of area.in sprinkler room.in roof, colum craks in masonry work no water

    Oct 1, 2021 · Penalty $3,125

    Active
  • Class - 1

    Reissue 35558025r failure to maintain building in code compliant manner.note:at cellar level in storage/sprinkler room cracks in masonry ceiling with evidence of water damage to stored material.remedy:repair a

    Aug 18, 2021 · Penalty $3,125

    Active
  • Class - 1

    An unlawful act - failure to comply with an order of the commissioner.failure to correct and certify summons #39011945x. remedy: comply withec code

    Jul 31, 2021 · Penalty $2,500

    Active
  • Class - 1

    Unlawful acts. failure to comply with commissioners orders. records indicate no app was made to correct or certify ecb #39011944y & 39011945x. remedy: comply with commissioners orders

    Jul 3, 2021 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner.note:at cellar levelin storage -sprinkler room cracks in masonry ceiling w/evidence of water damage.remedy:repair &/or replace.

    Jun 28, 2021 · Penalty $3,125

    Active
  • Class - 1

    An unlawful act-failure to comply with an order of the commissioner.failure to correct and certify summons #353600872.remedy:comply with ec code.

    Jun 5, 2021 · Penalty $12,500

    Active
  • Class - 1

    Failure to maintain building in ocde compliant manner at the time of my inspection noted at (ground) floor storage room multiple cracks in masonry ceiling with evidence of water penetration comply with code

    May 21, 2021 · Penalty $3,125

    Active
  • Class - 1

    Unlawful acts.failure to comply with order of the commisioner.records indicate no application was made to certify and correct ecb #35360049h.remedy:comply with commissioner's orders

    May 5, 2021 · Penalty $2,500

    Active
  • Class - 1

    Restore device to service so that inspection can be made by this department.

    Apr 1, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building in code-compliant manner. noted at time of inspection observed at cellar level storage room deteriorating ceiling and excessive storage creating a fire hazard. remedy:repair/replace

    Mar 31, 2021 · Penalty $3,125

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner. noted:at time of my inspection i observed at the cellar level a room full w/ boxes offiles throughout the entire area,which is fire hazard,also observed an

    Feb 11, 2021 · Penalty $3,125

    Resolve
  • Class - 3

    Found circulating pump leaking in boiler room.

    Dec 14, 2020 · Penalty $500

    Active
  • Class - 1

    Failure to maintain building in code-compliant manner.note:at time of inspection, observed at cellar level room on right side of loading dock area full of boxes with files.the arched masonry ceiling & columns a

    Sep 10, 2020 · Penalty $3,125

    Resolve
  • Class - 1

    Unlawful acts failure to comply w/ commissioners order. records indicate no application was made to correct or certify ecb #'s 35360049h, 39011944y, 39011945x and 35360087z. remedy:comply w/ commissioners order

    Mar 27, 2020 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain bldg in code compliant manner. observed in basement lvl a room @the right of the loading dock with box fullof dtored file. the arched masonry ceiling & columns crack & loose mortar in need

    Mar 13, 2020 · Penalty $3,125

    Active
  • Class - 1

    An unlawful act.failure to comply with an order of the commissioner.failure to correct and certify summons #35360049h,39011944y,and 39011945x.rem:comply with ec code/obtain permit.

    Feb 4, 2020 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner. noted:at time of inspection i observed at cellar level several room cement columns have cracks or missing cement also cement arched ceiling has crack throu

    Jan 13, 2020 · Penalty $3,125

    Active
  • Class - 1

    Unlawful acts. failure to comply w/ an order of the commissioner. in 11/12/19,2 electrical vios was issue to the respondent. the respondent failed to comply w/ (nyc)electrical code#400.8,250.4 (ecb's)#39011944y

    Dec 19, 2019 · Penalty $2,500

    Active
  • Class - 1

    Failure to maintain building in code compliant manner. note at cellar level file/archive room several cement columns have crack or missing cement also cement arched ceiling has cracks throughout entire room. re

    Nov 26, 2019 · Penalty $3,125

    Active
  • Class - 1

    I observed in the cellar the grounding electrode conductor water clamp extremely deteriorated to the point of disrepair. grounding electrode conductor water clamp is currently not serving its intended purpose.

    Oct 29, 2019 · Penalty $4,800

    Active
  • Class - 2

    I observed in the commercial kitchen, regular duplex receptacles that are not gfci protected, install gfc1 protection

    Oct 29, 2019 · Penalty $2,400

    Active
  • Class - 2

    I observed on exposure 4, step cracks on the facade from the door arch past the window, splitting bricks, maintain exterior building wall

    Oct 29, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    I observed in the recreation room and kitchen, flexible extension cords being used as a permanent wiring method powering appliances. violating section 400.8 in the national electrical code ; 400.8, comply with

    Oct 29, 2019 · Penalty $1,600

    Active
  • Class - 2

    I observed on exposure 3 electrical conduit body missing its cover with exposed electrical wires, in the kitchen missing cover on wiremold connector, in the cellar i observed a broken energized light bulb still

    Oct 29, 2019 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Apr 19, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 18, 2015 · Apt 3RDFLR

    Close
  • Heating

    Heat related

    Nov 24, 2013 · Apt NA

    Close
  • Nonconst

    Vermin

    Jun 4, 2013 · Apt BLDG

    Close
  • Heating

    Heat related

    Mar 29, 2011 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Aug 8, 2010 · Apt 3FL

    Close
  • Heating

    Heat related

    Jan 30, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Jan 3, 2010 · Apt BLDG

    Close
  • General

    Mold

    Jan 3, 2010 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 11, 2009 · Apt 1

    Close
Show 6 more ↓
  • Heating

    Heat related

    Nov 19, 2009 · Apt 4FLR

    Close
  • Nonconst

    Vermin

    Nov 19, 2009 · Apt 4FLR

    Close
  • Heating

    Heat related

    Nov 23, 2007 · Apt 1

    Close
  • Heating

    Heat related

    Jan 13, 2007 · Apt 4FL

    Close
  • Plumbing

    Toilet

    Jan 13, 2007 · Apt 4FL

    Close
  • Heating

    Heat related

    Dec 29, 2006 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Care facility (N2)
Year built
1911
Floors
6
Residential units
—
Building area
97,000 ft²
Lot area
64,340 ft²
Zoning
R6
Community board
203
Council district
17
Block / lot
2613 / 1
Assessed value
$4,062,600
Landmark / historic district
INDIVIDUAL LANDMARK

Questions about 1140 Franklin Avenue

Who owns 1140 Franklin Avenue?

The owner of record in NYC Department of City Planning PLUTO data is NYC Department Of Homeless Services.

Does 1140 Franklin Avenue have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 1140 Franklin Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1140 Franklin Avenue built?

City records list 1911 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.