roofy

136 West 168 Street

Bronx, NY 10452BBL 2-02516-0026Map

Owner of record: 136 Now United Housing Development Fund Corporatio

136 West 168 Street is a walk-up apartment building built in 1926 in Bronx, 10452. It has 36 residential units across 5 floors. The owner of record is 136 Now United Housing Development Fund Corporatio. HPD has recorded 85 housing violations here, most recently on September 4, 2026. 21 of the 50 most recent violations are still open.

HPD violations
85
DOB violations
16
ECB violations
1
HPD complaints
112

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 85

  • B

    Properly repair or replace the broken or defective inoperable gfci electrical outlet at west wall [ 2nd from south ] in the kitchen located at apt 5b, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 5B

    Open — First no access to re- inspect violation
  • B

    M/d law abate the nuisance consisting of lockable slide bolt installed at door in the entrance located at apt 5b, 2nd story, 1st apartment from east at south

    Sep 4, 2026 · Apt 5B

    Open — First no access to re- inspect violation
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post at or near the mailboxes or distribute to each tenant upon commencement of new lease or upon lease renewal, in the form approved by the commissioner, the annual bedbug report and a copy of the dohmh preventing and getting rid of bedbugs safely guide, according to the certification made on such annual bedbug report. at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door leading to east yard fire passageway at boiler room

    Sep 4, 2026

    Open — Nov sent out
  • B

    Provide adequate lighting at rear east fire passageway at boiler room

    Sep 4, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Aug 30, 2025

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ,, in the bathroom located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective inoperable hinges in the entrance located at apt 5a, 1st story, 1st apartment from south at west

    Nov 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 5b, 2nd story, 1st apartment from east at south

    Nov 12, 2024 · Apt 5B

    Closed — Violation dismissed
  • B

    Abate the infestation consisting of vermin flies in the entire apartment located at apt 6b, 2nd story, 2nd apartment from east at south

    Nov 12, 2024 · Apt 6B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material east wall bulkhead, at public hall, 5th story

    Oct 10, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls bulkhead, at public hall, 5th story

    Oct 10, 2024

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective fire retardant material ceiling and west wall intermediate landing, at public hall stairs, 5th story

    Oct 10, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling and west wall intermediate landing, at public hall stairs, 5th story

    Oct 10, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 5a, 1st story, 1st apartment from south at west

    Jan 1, 2024 · Apt 5A

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Jan 1, 2024 · Apt 5A

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 1st story, 1st apartment from south at west

    Jan 1, 2024 · Apt 5A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 17, 2023

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Dec 30, 2022

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Dec 30, 2022

    Open — Not complied with
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (frame missing)

    Aug 23, 2022

    Open — Not complied with
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Aug 23, 2022

    Open — Not complied with
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6d, 4th story, 2nd apartment from east at south

    Aug 23, 2022 · Apt 6D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling & east wall in the bathroom located at apt 6d, 4th story, 2nd apartment from east at south

    Aug 23, 2022 · Apt 6D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain finish enamel at bathtub interior in the bathroom located at apt 6d, 4th story, 2nd apartment from east at south

    Aug 23, 2022 · Apt 6D

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling (approx.4 sq.ft) & east wall (approx.4 sq.ft) in the bathroom located at apt 6d, 4th story, 2nd apartment from east at south

    Aug 23, 2022 · Apt 6D

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling (approx.4 sq.ft) & east wall (approx.4 sq.ft) in the bathroom located at apt 6d, 4th story, 2nd apartment from east at south original violation 15324698 issued 23-aug-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Aug 23, 2022 · Apt 6D

    Open — First no access to re- inspect violation
  • B

    Remove all obstructions and repair all defects in shower compartment drain line in the bathroom located at apt 4b, 4th story, 2nd apartment from north at east

    May 4, 2022 · Apt 4B

    Open — Nov sent out
  • B

    Remove the illegal fastening key operated lock at roof door

    May 4, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective at roof bulk head

    May 4, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    Oct 26, 2021

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from east at south

    Oct 26, 2021 · Apt 2C

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of key opereted lock installed on door leading to ffire escape window in the 1st room from east at south located at apt 2c, 3rd story, 2nd apartment from east at south

    Oct 26, 2021 · Apt 2C

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective device located at apt 3e, 5th story, 1st apartment from north at east

    Mar 5, 2021 · Apt 3E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 6b, 2nd story, 2nd apartment from east at south

    Mar 5, 2021 · Apt 6B

    Closed — Violation closed
  • B

    Replace with new the missing ceramic tiles south wall, in the bathroom located at apt 6b, 2nd story, 2nd apartment from east at south

    Mar 5, 2021 · Apt 6B

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors .. in the entrance located at apt 5b, 2nd story, 1st apartment from east at south

    Mar 5, 2021 · Apt 5B

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling , in the bathroom located at apt 4b, 2nd story, 2nd apartment from north at east

    Mar 5, 2021 · Apt 4B

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4b, 2nd story, 2nd apartment from north at east

    Mar 5, 2021 · Apt 4B

    Closed — Violation closed
  • B

    Provide adequate lighting (bulb missing) at fire passage way at east

    Jun 12, 2019

    Closed — Violation closed

DOB building violations · 16

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2021

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 6 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 1

  • Class - 1

    Failure to maintain bldg walls or appurtenances on the nelson st side of bldg exposure 2 weather roofing with pieces of brick has dislodged from facade above 2 flr @ various points throughout a few pieces were

    Mar 18, 2010 · Penalty $1,000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Feb 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2026 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2025 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2025 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Aug 28, 2025 · Apt 1D

    Close
  • Heat/hot water

    Entire building

    May 22, 2025 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    May 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2024 · Apt BLDG

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Nov 21, 2024 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2024 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2024 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Jan 1, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2024 · Apt 5E

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2024 · Apt 7B

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2024 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2023 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2023 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2023 · Apt 7B

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 14, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2023 · Apt BLDG

    Close
  • Water leak

    Damp spot

    Aug 22, 2022 · Apt 6D

    Close
  • Unsanitary condition

    Mold

    Aug 22, 2022 · Apt 6D

    Close
  • Plumbing

    Bathtub/shower

    Aug 22, 2022 · Apt 6D

    Close
  • Paint/plaster

    Ceiling

    Aug 22, 2022 · Apt 6D

    Close
  • Water leak

    Slow leak

    Aug 5, 2022 · Apt 6D

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C6)
Year built
1926
Floors
5
Residential units
36
Building area
30,800 ft²
Lot area
8,769 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2516 / 26
Assessed value
$733,950
Landmark / historic district
No

HPD registration #209358, last renewed Oct 6, 2025.

Questions about 136 West 168 Street

Who owns 136 West 168 Street?

The owner of record in NYC Department of City Planning PLUTO data is 136 Now United Housing Development Fund Corporatio.

Does 136 West 168 Street have violations?

Yes. NYC HPD has recorded 85 housing violations at this property.

Is 136 West 168 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 136 West 168 Street built?

City records list 1926 as the year it was built.

How many apartments are in 136 West 168 Street?

It has 36 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.