200 West 167 Street
Bronx, NY 10452BBL 2-02527-0058Map
Owner of record: NYC School Construction Authority
200 West 167 Street is a school building built in 2011 in Bronx, 10452. The owner of record is NYC School Construction Authority. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 19
- ECB violations
- 21
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 28, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2018
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 7, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 6, 2014
Dob violation - resolved
ECB violations · 21
- Class - 2
Failure to maintain building in code-compliant manner. noted: classroom doors do not self-close properly at, 3rd flr-302. 1st flr-105. remedy: repair and/or replace.
Mar 31, 2026 · Penalty $1,250
Active - Class - 2
28-301.1. unlawful display of artwork in corridors greater than 20% per fdny 2008 code; fc 803.3.2. noted: on the 3rd flr-at 301-310 in hallway there are flags hanging from the ceiling, 2nd flr from rm #s 201-2
Mar 31, 2026 · Penalty $1,250
Active - Class - 2
Reissue ecb#35684647z failure to maintain building in code compliant manner.noted:at 4 fl classroom 405 and hallway near rm 411 with water damage/staining and spalling/paint of wall and ceiling.rem:comply with
May 21, 2025 · Penalty $1,250
Resolve - Class - 2
Reissue ecb#35684646r failure to maintain building in code compliant manner.noted:at basement co2/fire pomp room the sprinkler/fire pomp in disrepair of rust/corrosion and leaks at various areas.rem:comply with
May 21, 2025 · Penalty $1,250
Resolve - Class - 2
Reissue #35672662z. failure to maintain building in code-compliant manner. at time of my inspection, i observed at cellar level room co2/fire pump room the sprinkler/fire pump is in state of disrepair due to ru
Jul 24, 2024 · Penalty $1,562
Resolve - Class - 2
Reissue #35672661r. failure to maintain building in code-compliant manner. at time of my inspection, i observerd on the 4th floor classroom 405, 406, and 412, ceilings area, state of disrepair due to water pene
Jul 24, 2024 · Penalty $1,562
Resolve - Class - 2
Reissue#35591615l failure to maintain building in code compliant manner.note observed on 4th floor classroom 405,406,and 412,ceilings are instate of disrepair due to water penetrations from roof above.remedy:re
Mar 28, 2023 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner.note observed atcellar level room c07/fire pump room,the sprinkler/fire pump is in state of disrepair due to rust,corrosion and leaks at various locations o
Mar 28, 2023 · Penalty $625
Resolve - Class - 2
Re-issue #35553638r failure to maintain building in code compliant manner.noted:observed at 4th fl rooms #405, 406, 412 ceilings have damage due to water penetration coming from roof.remedy:repair and/or replac
Mar 21, 2022 · Penalty $1,562
Resolve - Class - 2
Reissue35402068x failure to maintain bldg in codecompliant manner:roofleaks&water damage to rms405,406,412.repair &/or replace.
Mar 4, 2021 · Penalty $1,562
Resolve
Show 11 more ↓
- Class - 2
Emegrency signs at elevator call stations missing defective or non compliant with section requirements noted at 4th + 2nd floors elevators call stations missing/none emergency signs install and or repair signs
Mar 27, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner noted at (4th fl) rooms 405,406,+412 water penetration/damage to ceilings from possible roof leaks repair and or replace
Mar 27, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner noted at 2nd fl gym door in disrepair /racked repair and or replace
Mar 27, 2020 · Penalty $625
Resolve - Class - 2
Failure to maintain building in code compliant manner note at roof level roof leaks in rooms 405,406& 412
Mar 18, 2019
Resolve - Class - 2
Tco 201025862-t005 will expire on 6-10-14. excluded from this tco are rooms co-2,co-2a,co-9 & 125, these rooms are occupied as storage. remedy: discontinue illegal use or amend tco.
May 6, 2014
Resolve - Class - 2
Work does not conform to approved construction documents and or approved amendments and plans required 8'h solid construction fence at new (4 sty) building has not been erected.only jersey barriers and chain
Mar 18, 2013 · Penalty $500
Resolve - Class - 2
Failure to maintain bldg in code compliant manner. 1- all 4 floors elec conduit shaft penetration left open - no curb &/or barrier installed. remedy: maintain bldg as per code.
Feb 8, 2013
Resolve - Class - 2
Failure to maintain bldg in code compliant manner - roof. 1- three metal hoods not secured for storm prep. remedy: maintain bldg as per code-secure all roof parts.
Feb 8, 2013
Resolve - Class - 2
Failure to provide unobstructed exit passageway. north exterior blocked by construction debris &/or materials 1-cmu blocks 2-long roll (possible roofing) 3-misc construction debris covered by snow 4-insuration
Feb 8, 2013 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. 1- along rear wall - rebar exposed no caps. remedy: immediately install rebar caps. maintain site as per code.
Feb 8, 2013
Resolve - Class - 2
Job site fence not constructed pursuant to subsections. 1-site chain link fence gate not operational left open. 2-concrete barriers - w/orange plastic fencing & posts as construction barrior. remedy: install
Feb 8, 2013
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 2011
- Floors
- 4
- Residential units
- —
- Building area
- 54,941 ft²
- Lot area
- 27,410 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2527 / 58
- Assessed value
- $7,107,300
- Landmark / historic district
- No
Questions about 200 West 167 Street
Who owns 200 West 167 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC School Construction Authority.
Does 200 West 167 Street have violations?
NYC HPD has no housing violations on record for this property.
Is 200 West 167 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 200 West 167 Street built?
City records list 2011 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.