950 University Avenue is a warehouse built in 1929 in Bronx, 10452. The owner of record is Prime Storage Bronx Mlk Boulevard, LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 80
- ECB violations
- 27
- HPD complaints
- 20
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 80
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 3, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 3, 2022
Dob violation - dismissed
Show 40 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 1, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2019
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 10, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Apr 5, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Apr 5, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 5, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 5, 2010
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2008
Dob violation - resolved
ECB violations · 27
- Class - 2
P.c 102.3 observed water coming off roof into garage ., repair and/or replace
Apr 14, 2025 · Penalty $625
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $1,250
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $1,250
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $1,250
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $1,250
Active - Class - 2
Installation of sidewalk shed w/out a permit.at time of inspection observed installation sidewalk shed w/out permit. remedy:obtain permit for sidewalk shed.
Jan 12, 2022
Resolve - Class - 2
Installation of sidewalk shed w/out a permit.at time of inspection, observed installation sidewalk shed w/out permit. remedy:obtain permit for sidewalk shed.
Jan 12, 2022
Resolve - Class - 2
Installation of sidewalk shed w/out a permit.at time of inspection observed installation sidewalk shed w/out permit. remedy: obtain permit for sidewalk shed.
Jan 12, 2022
Resolve - Class - 1
Work without a permit.at time of inspection while work being done ate roof level consisting of masonry painting and installation of coof roof observed debris chut installed on exterior of building at exposure#3
Jun 13, 2019 · Penalty $625
Resolve - Class - 2
Removal of sidewalk shed/safety measures w/o dept's approval. note:at time of inspection, bldg facade was still designated as unsafe, amended report filed on 5/26/19 has not been accepted and safety measures
Jun 11, 2019 · Penalty $625
Resolve
Show 17 more ↓
- Class - 1
97x17, 57bb07,59bb07,68b07,98bb07,99bb07. 97x17-rts return elevator service and file for reinspection; 57bb07-fire extinguisher tag expired, provide; 59bb07-brake maintenance tag expired provide; 68b07-mainte
Oct 4, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to file acceptable amended cycle 8c report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#807642. remedy: file acceptable report
Aug 1, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable technical report in compliance w/code provisions: periodic inspection of exterior walls and appurtenances as required by artlce 28.302 and the dob rules and regulations.rmdy:file t
Dec 7, 2015 · Penalty $8,000
Resolve - Class - 2
Failure to maintain exterior building as noted: during inspection of building observed damaged mortar joint and swelling at 5th floor exp#1west elevation. file report as per 1rcny 103-04 maintain exterior bldg
Sep 25, 2015 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 26, 2015 · Penalty $4,000
Resolve - Class - 2
Failure to maintain building walls and appurtenances.noted 1-exposure1(west election)spalled & dislodged brickwork at flrs 5&6 at north section;ii-defective gutter at north elevation of sourth bulkhead at roof.
Jul 1, 2013
Resolve - Class - 2
Failure to file an architect / engineer report certifying exit / direcetional signs are connected to emergency power source / storage battery equipment. remedy: file architect / engineer report.
Jan 27, 2010
Resolve - Hazardous
Failure to maintain exterior building wall. defects is : at various location's steal lintels are rusted spalling and defection.remedy:obtain all necessary permits make all necessary repairs.
Oct 10, 2002 · Penalty $440
Resolve - Hazardous
Failure to file an amended round five report acceptalble to this department pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hardous conditions described in initial ll11/98 report. remedy: file an
Sep 6, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to maintain exterior building wall noted in various locations of premesis decorative stone mortar joints spalling and missing mortar and lentils rusted remedy obtain permits and repair make safe to publ
Jul 23, 2002 · Penalty $2,000
Resolve - Hazardous
Failure to file ana amended round five report acceptable to this department pursuant to rule r.c.n.y 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy file an
Jul 5, 2002 · Penalty $1,000
Resolve - Hazardous
Failure to maintain exterior building wall. noted: in various locations of perises decorative stone mortar joints spalling & missing mortar & lentils rusted. remedy; obtain permits & repair make safe to public.
May 24, 2002 · Penalty $2,000
Resolve - Hazardous
Failure to file an amended round five report acceptable to this depa rtment pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll11/98 report. remedy : file
May 3, 2002 · Penalty $400
Resolve - Non-hazardous
Failure to maintain exterior building wall. noted. in various locations of permises decorative stone mortar doints spallings missing mortar & lintels rusted remedy: obtain permits & repair make safe to public.
Mar 19, 2002 · Penalty $800
Resolve - Non-hazardous
Failure to site a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems.remedy: file report.
Jul 26, 1996 · Penalty $500
Active - Non-hazardous
Failure to file a permit of compliance with local law 16/84 certifying to the installation of required fire protection systems.remedy:file report.
Sep 28, 1992 · Penalty $400
Active - Hazardous
Failure to provide emergency power exit lights on staircases and in corridor connecting stairways a & b.failure to provide emergency power exit and directional signs throughout bldg.remedy:provide emergency pow
Sep 28, 1992 · Penalty $800
Active
Complaints
- Door/window
Door
Jan 9, 2021 · Apt BLDG
Close - General
Windows
Mar 8, 2007 · Apt 2S
Close - General
Windows
Mar 8, 2007 · Apt 2S
Close - Plumbing
Water-leaks
Mar 8, 2007 · Apt 2S
Close - Paint/plaster
Door/frame
Mar 8, 2007 · Apt 2S
Close - Paint/plaster
Ceiling
Mar 8, 2007 · Apt 2S
Close - General
Floor
Mar 8, 2007 · Apt 2S
Close - General
Floor
Mar 8, 2007 · Apt 2S
Close - Nonconst
Vermin
Mar 8, 2007 · Apt 2S
Close - Nonconst
Vermin
Mar 8, 2007 · Apt 2S
Close
Show 10 more ↓
- Plumbing
Basin/sink
Mar 8, 2007 · Apt 2S
Close - Paint/plaster
Wall
Feb 24, 2005 · Apt BLVD
Close - General
Floor
Feb 24, 2005 · Apt BLVD
Close - Nonconst
Rubbish
Feb 24, 2005 · Apt BLVD
Close - Nonconst
Rubbish
Feb 24, 2005 · Apt BLVD
Close - Nonconst
Vermin
Feb 24, 2005 · Apt BLVD
Close - Nonconst
Vermin
Feb 24, 2005 · Apt BLVD
Close - Electric
Bell-buzzer/intercom
Feb 24, 2005 · Apt BLVD
Close - General
Locks
Feb 24, 2005 · Apt BLVD
Close - General
Windows
Feb 24, 2005 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Warehouse (E7)
- Year built
- 1929
- Floors
- 8
- Residential units
- —
- Building area
- 141,170 ft²
- Lot area
- 42,200 ft²
- Zoning
- M1-5
- Community board
- 204
- Council district
- 16
- Block / lot
- 2523 / 61
- Assessed value
- $8,674,650
- Landmark / historic district
- No
Questions about 950 University Avenue
Who owns 950 University Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Prime Storage Bronx Mlk Boulevard, LLC.
Does 950 University Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 950 University Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 950 University Avenue built?
City records list 1929 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.