926 Sedgwick Avenue
Bronx, NY 10452BBL 2-02523-0053Map
Owner of record: Sitaram LLC
926 Sedgwick Avenue is a hotel built in 2015 in Bronx, 10452. The owner of record is Sitaram LLC. HPD has recorded 2 housing violations here, most recently on November 22, 2024.
- HPD violations
- 2
- DOB violations
- 16
- ECB violations
- 33
- HPD complaints
- 2
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 22, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2023
Closed — Violation dismissed
DOB building violations · 16
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 3, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 4, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed
Show 6 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 25, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 4, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 6, 2016
Dob violation - dismissed
ECB violations · 33
- Class - 1
Class 1 rts: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition
Oct 15, 2026 · Penalty $1,250
Active - Class - 1
Class 1 c/u: firefighters' service phase i switch inoperative; key cannot be removed from the switch, as per asme a17.1 2.27.3.1. remedy: repair/replace switch to restore proper operation and key removal. email
Oct 15, 2026 · Penalty $1,250
Active - Class - 2
Miscellaneous violation of the electrical code technical standards. observed on the roof the hot water tank room has no remote shutdown at the point of egress for emergency use. remote shutdown must be at the p
Oct 15, 2026 · Penalty $800
Active - Class - 2
Atoi observed excessive storage of combustible materials of carboard boxes, paint buckets, and construction materials in the water meter and fire pump room. contrary to 315.2.3 equipment rooms. combustible mate
Oct 15, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware per bc 1008.1.8 (2014 code); 27-371; bc 1008.1.9 (2014 code); bc 1010.1.8 (2022 code); bc 1010.1.9 (2022 code).obser
Aug 8, 2025 · Penalty $6,250
Resolve - Class - 1
Unsafe storage of combustible material and equipment. observed unsafe storage under stair case.(linen,lamps,boxes,janitorial supplies and misc items) underneath both stair cases. main lobby and 1st fl. potentia
Aug 8, 2025 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner: no fire stopping per bc 712.3 (2014 code); 27-345; bc 711.2.4 (2022 code.observed hole penetrations covered with vent covers. located at 1st fl lobby. pote
Aug 8, 2025 · Penalty $12,500
Active - Class - 2
Class 2:rts failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device in the section of the building is found to be out of service,r
Aug 1, 2025 · Penalty $310
Resolve - Class - 2
Observed temporary hose valve caps( red plastic) installed throughout building. as per 3308.7 of the fire code, temporary coverings shall be immediately removed after the construction is complete., repair and/o
Aug 29, 2024
Resolve - Class - 1
I observed in the halls on all floors the failure to install tamper resistant receptacles as per ll 39/ 2015.; ll 39/2015, comply with ec code; install tamper-resistant receptacles
Aug 29, 2024 · Penalty $800
Resolve
Show 23 more ↓
- Class - 1
I observed on the floors the electrical closet not dedicated to electrical distribution equipment only. the installation of the data wiring, and data equipment is not permitted as per nec. please note the data/
Aug 29, 2024
Resolve - Class - 1
I observed in the water meter room the failure to install the water meter jumper as a required part of the electrical grounding system. failure to install/ maintain the water meter jumper could result in a loss
Aug 29, 2024 · Penalty $4,800
Resolve - Class - 2
Provide an updated maintenance log. clean top of car .clean entire pitarea.
Aug 13, 2024
Resolve - Class - 2
Provide an updated maintenance log.clean entire pit area. clean top ofcar.
Aug 13, 2024
Resolve - Class - 1
Sec. 3303.7.2 fire extinguishers. at the time of inspection of new bldg under construction i observed at every floor throughout bldg. at both stairways,fire extinguishers not properly mounted & being used to
Apr 25, 2018 · Penalty $6,250
Resolve - Class - 1
No site safety plan. at the time of inspection of new bldg under construction no site safety plan was provided or made available upon request. remedy: stop all work entire site. comply w/code contact best for
Apr 25, 2018 · Penalty $12,500
Resolve - Class - 1
No site safety coordinator on site. at the time of inspection of new bldg under construction i observed approx 4 construction workers on site. it was told to mg by the project superintendent that the ssc was no
Apr 25, 2018 · Penalty $25,000
Resolve - Class - 1
Sec. 3310.8.4 no daily log book/site safety log. at the time of inspection of new bldg under construction. no site safety log was provided or made available upon request. remedy: stop all work entire site. comp
Apr 25, 2018 · Penalty $12,500
Resolve - Class - 1
Housekeeping. at the time of my inspection of new bldg under construction i observed at the 4th fl setback at exp#3 construct. material & debris consisting od plywood,empty pallets,duct work,2x4's,cardboard box
Apr 25, 2018 · Penalty $6,250
Resolve - Class - 2
Fence. at the time of my inspection of new bldg under construction,i observed that the chain link fence at exp#1&3 are not solid. fence was not solid/built out of suitable material. remedy: comply w/code.
Apr 25, 2018 · Penalty $2,000
Resolve - Class - 2
Work w/out a permit: expired nb permit. note: 11 story bldg topped & enclosed. observed approx 5-7 workers on site interior tracks setting of scaffolds installing trim. nb# 220211241 expired on 11/11/17. no new
Nov 20, 2017 · Penalty $400
Resolve - Class - 1
Failure to have site safety coordinator on site. note: 1 story bldg erected to 11 flr enclosed. observed 5-7 workers on site w/ no hard hats, no boots, obstructed hallways, ssc arfan mahood is registered as ssc
Nov 20, 2017 · Penalty $10,000
Resolve - Class - 1
Failure to perform hydrostatic pressure test for standpipe. bldg topped at 11 stories above the 75' elevation height.partial stop work orderissued & posted. rem: discontinue all work above 75'. provide passed h
Jul 3, 2017 · Penalty $2,400
Resolve - Class - 2
Work w/out a permit. nb permit# 220211241 expired on 5/11/17. @ time of insp observed 3 workers @ exp#1 ground flr working on a deck including some concrete work. full stop work order issued & posted. rem: disc
Jul 3, 2017 · Penalty $400
Resolve - Class - 2
Sec. 3301.2 failure to safeguard public & properties. numerous treadedscrews used in the (section) of sidewalk shed are sticking out of posts focing inward toward pedestrians traffic have not been capped as
Jul 23, 2016 · Penalty $2,000
Resolve - Class - 2
Temporary construction equipment on site,expired permti fence permti for job site fence (permit #220211241) expired on 7/15/16. remedy: renew permit for fence.
Jul 23, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to provided required sidewalk shed parpet panel/sign sign has not been provided on sw shed parapet. shed runs the entire length of site along sedgwick ave. note: site closed at time of inspection(sat)
Jul 23, 2016 · Penalty $2,000
Resolve - Class - 1
Sec. 3310.5.2 no site safety manager on site. noted: at time of inspection no site safety manager on site. new bldg job site is active. stopall work. provide site safety manager. contact sst for re-inspection.
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 2
Sec. 3314.4.3.2.1 failure to provide installation inspection report for suspended scaffold. noted: at time of inspection suspended scaffoldsinstalled at exp#2 & 4. no installation inspection report was provided
Feb 2, 2016 · Penalty $400
Resolve - Class - 2
Sec. 28-105.12.2 partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises. noted: at time of inspection life lines & tiebacks missing protection on the corners of bulkhead which is contr
Feb 2, 2016 · Penalty $250
Resolve - Class - 2
Failure to provide approved/accepted plans at jobsite at time of inspection.as noted: at time of inspection at an active construction.bldg is a 11 story reinforced concrete no structural plans.onsite,was state
Jan 15, 2016 · Penalty $250
Resolve - Class - 1
Failure to institute/maintain safety equipment or temporary construction (no guardrails). as noted:at time of inspection at active site observed missing guardrails on 8th,9th,10th flrs. failure to maintain guar
Jan 15, 2016 · Penalty $1,200
Resolve - Class - 2
Bc3301.2 failure to cover holes, and institute/maintain safety equip ment measure or temporary construction as noted: at time of inspectionat an active construction observed cut out holes in floors at 5th and
Jan 15, 2016 · Penalty $1,200
Resolve
Complaints
- Heat/hot water
Apartment only
Feb 23, 2026 · Apt 4J
Close - Safety
Window guard broken/missing
Oct 11, 2020 · Apt 602
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (H3)
- Year built
- 2015
- Floors
- 11
- Residential units
- —
- Building area
- 33,057 ft²
- Lot area
- 8,170 ft²
- Zoning
- M1-5
- Community board
- 204
- Council district
- 16
- Block / lot
- 2523 / 53
- Assessed value
- $3,785,850
- Landmark / historic district
- No
HPD registration #228640, last renewed May 20, 2025.
Questions about 926 Sedgwick Avenue
Who owns 926 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Sitaram LLC.
Does 926 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 2 housing violations at this property.
Is 926 Sedgwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 926 Sedgwick Avenue built?
City records list 2015 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.