1141 Washington Avenue
Bronx, NY 10456BBL 2-02388-0048Map
Owner of record: Washington Holdings Of NY LLC
1141 Washington Avenue is a mixed residential and retail building built in 1920 in Bronx, 10456. It has 2 residential units across 3 floors. The owner of record is Washington Holdings Of NY LLC. HPD has recorded 12 housing violations here, most recently on December 24, 2008. 12 of the 12 most recent violations are still open.
- HPD violations
- 12
- DOB violations
- 18
- ECB violations
- 3
- HPD complaints
- 44
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 2, 2nd story, apartment at north
Dec 24, 2008 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2, 2nd story, apartment at north
Dec 24, 2008 · Apt 2
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2, 2nd story, apartment at north
Dec 24, 2008 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline sink in the kitchen located at apt 2, 2nd story, apartment at north
Dec 24, 2008 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of exposed electrical wires at ceiling in the 2nd room from east located at apt 2, 2nd story, apartment at north
Dec 24, 2008 · Apt 2
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2fl, 2nd story, apartment at north
Dec 24, 2008 · Apt 2FL
Open — Nov sent out - BHazardous
Replace the broken or defective water tank cover at water closet in the bathroom located at apt 2fl, 2nd story, apartment at north
Dec 24, 2008 · Apt 2FL
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt 2fl, 2nd story, apartment at north
Dec 24, 2008 · Apt 2FL
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1fl, 1st story, 1st apartment from south at west
Nov 18, 2004 · Apt 1FL
Open — Nov sent out - BHazardous
Abate the nuisance consisting of vermin (mice) in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Nov 18, 2004 · Apt 1FL
Open — Nov sent out
Show 2 more ↓
- BHazardous
Abate the nuisance consisting of vermin (roaches) in the entire apartment located at apt 1fl, 1st story, 1st apartment from south at west
Nov 18, 2004 · Apt 1FL
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1fl, 1st story, apartment at west
Nov 18, 2004 · Apt 1FL
Open — Nov sent out
DOB building violations · 18
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 8 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Construction other optional
C-construction other optional
Mar 20, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 18, 2016
Dob violation - dismissed
ECB violations · 3
- Class - 1
Filed a certificate,form,application etc., containing a material falsestatement(s).on 2/17/16 at 1pm, i observed newly installed sprinkler system incomplete in cellar. sprinkler system was missing caps for con
Feb 17, 2016 · Penalty $4,800
Resolve - Class - 1
Work w/o permit. on 2/17/16 at 1pm i observed 4 new gas fired commercial cooking equipment installed on 1st and cellar flr. new gas piping also was insalled from cellar 1st flr to supply gas to commercial cook
Feb 17, 2016 · Penalty $1,600
Resolve - Class - 2
Gas being supplied to bldg w/o inspection and certification by dob.on 2/17/16 at 1pm i observed new illegal gas piping installed from a legal authorized gas meter to supply gas thru new gas meter bar for 1 pizz
Feb 17, 2016 · Penalty $500
Resolve
Complaints
- Heat/hot water
Entire building
Feb 17, 2016 · Apt 2
Close - Heating
Heat related
Feb 5, 2009 · Apt 2FL
Close - Plumbing
Toilet
Dec 23, 2008 · Apt 2FL
Close - Plumbing
Basin/sink
Dec 23, 2008 · Apt 2FL
Close - General
Floor
Dec 23, 2008 · Apt 2FL
Close - Electric
Wiring
Dec 23, 2008 · Apt 2FL
Close - Plumbing
Water-leaks
Dec 23, 2008 · Apt 2FL
Close - Paint/plaster
Ceiling
Dec 23, 2008 · Apt 2FL
Close - Heating
Heat related
Dec 23, 2008 · Apt 2FL
Close - General
Floor
Dec 21, 2008 · Apt 2
Close
Show 34 more ↓
- Paint/plaster
Wall
Dec 21, 2008 · Apt FL2
Close - Electric
Wiring
Dec 21, 2008 · Apt FL2
Close - Paint/plaster
Ceiling
Dec 21, 2008 · Apt 2
Close - Plumbing
Water-leaks
Dec 21, 2008 · Apt 2
Close - Plumbing
Toilet
Dec 21, 2008 · Apt FL2
Close - Plumbing
Toilet
Dec 21, 2008 · Apt 2
Close - Plumbing
Basin/sink
Dec 21, 2008 · Apt 2
Close - Paint/plaster
Wall
Dec 21, 2008 · Apt 2
Close - Heating
Heat related
Dec 21, 2008 · Apt 2
Close - Electric
Wiring
Dec 21, 2008 · Apt 2
Close - Plumbing
Basin/sink
Dec 21, 2008 · Apt FL2
Close - Nonconst
Vermin
Dec 21, 2008 · Apt FL2
Close - Paint/plaster
Wall
Dec 21, 2008 · Apt FL2
Close - General
Doors
Dec 21, 2008 · Apt FL2
Close - Plumbing
Water-leaks
Dec 21, 2008 · Apt FL2
Close - Paint/plaster
Ceiling
Dec 21, 2008 · Apt FL2
Close - Paint/plaster
Ceiling
Dec 21, 2008 · Apt FL2
Close - Heating
Heat related
Dec 21, 2008 · Apt FL2
Close - Heating
Heat related
Dec 15, 2004 · Apt 1FL
Close - Heating
Heat related
Oct 22, 2004 · Apt 1FLOO
Close - Heating
Heat related
Oct 22, 2004 · Apt 1
Close - Plumbing
Basin/sink
Oct 22, 2004 · Apt 1FL
Close - Nonconst
Vermin
Oct 22, 2004 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 20, 2004 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 20, 2004 · Apt 1FL
Close - Heating
Heat related
Jan 19, 2004 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 17, 2004 · Apt 1FL
Close - Plumbing
Water-leaks
Jan 17, 2004 · Apt 1FL
Close - Paint/plaster
Ceiling
Jan 17, 2004 · Apt 1FL
Close - Heating
Heat related
Jan 6, 2004 · Apt 1FL
Close - Heating
Heat related
Jan 4, 2004 · Apt 1FL
Close - General
Floor
Sep 12, 2003 · Apt 2
Close - Nonconst
Vermin
Aug 5, 2003 · Apt 1FL
Close - Nonconst
Vermin
Aug 5, 2003 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S2)
- Year built
- 1920
- Floors
- 3
- Residential units
- 2
- Building area
- 5,698 ft²
- Lot area
- 2,124 ft²
- Zoning
- M1-1/R7-2
- Community board
- 203
- Council district
- 16
- Block / lot
- 2388 / 48
- Assessed value
- $68,460
- Landmark / historic district
- No
Questions about 1141 Washington Avenue
Who owns 1141 Washington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Washington Holdings Of NY LLC.
Does 1141 Washington Avenue have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 1141 Washington Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1141 Washington Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 1141 Washington Avenue?
It has 2 residential units and 3 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.