299 East 158 Street
Bronx, NY 10451BBL 2-02418-0001Map
Owner of record: 299 Bronx LLC
299 East 158 Street is a walk-up apartment building built in 1931 in Bronx, 10451. It has 14 residential units across 5 floors. The owner of record is 299 Bronx LLC. HPD has recorded 485 housing violations here, most recently on October 17, 2026. 50 of the 50 most recent violations are still open.
- HPD violations
- 485
- DOB violations
- 10
- ECB violations
- 3
- HPD complaints
- 442
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 485
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
§27-2033.3(b) correct failure to install an internet capable temperature reporting device in one living room in apartment ... located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft. but less than 30 sq.ft. observed at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in the waste line at washbasin in the bathroom located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at west located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east, north and west walls in the 1st room from north at west located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of extention cord running from/to unit ''la'' to cellar at public hall, 1st story
Oct 17, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system incorrect information posted at public hall, 1st story
Oct 17, 2026
Open — Nov sent out - IInformation / order
The property has been issued an order to identify and address underlying conditions and violations related to the order. failure to comply may result in extensive repair work to correct underlying conditions and related violations by hpd. charges for repair work done pursuant to this order, if not paid, will become tax liens on the property
Oct 13, 2026
Open — Info nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. observed at ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 3rd room from east located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. observed at ceiling in the kitchen located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - BHazardous
§27-2033.3(b) correct failure to install an internet capable temperature reporting device in one living room in apartment ... located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south
Oct 3, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at basement
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ''incorrect information'' at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence of rats at front yard at front areaway
Sep 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of electrical extension cord at floor from basement to apartment # la at 1st story causing trip hazard at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 4b, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Refit upper sash window at south wall in the kitchen located at apt 4b, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from east located at apt 4b, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4B
Open — Nov sent out
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
ECB violations · 3
- Class - 1
I observed unsafe unsuitable electrical conditions in hallway, use of extension cord as permanent wiring from apt la to basement, open live splices without protection and open fixture subject to damage and elec
Aug 22, 2026 · Penalty $1,600
Active - Class - 2
Failure to file required annual boiler inspection reports for low-pressure boiler 20000155590y0001 in accordance with the rules of the department. 1rcny 103-01(d)(1) requires that an annual inspection report fo
Dec 16, 2024 · Penalty $3,125
Active - Class - 2
Failure to maintain bldg in code-compliant manner. noted: mechanical duct installed at corner store, 1st sty and going horizontally to exp 4, to change direction and going vertically to roof parapet wall apprx
Jan 10, 2013 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Mold
Sep 23, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Sep 23, 2026 · Apt 4B
Close - Door/window
Window pane
Sep 23, 2026 · Apt NA
Close - Door/window
Window pane
Sep 23, 2026 · Apt NA
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt NA
Close - Electric
Wiring
Sep 23, 2026 · Apt NA
Close - Unsanitary condition
Pests
Sep 22, 2026 · Apt L1
Close - Unsanitary condition
Garbage/recycling storage
Sep 22, 2026 · Apt L1
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 2C
Close
Show 40 more ↓
- Plumbing
Basin/sink
Sep 14, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Sep 14, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Sep 14, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Sep 11, 2026 · Apt 4B
Close - Door/window
Door
Sep 11, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 2C
Close - Safety
Smoke detector
Sep 11, 2026 · Apt 4B
Close - Safety
Carbon monoxide detector
Sep 11, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Sep 11, 2026 · Apt 4B
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 4B
Close - Door/window
Door
Sep 11, 2026 · Apt 3A
Close - Safety
Smoke detector
Sep 11, 2026 · Apt 3A
Close - Safety
Carbon monoxide detector
Sep 11, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Sep 11, 2026 · Apt 3A
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 2C
Close - Door/window
Door
Sep 11, 2026 · Apt 2C
Close - Safety
Smoke detector
Sep 11, 2026 · Apt 2C
Close - Safety
Carbon monoxide detector
Sep 11, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Sep 11, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Sep 11, 2026 · Apt 2C
Close - Safety
Fire escape
Sep 11, 2026 · Apt NA
Close - Unsanitary condition
Pests
Sep 11, 2026 · Apt 4B
Close - Door/window
Door
Sep 11, 2026 · Apt NA
Close - General
Cabinet
Aug 13, 2026 · Apt A2
Open - Door/window
Window pane
Aug 13, 2026 · Apt A2
Open - Unsanitary condition
Pests
Aug 13, 2026 · Apt A2
Open - Plumbing
Basin/sink
Aug 1, 2026 · Apt 2A
Close - Door/window
Window pane
Aug 1, 2026 · Apt 2A
Close - Appliance
Electric/gas range
Aug 1, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Aug 1, 2026 · Apt 2A
Close - Appliance
Refrigerator
Aug 1, 2026 · Apt 2A
Close - General
Cabinet
Jul 10, 2026 · Apt A2
Open - Appliance
Refrigerator
Jul 10, 2026 · Apt A2
Open - General
Cabinet
Jul 10, 2026 · Apt A2
Open - Door/window
Window pane
Jul 10, 2026 · Apt A2
Open - Flooring/stairs
Stairs
Jul 10, 2026 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Jul 10, 2026 · Apt A
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jul 1, 2026 | $1,650,000 | Rentals - walkup apartments | 15 |
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1931
- Floors
- 5
- Residential units
- 14
- Building area
- 11,815 ft²
- Lot area
- 2,405 ft²
- Zoning
- R7-2
- Community board
- 201
- Council district
- 17
- Block / lot
- 2418 / 1
- Assessed value
- $1,018,350
- Landmark / historic district
- No
HPD registration #206486, last renewed Nov 5, 2024.
Questions about 299 East 158 Street
Who owns 299 East 158 Street?
The owner of record in NYC Department of City Planning PLUTO data is 299 Bronx LLC.
Does 299 East 158 Street have violations?
Yes. NYC HPD has recorded 485 housing violations at this property.
Is 299 East 158 Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 299 East 158 Street built?
City records list 1931 as the year it was built.
How many apartments are in 299 East 158 Street?
It has 14 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.