roofy

307 Bruckner Boulevard

Bronx, NY 10454BBL 2-02570-0018Map

Owner of record: Sclp I Bruckner, LLC

307 Bruckner Boulevard is a warehouse built in 2025 in Bronx, 10454. The owner of record is Sclp I Bruckner, LLC. HPD has no housing violations on record for this property.

HPD violations
0
DOB violations
15
ECB violations
12
HPD complaints
0

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
No HPD violations

HPD has not cited this building.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 0

No HPD violations on record

DOB building violations · 15

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 10, 2024

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Install/repair approximately 25 feet of construction fence @ exposure 1 to safeguard the public

    Sep 29, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - dismissed
  • Structurally compromised building none

    Failure to submit an acceptable inspectn rpt for structurally compromised bldg.

    Sep 14, 2022

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    May 29, 2020

    Dob violation - dismissed
  • Construction other optional

    Emergy work:bldg suffered a 3-alarm fire on 5/4/20 & a portn sustained strctl dmg.apprx 95% roof collap @307 portion of bldg.(aprx 75'w x140' d)area at so.end bldg.exp1 wall along bruckner unbraced by roof collap immd instl t-brd fen @exp1 along entire portn of unbraced wall enclose approx 10'of sidewalk from bldg face.file permit w/in 2 business days

    May 5, 2020

    Dob violation - dismissed
  • Construction other optional

    Ftm:apprx 75'w x140'd portion of bldg at so.end suffer a 3-alarm fire on 5/4/20(307).apprx 95% of roof collap&excessive debris on 1flr.exp1 wall along bruckner blvd left unbraced at roof collapse.masn dmge and missing at top of walls.nyspe to immed evaluate entire bldg.repr bldg undr permit per pe.file by 6/15/20.start by 7/7/20.signoff by 10/9/20

    May 5, 2020

    Dob violation - dismissed
  • Construction other optional

    Ftm:exp 3(rear) wall at loading dock has deteriorated water proofing, cracks,and deteriorated cmu masonry.exp4 wall(along east 141street)has cracks,deteriorated cmu,and offset cmu masonry.nys pe to evaluate all exterior walls immediately.provide repr's under permit per pe.file for reprs by 7/7/20.strt wrk undr prmt by 7/21/20.signoff prmt by 10/9/20

    May 5, 2020

    Dob violation - dismissed
  • Construction other optional

    .due to fire

    May 4, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2019

    Dob violation - dismissed
Show 5 more ↓
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 19, 2001

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 22, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Apr 23, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Apr 23, 1993

    Dob violation - dismissed

ECB violations · 12

  • Class - 1

    Observed closed site with jersey barrier not maintained as per manufacturer specifications. jersey barriers were not filled or interlocked a multiple locations. these conditions are unsafe to pedestrians. barr

    Sep 25, 2026 · Penalty $2,500

    Active
  • Class - 2

    Bc3303.3 watchperson. observed 2 story nb @ a foot print of approx. 98,000 square feet with no work in-progress at time of inspection. walked the perimeter of jobsite to find and locate the competent watchperso

    Oct 29, 2025 · Penalty $2,500

    Resolve
  • Class - 2

    2 story warehouse, active site at support of excavation phase. observed temporary shoring/bracing attached to adjoining property within the site at exp#3.upon review of plans no details/mention on plans.at exp#

    Jul 9, 2025

    Resolve
  • Class - 2

    Exp1,2 yodocs not installed to manufacture specs per bc3301.1.3 and dot stipulations missing water or sand filled,locking components and missing ramp for handicapped accessibility per bc3307.2.6 at exp2 of temp

    Jun 17, 2025 · Penalty $2,400

    Resolve
  • Class - 2

    Active jobsite with demolition operation. i observed existing 1st floor level use to stored material, debris, demo machinery, equipment in operation including stored wood planks. upon request for rdp evaluation

    May 9, 2024

    Resolve
  • Class - 1

    Active jobsite under full demolition. i observed use of mechanical equipment for demolition operation and removal of existing exterior wall exposure 1 close to bruckner boulevard. no sidewalk shed provided wher

    May 9, 2024

    Resolve
  • Class - 2

    Active jobsite under full & mechanical demolition. i observed demolition operation on going with missing const. fence in place at exposure 3. code stipulate fence shall be maintained throughout the duration of

    May 9, 2024

    Resolve
  • Class - 2

    Active jobsite under full demolition with mechanical means. i observed demolition of existing wall in place at exposure 2 of adjoining yard for car park with no adequate safety measures (overhead protection) pr

    May 9, 2024

    Resolve
  • Class - 2

    Active jobsite under full mechanical demolition. during inspection i observed trees in places at perimeters behind construction fence with no adequate tree protection as per department of parks and recreation a

    May 9, 2024

    Resolve
  • Class - 2

    Temporary construction equipment on site- epired permit. at time of inspection the construction fence that is erected at property has a permit that expired in june 2022. there are no renewals on file for fence.

    Sep 28, 2023 · Penalty $1,250

    Resolve
Show 2 more ↓
  • Class - 2

    Jobsite fence not constructed or maintained pursuant to subsection. at time of inspection approximately 25 linear feet of construction fence has collapsed and fell to the ground., comply with code

    Sep 28, 2023 · Penalty $1,000

    Resolve
  • Non-hazardous

    Failure to provide all required information to demonstrate compliance with all applicable laws for related application #'s 200485322,200485313,200485304. remedy: provide all required information forthwith.

    Apr 9, 2003

    Resolve

Complaints

No HPD complaints in our records

Complaint data is still being backfilled from NYC Open Data.

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Warehouse (E1)
Year built
2025
Floors
2
Residential units
—
Building area
98,393 ft²
Lot area
48,500 ft²
Zoning
M1-3
Community board
201
Council district
8
Block / lot
2570 / 18
Assessed value
$510,750
Landmark / historic district
No

Questions about 307 Bruckner Boulevard

Who owns 307 Bruckner Boulevard?

The owner of record in NYC Department of City Planning PLUTO data is Sclp I Bruckner, LLC.

Does 307 Bruckner Boulevard have violations?

NYC HPD has no housing violations on record for this property.

Is 307 Bruckner Boulevard rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 307 Bruckner Boulevard built?

City records list 2025 as the year it was built.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.