roofy

978 Summit Avenue

Bronx, NY 10452BBL 2-02524-0040Map

Owner of record: 979 Ogden LLC

978 Summit Avenue is an elevator apartment building built in 2024 in Bronx, 10452. It has 71 residential units across 8 floors. The owner of record is 979 Ogden LLC. HPD has recorded 9 housing violations here, most recently on June 30, 2026. 3 of the 9 most recent violations are still open.

HPD violations
9
DOB violations
17
ECB violations
12
HPD complaints
17

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jun 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 9

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5d, 5th story, 1st apartment from north at east

    Jun 30, 2026 · Apt 5D

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective door lock at the 1st terrace door from north at east in the 2nd room from north located at apt 5d, 5th story, 1st apartment from north at east

    Jun 30, 2026 · Apt 5D

    Open — Civ14 mailed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical cables at north wall at 1st compactor closet from east, 5th story

    Jun 30, 2026

    Open — Nov certified on time
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3j, 3rd story, 2nd apartment from east at south

    Feb 19, 2026 · Apt 3J

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 19, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 7i, 7th story, 1st apartment from west at north

    Feb 13, 2026 · Apt 7I

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6e, 6th story, 4th apartment from north at east

    Feb 10, 2026 · Apt 6E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 10, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed

DOB building violations · 17

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Seal all accessible openings to secure against unauthorized access and to safeguard public. remove broken glass and seal windows

    Jan 27, 2022

    Dob violation - dismissed
  • Construction other optional

    Due to fire

    Jan 22, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
Show 7 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed

ECB violations · 12

  • Class - 1

    At time of inspection i observed a proposed 8 stroy nb. upon inspecting observed gc unlawfully continued work while on a notice of stope work order. no exterior work and use of pipe scaffold was allowed at expo

    Feb 18, 2025 · Penalty $5,000

    Resolve
  • Class - 2

    Exp4 scaffold bearing on adj.property roof,reviewed scaffold drawings on site application x01108088 pe notes failed reference loads imposed unto adj.property roof and gc failed to provide loads impose letter pe

    Jan 17, 2025 · Penalty $1,250

    Resolve
  • Class - 2

    Shed protection exp2 non conform to pe drawings missing components of top and bottom horizontal brace and cross brace of vert members as per drawings page eq003,elevation 3,section dd.mix components of pipe sca

    Jan 17, 2025

    Resolve
  • Class - 2

    No en drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; please go to https://www1.nyc.gov/site/buildings/codes/energy-conservation-code.page and

    Dec 20, 2024

    Resolve
  • Class - 2

    Observed 8 stories building at 75 feet in height w/out hoist waived w/ ccd1 by fdny & dob w/ the following conditions fire integrity of enclosed stairways not in place at all floors w/out an active standpipe fo

    Dec 12, 2024 · Penalty $5,000

    Resolve
  • Class - 2

    Exp1,3 yodocs not installed to manufacture specs per bc3301.1.3,missing water or sand filled and interlocking components create hazard yodoc become projectile from impact of vehicular traffic leads injury or fa

    Sep 12, 2024

    Resolve
  • Class - 2

    At the time of inspection, adjoining building's foundation wall and exterior wall were exposed without weather proofing at exposure 2. g.c failed to protect adjoining property affected by its demolition and exc

    Feb 6, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    At a closed excavation jobsite. i noticed that at exposure#2 construction fence is missing. as per code jobsite construction fence should be fully enclose allowing no open area for unauthorized person. i notice

    Jan 19, 2023

    Resolve
  • Class - 2

    I observed closed site at excavation phase with 3 excavators inside, fence missing at exp4 and fence is leaning ready to collapse inwards at exp2.

    Dec 27, 2022

    Resolve
  • Class - 2

    Watchperson i observed closed site at excavation phase approximately 60f wide and 100f long(stretching from 979 ogden ave to 978 summit ave). watchperson booth at 979 ogden ave side, i knocked on the fence and

    Dec 27, 2022

    Resolve
Show 2 more ↓
  • Class - 2

    I noticed construction fence at exposure#1 missing viewing panel as per code.

    Jun 14, 2022

    Resolve
  • Class - 1

    Proposed 13 story building at excavation phase.i noticed a retaining wall at exp#3 upon reviewing approved plans i noticed that wall was not depicted on plans.amend plans showing retaining wall .pswo on retaini

    Jun 14, 2022 · Penalty $625

    Resolve

Complaints

  • Door/window

    Door

    Jun 25, 2026 · Apt 5D

    Close
  • General

    Ventilation system

    Jun 18, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    May 24, 2026 · Apt 7R

    Close
  • Heat/hot water

    Entire building

    May 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 4, 2026 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2026 · Apt 3J

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2026 · Apt 7I

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 17, 2026 · Apt 6G

    Close
  • Heat/hot water

    Apartment only

    Feb 11, 2026 · Apt 7I

    Close
Show 7 more ↓
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2025 · Apt 2C

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2025 · Apt 3K

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2025 · Apt 3K

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2025 · Apt 3K

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2025 · Apt 3K

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2025 · Apt 3K

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D9)
Year built
2024
Floors
8
Residential units
71
Building area
62,144 ft²
Lot area
14,000 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2524 / 40
Assessed value
$5,297,400
Landmark / historic district
No

HPD registration #229278, last renewed Sep 17, 2025.

Questions about 978 Summit Avenue

Who owns 978 Summit Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 979 Ogden LLC.

Does 978 Summit Avenue have violations?

Yes. NYC HPD has recorded 9 housing violations at this property.

Is 978 Summit Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 978 Summit Avenue built?

City records list 2024 as the year it was built.

How many apartments are in 978 Summit Avenue?

It has 71 residential units and 72 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.