1120 College Avenue
Bronx, NY 10456BBL 2-02434-0007Map
Owner of record: 1120 College Avenue H
1120 College Avenue is a walk-up apartment building built in 1915 in Bronx, 10456. It has 10 residential units across 5 floors. The owner of record is 1120 College Avenue H. HPD has recorded 132 housing violations here, most recently on June 11, 2026. 34 of the 50 most recent violations are still open.
- HPD violations
- 132
- DOB violations
- 8
- ECB violations
- 1
- HPD complaints
- 103
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 132
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective connection at waste pipe of the sink in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation riser pipe at east wall in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Jun 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly secure the loose metal door frame at building entrance door , 1st story
May 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in vestibule , 1st story
May 11, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and north, east and west walls in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection at drain line at sink in the kitchen located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
May 11, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and north, east and west walls in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east original violation 18911988 issued 11-may-26 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
May 11, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective broken glass at upper sash at public hall stairs, 2nd story
Jul 11, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the foyer located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at front yard , 1st story
Jul 11, 2025
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling at vestibule , 1st story
Jul 11, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective defective cornice at west exterior at building front, 1st story , 1st story
Jul 11, 2025
Open — Nov sent out - BHazardous
Properly secure the loose escucheon plate at upper riser in the 2nd room from east located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the kitchen located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of scalding hot water at all kitchen and bathroom fixtures thermometer #7344 reading 134 degrees in the kitchen located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly secure the loose escucheon plate at upper riser in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd room from east located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures and outlets in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom return system at building front leading to private hallway at north wall in the private hallway located at apt 2a, 3rd story, 1st apartment from north at east
Jul 11, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the riser in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Feb 2, 2023 · Apt 3A
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Feb 2, 2023
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at west wall in vestibule at public hall, 1st story
Feb 2, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in vestibule at public hall, 1st story
Feb 2, 2023
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum incandescent required at front areaway
Jan 23, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 1
- Class - 2
Failure to maintain building wall(s) or appurtenances. noted: at time of inspection - rooftop metal cornice at southwest corner of exposure 1 observed deteriorated & rusted: creating an opening & causing cornic
Mar 12, 2026
Resolve
Complaints
- Unsanitary condition
Mold
Oct 19, 2026 · Apt 2A
Open - Electric
Lighting
Oct 19, 2026 · Apt 2A
Open - Door/window
Door
Jun 8, 2026 · Apt 2A
Close - Plumbing
Basin/sink
Jun 8, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jun 8, 2026 · Apt 2A
Close - Electric
Lighting
Jun 8, 2026 · Apt 2A
Close - Safety
Smoke detector
Jun 8, 2026 · Apt 2A
Close - Electric
Wiring
Mar 24, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close
Show 40 more ↓
- Safety
Smoke detector
Feb 5, 2026 · Apt 2A
Close - Plumbing
Basin/sink
Feb 5, 2026 · Apt 2A
Close - Door/window
Door frame
Feb 5, 2026 · Apt 2A
Close - Electric
Outlet/switch
Feb 5, 2026 · Apt 2A
Close - Electric
Lighting
Feb 5, 2026 · Apt 2A
Close - Plumbing
Toilet
Feb 5, 2026 · Apt 2A
Close - Electric
No lighting
Jun 5, 2025 · Apt 2A
Close - Plumbing
Basin/sink
Jun 5, 2025 · Apt 2A
Close - Water leak
Slow leak
Jun 5, 2025 · Apt 2A
Close - General
Bell/buzzer/intercom
Jun 5, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Jun 5, 2025 · Apt 2A
Close - Electric
Lighting
Jun 5, 2025 · Apt 2A
Close - Electric
Outlet/switch
Jun 5, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2024 · Apt 3A
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt 4B
Close - Electric
No lighting
Aug 18, 2022 · Apt 2A
Close - Electric
No lighting
Aug 18, 2022 · Apt BLDG
Close - General
Signage missing
Aug 18, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 20, 2022 · Apt BLDG
Close - Electric
No lighting
Jul 20, 2022 · Apt BLDG
Close - Safety
Fire escape
Jul 20, 2022 · Apt BLDG
Close - Plumbing
Water supply
May 24, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 3, 2022 · Apt BLDG
Close - Paint/plaster
Wall
Jul 28, 2021 · Apt 2A
Close - Plumbing
Water supply
Jun 5, 2020 · Apt 1A
Close - Heat/hot water
Entire building
Jun 5, 2020 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jun 5, 2020 · Apt 1A
Close - Electric
Power outage
Jun 5, 2020 · Apt 1A
Close - Electric
Power outage
Nov 16, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 16, 2019 · Apt BLDG
Close - Electric
Power outage
Jul 29, 2019 · Apt BLDG
Close - Safety
Fire escape
Jul 29, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2019 · Apt 3A
Close - Electric
No lighting
Jun 19, 2018 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1915
- Floors
- 5
- Residential units
- 10
- Building area
- 11,040 ft²
- Lot area
- 3,851 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2434 / 7
- Assessed value
- $826,200
- Landmark / historic district
- No
HPD registration #204082, last renewed Feb 26, 2026.
Questions about 1120 College Avenue
Who owns 1120 College Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1120 College Avenue H.
Does 1120 College Avenue have violations?
Yes. NYC HPD has recorded 132 housing violations at this property.
Is 1120 College Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1120 College Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 1120 College Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.