978 Summit Avenue
Bronx, NY 10452BBL 2-02524-0040Map
Owner of record: 979 Ogden LLC
978 Summit Avenue is an elevator apartment building built in 2024 in Bronx, 10452. It has 71 residential units across 8 floors. The owner of record is 979 Ogden LLC. HPD has recorded 9 housing violations here, most recently on June 30, 2026. 3 of the 9 most recent violations are still open.
- HPD violations
- 9
- DOB violations
- 17
- ECB violations
- 12
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5d, 5th story, 1st apartment from north at east
Jun 30, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective door lock at the 1st terrace door from north at east in the 2nd room from north located at apt 5d, 5th story, 1st apartment from north at east
Jun 30, 2026 · Apt 5D
Open — Civ14 mailed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical cables at north wall at 1st compactor closet from east, 5th story
Jun 30, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3j, 3rd story, 2nd apartment from east at south
Feb 19, 2026 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7i, 7th story, 1st apartment from west at north
Feb 13, 2026 · Apt 7I
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6e, 6th story, 4th apartment from north at east
Feb 10, 2026 · Apt 6E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 10, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Immediate emergency anythingoptional
Seal all accessible openings to secure against unauthorized access and to safeguard public. remove broken glass and seal windows
Jan 27, 2022
Dob violation - dismissed - Construction other optional
Due to fire
Jan 22, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed
Show 7 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 12
- Class - 1
At time of inspection i observed a proposed 8 stroy nb. upon inspecting observed gc unlawfully continued work while on a notice of stope work order. no exterior work and use of pipe scaffold was allowed at expo
Feb 18, 2025 · Penalty $5,000
Resolve - Class - 2
Exp4 scaffold bearing on adj.property roof,reviewed scaffold drawings on site application x01108088 pe notes failed reference loads imposed unto adj.property roof and gc failed to provide loads impose letter pe
Jan 17, 2025 · Penalty $1,250
Resolve - Class - 2
Shed protection exp2 non conform to pe drawings missing components of top and bottom horizontal brace and cross brace of vert members as per drawings page eq003,elevation 3,section dd.mix components of pipe sca
Jan 17, 2025
Resolve - Class - 2
No en drawing approved from dob provided on the job site at the time of inspection., maintain/display required documents; please go to https://www1.nyc.gov/site/buildings/codes/energy-conservation-code.page and
Dec 20, 2024
Resolve - Class - 2
Observed 8 stories building at 75 feet in height w/out hoist waived w/ ccd1 by fdny & dob w/ the following conditions fire integrity of enclosed stairways not in place at all floors w/out an active standpipe fo
Dec 12, 2024 · Penalty $5,000
Resolve - Class - 2
Exp1,3 yodocs not installed to manufacture specs per bc3301.1.3,missing water or sand filled and interlocking components create hazard yodoc become projectile from impact of vehicular traffic leads injury or fa
Sep 12, 2024
Resolve - Class - 2
At the time of inspection, adjoining building's foundation wall and exterior wall were exposed without weather proofing at exposure 2. g.c failed to protect adjoining property affected by its demolition and exc
Feb 6, 2023 · Penalty $1,250
Resolve - Class - 2
At a closed excavation jobsite. i noticed that at exposure#2 construction fence is missing. as per code jobsite construction fence should be fully enclose allowing no open area for unauthorized person. i notice
Jan 19, 2023
Resolve - Class - 2
I observed closed site at excavation phase with 3 excavators inside, fence missing at exp4 and fence is leaning ready to collapse inwards at exp2.
Dec 27, 2022
Resolve - Class - 2
Watchperson i observed closed site at excavation phase approximately 60f wide and 100f long(stretching from 979 ogden ave to 978 summit ave). watchperson booth at 979 ogden ave side, i knocked on the fence and
Dec 27, 2022
Resolve
Show 2 more ↓
- Class - 2
I noticed construction fence at exposure#1 missing viewing panel as per code.
Jun 14, 2022
Resolve - Class - 1
Proposed 13 story building at excavation phase.i noticed a retaining wall at exp#3 upon reviewing approved plans i noticed that wall was not depicted on plans.amend plans showing retaining wall .pswo on retaini
Jun 14, 2022 · Penalty $625
Resolve
Complaints
- Door/window
Door
Jun 25, 2026 · Apt 5D
Close - General
Ventilation system
Jun 18, 2026 · Apt 5D
Close - Heat/hot water
Apartment only
May 24, 2026 · Apt 7R
Close - Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 4, 2026 · Apt 5D
Close - Heat/hot water
Apartment only
Feb 18, 2026 · Apt 3J
Close - Heat/hot water
Apartment only
Feb 18, 2026 · Apt 7I
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 17, 2026 · Apt 6G
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 7I
Close
Show 7 more ↓
- Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 18, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Feb 17, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Feb 12, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Feb 1, 2025 · Apt 3K
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2024
- Floors
- 8
- Residential units
- 71
- Building area
- 62,144 ft²
- Lot area
- 14,000 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2524 / 40
- Assessed value
- $5,297,400
- Landmark / historic district
- No
HPD registration #229278, last renewed Sep 17, 2025.
Questions about 978 Summit Avenue
Who owns 978 Summit Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 979 Ogden LLC.
Does 978 Summit Avenue have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 978 Summit Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 978 Summit Avenue built?
City records list 2024 as the year it was built.
How many apartments are in 978 Summit Avenue?
It has 71 residential units and 72 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.